Session 11CONS Construction Process “You guys don’t have time.” (Charles Berliner)
Transcript

Session 11CONS Construction Process

“You guys don’t have time.” (Charles Berliner)

What forms the foundation for successful construction?

•Excellent Communication

•Excellent Organization

Communication

• It is important to understand what the role of all team members are in the project

• Establish leadership roles in all areas of design, construction and house operation

Communication

• Facilitate regular dialogue between team members

Communication

• Successful teams will have a constant flow of information between all team members

Organization

• A team that communicates well should also have a strong sense of organization

• All phases of building design and construction should be appropriately planned, scheduled and documented

• The development of a master project schedule is essential to completing a project properly, on time and on budget

• All core team members should have involvement in creating project schedules, and all involved with the project should be aware of and have easy access to schedules

• Hold regular meetings to discuss schedules, both to ensure that scheduled tasks are being attended to, and to assess whether any modifications need to be made to the schedule.

Scheduling

• Schedules are a great way to unify all aspects of design and construction in one location

Scheduling

• Organization is key to maintaining control over a project

• Weekly team-wide meetings can be arranged to discuss goals for the upcoming week, clarify the construction schedule, and offer an opportunity to bring up potential impending construction issues

Scheduling

• Update schedules often to stay relevant to construction

• Scheduled weekly meetings at the construction site offer an opportunity to discuss progress

Scheduling

• Immersion in the construction process

• It is important to play an active role in managing the construction process

• Being involved on the construction site will help to assure that the project is being built according to the design intent

• Team communication with contractors helps to foster a mutual understanding of design intent versus constructability

• Being involved in the construction process is a great educational experience that cannot be replicated in a classroom setting

Construction Process

• The more completely teams understand their projects, the more controlled the construction process will be

• An effective way to become familiar with the project is to have individual team members become “experts” in certain areas of construction.

• Experts can take additional leadership role during their phase of construction

• Constant team communication will also allow team members to become more aware of the relationships between different building divisions

Construction Process

• Opportunity to understand and appreciate the process of building

Construction Process

• Understand all of the components that make up a building

• Observe and document these components as they are added

Construction Process

• Manage the proper sequencing of phases of construction to ensure nonstop work and avoid backtracking

Construction Process

• In order to help maintain order during construction, certain team members should focus on coordinating and managing conflicts.

• These team members should have a strong working knowledge of all components of the house, in addition to having good communication skills and construction knowledge

Documentation

• Utilize construction documents and BIM model to resolve conflicts before they arise during construction

• Group redlining sessions for construction documents, project manual and shop drawings are an opportunity for team members of different disciplines to identify and solve problems together

• It is important for teams to critically analyze shop drawings in comparison to their own construction documents, as shop drawings often form the final set of documents used in the assembly of a building

Documentation - BIM

• Utilize BIM modeling to streamline the construction process

• Instead of encountering conflicts in the field, discover and resolve them through the use of the 3D model

Documentation – Construction Documents

• Contractors will build based on how they interpret the documents

• Specificity and precision in the document set will minimize guesswork during construction

• Periodic reviews of documents with contractors will serve to clarify design and build intent

Documentation – Shop Drawings

Review

• Final walkthroughs of a completed project should include the same level of organization and communication that occurred during the rest of the construction process.

• Organize all field documentation so that it can easily be referenced

• All aspects of the project should be cross-referenced with all schedules, documentation and drawings to ensure that the project was built according to the design