Shared Shared Generators-LTOA Generators-LTOA customers customers WRLDC,Mumbai WRLDC,Mumbai
Transcript
Page 1: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Shared Shared Generators-LTOA Generators-LTOA

customerscustomers

WRLDC,MumbaiWRLDC,Mumbai

Page 2: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

NSPCL---NTPC&SAIL JOINT NSPCL---NTPC&SAIL JOINT VENTURE,BHILAIVENTURE,BHILAI

Page 3: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Metering Arrangment for NSPCL STAGE-3 (Total No. of SEMs to be provided by PGCIL=9Nos.)

#1 #2 #3 #4

#1 #2

#1 #2

`

SEMs Loacation in Inter-State Transmission System associated with NSPCL

BHILAI 400 / 220 KV S/S (CSEB)

400 KV(NSPCL)

2*250MW

RAIPUR 400kV (POWERGRID)

M M

S S

M M

M Main meter S

Stand-by meter

BSP

220kVBSP

CPP I CPP II36MW 74MW

BHILAI -III 220 / 132 KV S/S (CSEB)

220kV (NSPCL)

2x315MVA

ww wwww ww

S

M

WR GRID

4*1252*160

132kv 132kv

M

220KV GURUR(CSEB) M M

c c

M M

M M

M M

c c

M Mc c

M SEMs proided by NSPCL

cM M

c

Page 4: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Brief on NTPC-SAIL joint Brief on NTPC-SAIL joint ventureventure

• 2*250MW M/S Bhilai CPP-II Expansion project.

• A joint venture of NTPC and SAIL• LTOA for 170MW is approved• 100MW to DNH & 70MW to D&D

under LTOA

Page 5: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Brief----Contd…Brief----Contd…

• Out of balance 330MW….• 280MW will be transferred to

BSP/SAIL through dedicated system owned by BESCL…

• 50MW to CSEB through exclusive CSEB system

Page 6: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Commercial ArrangementsCommercial Arrangements• NSPCL is connected with WR, ISTS

through ..400kV NSPCL-Raipur D/C,

owned, maintained and operated by NSPCL

• BSP is connected with NSPCL through

.. 220kV NSPCL-BSP two D/Cs

Page 7: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Commercial Commercial Arrangements…contdArrangements…contd

• CSEB is connected with NSPCL through …

..220kV NSPCL-Bhilai-III S/C&

..220kV NSPCL-Gurur S/C(tap on 220kV NSPCL-Bhilai-III)

• CSEB is connected with BSP through..220kV Khedamara-BSP D/C

Page 8: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

METERING ARRANGEMENTSMETERING ARRANGEMENTS• SEMs(same specification as ours) are

installed by NSPCL on ..All the out going feeders

emanating from 400kV &220kV NSPCL bus

..All the GTs and ICTs

Page 9: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

METERING ARRANGEMENTSMETERING ARRANGEMENTS• SEMs are proposed by WRLDC and

installed by NSPCL on …..both ends of 220kV

Khedamara-BSP D/C..both ends of 220kV BhilaiIII-

NSPCL S/C..At Gurur on 220kV NSPCL-

Gurur(tap on 220kV NSPCL-Bhilai-III)

Page 10: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Torrent Power Torrent Power

Limited,SugenLimited,Sugen

LTOA-II

Page 11: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Torrent Power Torrent Power Limited,SugenLimited,Sugen

Stand-by Meters Check Meters Main Meter

#1 #2 #1 #2 #1 #2

SURAT220kV S/S-220kV lines To TPL(Torrent Power Ltd)

S S S

M M M

S S S

M M M M MM

C C CC C C

S S S S S S

M MC C

S S

220kV KIM S/S -GETCO

DEHGAM 400kVS/S(PG)

PIRANA 400kV S/S(PG)-expected by 2010 Vapi 400kV S/S(PG) Gandhar 400kV S/S(NTPC)

CM M

C

M S

M

C

M MC C

MMMM

LILO of Dehgam-Gandhar-1

LILO of Vapi-Gandhar

S C M SEMs provided by Torrent,SUGEN

SM

MC

Page 12: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Torrent Power Torrent Power Limited,SugenLimited,Sugen

• 3*365MW(1095MW) generation project at SUGEN

• LTOA for 500MW approved• LTOA customers are yet finalized• Balance 595MW will be transferred to

TPSEC &TPAEC through their internal lines.

