1
Ground Floor UFL 0 First Floor UFL 3065 405 265 2900 265 2800 7230 2550 2741 Flat Roof 6230 Bulkhead: refer to drw. no. MGH15047-220-230 Ceilings: refer to drw. no. MGH15047-220-230 New shopfront refer to schedule SF01 GF-01 New entrance refer to schedule Joinery: refer to drw. no. MGH15047-600 2841 Feature wall: refer to drw. no. MGH15047-600 Existing Door to be raised within drywall. Make good all trades flush plaster ceiling fixed to underside of soffit through 50x38mm battens Existing shopfront to remain New access Floor to later specification 150 Ground Floor UFL 0 First Floor UFL 3065 Flat Roof 6230 2741 2841 ceiling height ceiling height Existing windows to remain 2559 bulkhead height SF09 GF-10 SF07 GF-07 D09 FF-01 50 50mm Shadow line cornice by capco OSA Bulkhead: refer to drw. no. MGH15047-220-230 Ceilings: refer to drw. no. MGH15047-220-230 Joinery: refer to drw. no. MGH15047-600 Feature wall: refer to drw. no. MGH15047-600 flush plaster ceiling fixed to underside of soffit through 38x50mm battens New Access Floor at 150mm AFFL to later specification Ground Floor UFL 0 First Floor UFL 3065 Existing Floor -510 SECURITY OFFICE FF-01 PASSAGE FF-04 OFFICE GF-05 INDUCTION ROOM GF-08 MALE LOCKERS GF-10 PARA. ABLUTIONS GF-12 2800 265 2900 INDUCTION/MEETING ROOM GF-03 3365 230 4180 110 4025 110 1015 110 850 110 2010 230 1265 110 3843 230 5678 3310 265 485 STORAGE GF-13 PASSAGE GF-04 Flat Roof 6230 Ceiling: refer to drw. no. MGH15047-220-230 Ceilings: refer to drw. no. MGH15047-220-230 Door to be demolished and replaced refer to schedule Existing shopfront to remain position of existing slab SF08 GF-09 existing column existing wall existing windows W2 W3 W3 Window to be demolished and new window to be repostioned to underside of beam. Make good all trades. flush plaster ceiling fixed to underside of soffit through 38x38mm battons stairwell behind backfill compacted to 95% MODASHTO Ground Floor UFL 0 First Floor UFL 3065 Existing Floor -510 FIRE EQUIPMENT STORAGE GF-11 FEMALE LOCKERS GF-09 KITCHEN GF-07 Existing window 3310 Flat Roof 6230 Ceiling: refer to drw. no. MGH15047-220-230 Ceilings: refer to drw. no. MGH15047-220-230 Door to be demolished and replaced and repositioned refer to schedule and drw. no. MGH15047-200-210. New windows to be centered in rooms and align to existing window head height on NORTH elevation flush plaster ceiling fixed to underside of soffit through 38x50mm battens D09 FF-02 D03 GF-03 D02 GF-04 bulkhead: refer to drw. no. MGH15047-220-230 SF03 GF-03 Joinery: refer to drw. no. MGH15047-600 position of existing slab backfill compacted to 95% MODASHTO NGL NGL GENERAL NOTES: THIS DRAWING MUST NOT BE SCALED. DIMENSIONS AND LEVELS ARE TO BE CHECKED. THE LATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTING OUT OF SHOP DRAWINGS. THE DESIGN SHOWN ON THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT. QUALITY OF MATERIALS AND WORKMANSHIP TO COMPLY WITH THE LATEST RELEVANT CODES AND SPECIFICATIONS OF SANS AND SABS AND THE MINIMUM STANDARDS OF STANDARD PRELIMINARIES (JBCC) AND MODEL PREAMBLES FOR TRADES (2008-ASQS) AND WERE APPLICABLE. PROJECT SPECIFICATIONS. ALL BOUNDARIES, DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORE CONSTRUCTION AND ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT. FOR THE PURPOSE OF COORDINATION, ALL RELAVANT PARTIES MUST CHECK THIS INFORMATION PRIOR TO IMPLEMENTATION. ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT. DO NOT SCALE THIS DRAWING. PARTIAL SERVICE: ANY DISCREPANCIES WITH SITE OR OTHER INFORMATION IS TO BE ADVISED TO THE ARCHITECT AND DIRECTION OR APPROVAL IS TO BE SOUGHT BEFORE THE IMPLEMENTATION OF THE DETAIL. CONTRACTOR TO PROVIDE SAMPLES OF FINISHES FOR ARCHITECTS APPROVAL. WHERE DEVIATIONS TO SPECIFICATIONS ARE CONTEMPLATED THE CONTRACTOR MUST REQUEST APPROVAL FROM THE ARCHITECT. Revision No Project No Date Drawings Project Drawn Scale Project Address (Farm name/Portion no): Klipfontein/203-IQ. Randburg, City of Johannesburg ARCHITECTS: PRAKASEN GOVENDER SACAP : 5278 SIGNATURE: Purpose of Drawing: Cell: 083 777 2627 • Tel: (031) 584 7200 • Fax: (031) 584 7203 Email: [email protected] • www.pgaarchitects.co.za Drawing No STAMPS AND NOTES: TENDER MURRAY HARDMAN SACAP: CANT 24750393 CLIENT SIGNATURE DATE: / / 1 : 50 21-Oct-15 5:08:37 PM MGH - 15047 310 MINTEK PROPOSED NEW INTERIOR REFURBISHMENTS - MINTEK GATEHOUSE SECTIONS A.S 1 : 50 SECTION A-A 1 1 : 50 SECTION B-B 2 1 : 50 SECTION C-C 3 1 : 50 SECTION D-D 4 Revision Schedule Revision Number Revision Date Revision Description
Transcript
Page 1: SECTION A-A SECTION B-B 1 2 · position of existing slab SF08 GF-09 existing column existing wall existing windows W3 W2 ... FF-02 D03 GF-03 D02 GF-04 bulkhead: refer to drw. no.

