Senior Design Project: Parallel Task Scheduling in Heterogeneous
Computing Environments
Senior Design Students: Christopher Blandin and Dylan MachovecPost-doctoral Scholar: Bhavesh KhemkaFaculty Advisor: H. J. Siegel
Senior Design Presentation
2
Outline
n motivationn our system modeln problem statementn existing workn simulation detailsn future work
3
Motivation
n High Performance Computing (HPC) used by wide variety of fields to solve challenging problems5 physics simulations, oil and gas industry,
climate modeling, computational biology, computational chemistry, and many more
n improving performance increases productivity in these fieldsn we plan on improving performance of system
by designing novel scheduling techniquesn scheduling refers to the assignment and
ordering of tasks to machines for execution
4
System Model – Definitions
n heterogeneity5 differing execution characteristics
n homogeneity5 have the same execution characteristics
n oversubscribed5 more tasks arriving than the
system can execute immediately
5
System Model – Cluster Modeln clusters have multiple homogeneous nodesn clusters are heterogeneous from each othern nodes may have multiple multicore processorsn each node may only have one task running at a given time
5 avoids interference between tasks
n task assignments are done at node-leveln a task cannot be spread across two clusters
6
System Model – Workload Characteristics
n dynamically arriving tasksn when a task arrives, scheduler obtains the following information:
5 arrival time5 execution time
g different times on different clusters (because of heterogeneity)
5 number of processing cores required5 value function
n tasks are heterogeneousn no pre-emption
7
System Model – Value Function
n each task has a value function5 represents value of the task when it completes5 value function may be different for each task5 monotonically decreasing functions
n value functions can be fully described with four parameters5 a constant starting value5 after soft deadline value decays linearly to a final value5 after hard deadline value drops to zero
8
Problem Statement
n we measure the performance of a scheduler in our environment as the sum of the value earned by completing tasks over a given amount of time
n goal of heuristics: maximize total sum of value earned over a given amount of time5 improve performance of HPC systems
n main contribution5 design, simulation, and analysis of resource allocation
heuristics for task schedulingg heterogeneous HPC system with multiple clustersg tasks with associated value functions
with soft and hard deadlinesg each task executes in parallel over multiple cores
9
t4
t2
Mapping Eventn mapping event: when task assignment decision(s) are maden trigger mapping event whenever:
5 a node becomes available, or5 a task arrives
n during mapping event, all tasks that have not been reserved or have not started execution are considered mappable
n only makes task assignments that can start now5 heuristic may or may not make reservations
n1
n2
n3
n4
t1
t6
unmapped tasks set nodes of cluster 1
time
t11t9
t13
t12
n1
n2
nodes of cluster 2
t5
t8
t10
current time
t7 t3
t2 t4
10
Planned Heuristics
n four planned heuristics5 EASY Backfilling5 FCFS with Multiple Queues5 Max-Max Value5 Max-Max Value-Per-Resource
n submit to Metaheuristics International Conference (MIC 2015)5 submission deadline: 2/6/15
11
Existing Work – Dr. Siegel’s Group
n focuses on utility of tasks5 B. Khemka, R. Friese, L. D. Briceño, H. J. Siegel, A. A.
Maciejewski, G. A. Koenig, C. Groer, G. Okonski, M. M. Hilton, R. Rambharos and S. Poole, “Utility Functions and Resource Management in an Oversubscribed Heterogeneous Computing Environment,” IEEE Transactions on Parallel and Distributed Systems, accepted 2014, to appear.
n another work that models stepped value functions5 J-K Kim, S. Shivle, H. J. Siegel, A. A. Maciejewski, T. D.
Braun, et al. “Dynamically Mapping Tasks with Priorities and Multiple Deadlines in a Heterogeneous Environment,” Journal of Parallel and Distributed Computing, vol. 67, no. 2, pp. 154-169, Feb. 2007
12
Existing Work
n other parallel task scheduling techniques5 EASY Backfilling
g D. A. Lifka, “The ANL/IBM SP Scheduling System,” Proc. First Workshop Job Scheduling Strategies for Parallel Processing, pp. 295-303, 1995.
5 S. Gerald, R. Kettimuthu, A. Rajan and P. Sadayappan, “Scheduling of Parallel Jobs in a Heterogeneous Multi-Site Environment,” Job Scheduling Strategies for Parallel Processing, pp. 87-104, 2003.
13
Design of Parallel Simulator for Experiments
n extends existing serial simulator from Dr. Siegel’s group5 modified to handle scheduling of parallel tasks
n created new modules5 cluster class
g has nodes within it5 methods for obtaining parallel task information from
workload trace5 created a sleep task object to model
idle time within each machinen developed an algorithm to locate slots for parallel
tasks within the area occupied by sleep tasksn developed a method that picks the nodes that create the best
packing (i.e., create the least future restrictions)
14
Workloads for Simulations
n will use Dr. Dror Feitelson’s Parallel Workload Trace to model the workload arrival5 workload log from Curie Supercomputer
in France (has 93,312 cores)t using last 10 months of data
n may use Downey’s model for execution time scaling
15
Future Work
n Use simulator to implement and compare the planned heuristicsn running a post-mortem analysis
5 use a genetic algorithm to find a loose upper bound solution when we know in advance the arrival time and characteristics of all tasks
n since scheduling is NP-hard it is hard to quantify the performance of heuristics5 this analysis will give us a better
metric to compare our results with
18
Packing Nodes Efficientlyn whenever an assignment is to be made,
all heuristics pick the nodes that create the least amount of restrictions for future assignments5 e.g., if task t8 needs 3 nodes, it will be assigned: n1, n2, n5
n1
n2
n3
n4
n5
current time
t8
t8
t8
time
19
Heuristics – Overviewn EASY Backfilling
5 considers tasks in a first come first serve (FCFS) order5 makes only one reservation for the first
task that cannot fit on idle machines5 backfills other tasks so that they do no delay the reservation
n FCFS with Multiple Queues5 puts the tasks in three queues5 takes 1, 4, and 8 tasks from the large, medium, and small
queues respectively5 assigns tasks if possible, and otherwise makes the earliest
reservation for them5 repeats until the queues are empty
20
Heuristics – Overviewn Max-Max Value
5 First phase: Considering all tasksg Determine the allocation choice that will earn it the
highest value without delaying any place holder tasku If there are ties, pick the choice with the earlier
completion time5 Second phase: Consider tasks from first phase
g Make assignment or a place-holder for the choice that earns the highest valueuThis assignment should not start execution after the
start of the earliest place holder task5 Repeat the two phases until no more tasks can be mapped
n Max-Max Value-Per-Resource5 Similar to Max-Max Value