+ All Categories
Home > Documents > Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US...

Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US...

Date post: 11-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
37
Semi-Final Plans Public Information Meeting US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER October 3, 2019 OCTOBER 3, 2019
Transcript
Page 1: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Semi-Final Plans Public Information Meeting

US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER

October 3, 2019

OCTOBER 3, 2019

Page 2: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Tonight’s Agenda• Introductions• Project Status

• Budget• Schedule• Development Process

• Public Survey Results – FHI• Preliminary Plans Update – Gill

• Project Scope• Project Decisions• Lower Treatment Options• Safety Barrier Color

• Next Steps• Discussion

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Potential Barrier Design

Page 3: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Vermont Agency of Transportation • J. B. McCarthy, P. E., Project Manager

Gill Engineering • Amy Spera, P. E.

Fitzgerald & Halliday, Inc. – Public Outreach• Jill Barrett• Shawna Kitzman, AICP

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Introductions

Page 4: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Project Status• Budget

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Phase Programmed Spent-to-Date

Scoping $50,000 $45,076

PE $675,000 $208,829

ROW $0 $0

Construction $8,135,000 $0

TOTAL $8,860,000 $253,905

Page 5: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Project Status• Schedule

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 6: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Project Development Process

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Preliminary Design:

Site plan and construction limits

Barrier refinement

Property owner meetings (none needed)

Right-of-Way process (not needed)

Public input on preliminary design

Final Design:

Design/detailing of bridge components (Fall ’19 - Spring ‘20)

Develop Final plans, specifications, and construction estimate

Secure ALL environmental permits and utility clearances

Page 7: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Public Survey

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 8: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Survey Results• Which barrier color do you prefer?

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Black

Green

Page 9: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Survey Results• Do you prefer a straight, curved, or angled upper barrier?

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Straight

Curved

Angled

Page 10: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Upper Barrier Design

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Straight Curved Angled

Page 11: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Survey Results• Do you prefer a lowered barrier with vertical lines or a circle design?

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Vertical Lines

Circle Design

Other

Page 12: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Lower Barrier Design

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Vertical Lines Circle Design

Page 13: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Survey Results

QUECHEE GORGE BRIDGE | PUBLIC MEETING

• Would you like the vehicle barrier height to be 24 inches or 34 inches?[Note: This element under design review. A 34-inch rail may not be feasible with crosswalks close to the ends of the bridge.]

24-inch barrier

34-inch barrier

Page 14: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Comparison: Vehicular Barrier Height

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Considerations:• Number of rails and visibility (taller barrier has three railings)• Size of transition at the end of the bridge (bigger transition for taller railing)

Page 15: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Vehicular Barrier Example

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 16: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Preliminary Plans Update

Page 17: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Project Design - Gill EngineeringBridge Preservation – “Forever Bridge”

• Repair steel arch truss members• Replace deck (partial width) and new wider sidewalks• Replace joint and bearing • Waterproof membrane and pave• Clean and paint bridge• Stabilize the eastern shale slope• Apply water-repellant to substructures, sidewalks and fascias

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 18: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Project Design - Gill EngineeringSafety Improvements

• Curb-mounted vehicular railing• Increased sidewalk width = 6’-0” (existing = 3’-6”)• Pedestrian safety barrier• Sidewalk extensions to parking lots (West) and Visitor’s Center

(East)

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 19: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Existing Bridge Cross Section

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 20: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Proposed Bridge Cross Section

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 21: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Existing Sidewalk Connectivity

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 22: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Proposed Sidewalk Connectivity

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 23: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Approach Sidewalks (design is in progress)

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 24: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Pedestrian Safety BarrierBarrier Design Considerations:• Total Height = 9’

• Maximum height for bridge inspection equipment• Upper portion (above 42”) will consist of vertical steel balusters,

spaced 8” on center• Must have locations of removal panels for recovery access• Lower portion will serve as a pedestrian railing, and as such:

• Must have a rail 42” above the top of sidewalk• Must be composed of horizontal and vertical elements that are

arranged so that a 4” diameter sphere cannot pass through the clear opening

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 25: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Design Decisions to DatePaint Color: GreenUpper Barrier Treatment: Curved

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 26: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Seeking Your Input On

Lower Barrier Treatment

Page 27: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Option 1:Lower Barrier Treatment – Circles

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 28: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Option 2:Lower Barrier Treatment – Bar

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 29: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Option 3:Lower Barrier Treatment – Arch

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 30: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Option 4:Lower Barrier Treatment – Arch + Bar

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 31: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Summary:Lower Barrier Treatment Options

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Option 1 Option 2

Option 3 Option 4

Page 32: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Barrier Color – Green

QUECHEE GORGE BRIDGE | PUBLIC MEETING

14062 14090 14110

Page 33: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Barrier Color – Green

QUECHEE GORGE BRIDGE | PUBLIC MEETING

14062 14090 14110

Page 34: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Seeking Your Input On

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Pedestrian Safety Barrier: • Lower treatment:

• Option 1: circles• Option 2: bar• Option 3: arch• Option 4: arch + bar

• Color: shade of green

Page 35: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Next Steps

Complete the design

Prepare documents for bidding

Advertise contract

Award bid

Hold Pre-Construction meeting with public

QUECHEE GORGE BRIDGE | PUBLIC MEETING

Page 36: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

Discussion

Page 37: Semi-Final Plans Public Information Meeting · Semi-Final Plans Public Information Meeting . US ROUTE 4 – BRIDGE 61 OVER OTTAUQUECHEE RIVER. October 3, 2019. OCTOBER 3, 2019

HTTP://VTRANS.VERMONT.GOV/PROJECTS/QUECHEE

QUECHEE GORGE BRIDGE | PUBLIC MEETING


Recommended