Ground Floor UFL

0

First Floor UFL

3065

405

265

2900

265

2800

7230

2550

2741

Flat Roof

6230

Bulkhead: refer to drw. no. MGH15047-220-230

Ceilings: refer to drw. no. MGH15047-220-230

New shopfront refer to schedule

SF01

GF-01 New entrance refer to schedule

Joinery: refer to drw. no. MGH15047-600

2841

Feature wall: refer to drw. no. MGH15047-600

Existing Door to be raised withindrywall. Make good all trades

flush plaster ceiling fixed to underside of soffitthrough 50x38mm battens

Existing shopfront to remain

New access Floor to later specification

150

Ground Floor UFL

0

First Floor UFL

3065

Flat Roof

6230

2741

2841

ceiling height

ceiling height

Existing windows to remain

2559

bulkhead height

SF09

GF-10

SF07

GF-07

D09

FF-01

5050mm Shadow line cornice by capco OSA

Bulkhead: refer to drw. no. MGH15047-220-230

Ceilings: refer to drw. no. MGH15047-220-230

Joinery: refer to drw. no. MGH15047-600

Feature wall: refer to drw. no. MGH15047-600

flush plaster ceiling fixed to underside of soffit through 38x50mmbattens

New Access Floor at 150mm AFFL to laterspecification

Ground Floor UFL

0

First Floor UFL

3065

Existing Floor

-510

SECURITY OFFICE

FF-01

PASSAGE

FF-04

OFFICE

GF-05INDUCTION ROOM

GF-08

MALE LOCKERS

GF-10

PARA. ABLUTIONS

GF-12

2800

265

2900

INDUCTION/MEETING ROOM

GF-03

33652304180110402511010151108501102010

230 1265 110 3843 230

5678

3310

265

485

STORAGE

GF-13

PASSAGE

GF-04

Flat Roof

6230

Ceiling: refer to drw. no. MGH15047-220-230

Ceilings: refer to drw. no. MGH15047-220-230

Door to be demolished and replaced referto schedule

Existing shopfront to remain

position of existing slab

SF08

GF-09

exis

ting c

olu

mn

exis

ting w

all

existing windows

W2W3W3

Window to be demolished and new window tobe repostioned to underside of beam. Makegood all trades.

flush plaster ceiling fixed to underside of soffitthrough 38x38mm battons

stairwell behind

backfill compacted to 95% MODASHTO

Ground Floor UFL

0

First Floor UFL

3065

Existing Floor

-510

FIRE EQUIPMENT STORAGE

GF-11

FEMALE LOCKERS

GF-09

KITCHEN

GF-07

Existing window

3310

Flat Roof

6230

Ceiling: refer to drw. no. MGH15047-220-230

Ceilings: refer to drw. no. MGH15047-220-230

Door to be demolished and replaced andrepositioned refer to schedule and drw. no.MGH15047-200-210.

New windows to be centered in rooms andalign to existing window head height onNORTH elevation

flush plaster ceiling fixed to underside of soffitthrough 38x50mm battens

D09

FF-02

D03

GF-03

D02

GF-04

bulkhead: refer to drw. no. MGH15047-220-230

SF03

GF-03

Joinery: refer to drw. no. MGH15047-600

position of existing slab

backfill compacted to 95% MODASHTONGLNGL

GENERAL NOTES:

THIS DRAWING MUST NOT BE SCALED. DIMENSIONS AND LEVELS ARE TO BE CHECKED. THELATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTINGOUT OF SHOP DRAWINGS. THE DESIGN SHOWN ON THIS DRAWING IS COPYRIGHT AND REMAINSTHE PROPERTY OF THE ARCHITECT.

QUALITY OF MATERIALS AND WORKMANSHIP TO COMPLY WITH THE LATEST RELEVANT CODESAND SPECIFICATIONS OF SANS AND SABS AND THE MINIMUM STANDARDS OF STANDARDPRELIMINARIES (JBCC) AND MODEL PREAMBLES FOR TRADES (2008-ASQS) AND WEREAPPLICABLE. PROJECT SPECIFICATIONS.

ALL BOUNDARIES, DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BEFORECONSTRUCTION AND ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT.

FOR THE PURPOSE OF COORDINATION, ALL RELAVANT PARTIES MUST CHECK THISINFORMATION PRIOR TO IMPLEMENTATION. ANY DISCREPANCIES TO BE REPORTED TO THEARCHITECT.

DO NOT SCALE THIS DRAWING.

PARTIAL SERVICE: ANY DISCREPANCIES WITH SITE OR OTHER INFORMATION IS TOBE ADVISED TO THE ARCHITECT AND DIRECTION OR APPROVAL IS TO BE SOUGHTBEFORE THE IMPLEMENTATION OF THE DETAIL.

CONTRACTOR TO PROVIDE SAMPLES OF FINISHES FOR ARCHITECTS APPROVAL.

WHERE DEVIATIONS TO SPECIFICATIONS ARE CONTEMPLATED THE CONTRACTOR MUSTREQUEST APPROVAL FROM THE ARCHITECT.

Revision NoProject No

Date

Drawings

Project

Drawn Scale

Project Address (Farm name/Portion no): Klipfontein/203-IQ. Randburg, City of Johannesburg

ARCHITECTS: PRAKASEN GOVENDER SACAP : 5278

SIGNATURE:

Purpose of Drawing:

Cell: 083 777 2627 • Tel: (031) 584 7200 • Fax: (031) 584 7203Email: [email protected] • www.pgaarchitects.co.za

Drawing No

STAMPS AND NOTES:

TENDER

MURRAY HARDMAN SACAP: CANT 24750393

CLIENT SIGNATURE DATE: / /

1 : 5021-Oct-155:08:37 PM

MGH - 15047 310

MINTEK

PROPOSED NEW INTERIOR REFURBISHMENTS -MINTEK GATEHOUSE

SECTIONS

A.S

1 : 50

SECTION A-A1

1 : 50

SECTION B-B2

1 : 50

SECTION C-C3

1 : 50

SECTION D-D4

Revision Schedule

RevisionNumber Revision Date Revision Description

Recommended