Page 13: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Torrent Power Torrent Power Limited,SugenLimited,Sugen

• SUGEN is connected with WR,ISTS through … LILO of 400kV Gandhar-Vapi S/C

(completed)…proposed LILO of 400kV Gandhar-

Dehgam line-1(temporary arrangement till 400kV PIRANA 400kV S/S of POWERGRID commissioning)

…400kV SUGEN-PIRANA D/C….400kV Pirana(SUGEN)-Pirana(PG)

D/C…400kV Dehgam-Pirana S/C

Page 14: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Torrent Power…contd.Torrent Power…contd.• SUGEN is connected with SURAT

through three 220kV D/C (to Ved,Puna&Bhatar)

• SUGEN is connected with GECTO at KIM through 220kV D/C

Page 15: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

LTOA-IIILTOA-III

JINDAL POWER LTD,TAMNAR

Page 16: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

JINDAL POWER LTDJINDAL POWER LTD

JINDAL POWER LTD,Tamnar(400kV)

Stand-by Meters Check Meters Main Meter

GT-1(250MW) GT-2(250MW)

JINDAL POWER LTD,Tamnar(400kV)

RAIPR-PG(400kV)

S S

C

M M

C

S C M

ST-2,100MVA400/33kV

33kVTamnar

S

M M

GT-3(250MW)

GT-4(250MW)

ST-1,100MVA400/33kV

3*33/6.6kV

6.6kV Tamnar

220kV Tamnar

LILO at Jindal Estate

JSPCL steel Plant(Raigarh)

Raigarh(220kV) CSEB

ST-3,220kV/6.6kV,40MVA

M S

Budhipadar(ER)

Korba(E)Raigarh(220kV)-PG

M

Existing SEM

2*315MVA,400/220kV

Page 17: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

JINDAL POWER LTDJINDAL POWER LTD• 4*250MW generation project at

Tamnar,CSEB• 3*250MW is connected to 400kV bus

and 1*250MW is connected to 220kV bus

• LTOA allowed for 500MW• GUVNL=300MW &CSEB=100MW• Balance 100MW will proportionately

allocate o GUVNL&CSEB

Page 18: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

JINDAL POWER LTDJINDAL POWER LTD• Jindal is connected with WR grid

through 400kV Raipur-Jindal D/C which is built,owned & operated by Jindal

• Jindal is connected with CSEB through 220kV Rigarh-Jindal(Tamnar) D/C

• Supply of power ti Jindal Steelplant & Jindal estate through 220kV lines.

Page 19: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

LTOA-IVLTOA-IV

LANCO-AMARKANTK THERMAL POWER STATION,PATHADI

Page 20: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

LANCO-AMARKANTAK LANCO-AMARKANTAK THERMAL POWER STATIONTHERMAL POWER STATION

Stand-by Meters Check Meters Main Meter

GT-1(300MW) GT-2(300MW) ST-1(400/6.6kV)

LANCO AMARKANTAK (400kV)

SIPAT -NTPC(400kV) KSTPS-NTPC(400kV)

M

C

S

S S S

C

M M

C

S C M

Page 21: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

LANCO-AMRKANTAKLANCO-AMRKANTAK• 2*300MW generation at

Pathadi,Chhattisgarh• LTOA approved is 300MW• LTOA customer is MPPTCL• 400kV Korba-Sipat is made LILO at

Pathadi for the evacuation of 300MW of power.

Page 22: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customerscustomers

– Treatment of deviations from schedules

• Option-I : LTOA generator as UI pool member

• Option-II : LTOA generator as embedded in the host state

• Option-III : Hybrid model based on case to case basis (not advisable).

Page 23: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

Demarcation of scheduling periphery• LTOA generators are separate control

areas with a schedule. Example: for Sugen (Torrent), the

scheduling periphery becomes Sugen 400kv bus whereas for NSPCL, the scheduling periphery becomes Raipur 400kV, since the lines to Raipur are owned by NSPCL. In the case of Jindal, the scheduling periphery becomes 400kV Raipur. For Lanco, the scheduling periphery is at 400kV Pathodi

Page 24: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

– Is gaming certification required for the LTOA generators on DC or on approved LTOA quantum?

– The meters are to be provided by the LTOA customer at their own cost and meters shall have to comply with specifications as per Annexure-2 to Chapter-6 of IEGC.

Page 25: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

– POWERGRID shall have to keep additional stock of around 100 meters and 15 DCDs to meet the requirement of LTOA customers. The cost of the meters shall have to be paid by the LTOA customers.

– Maintenance and testing of SEMs at LTOA generators bus as in the case of NSPCL, the SEMs used for accounting shall come under the scope of POWERGRID and the payment for the same to be borne by the LTOA customers.

Page 26: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

– Some LTOA generators are having MPP status and their tariff is fixed by CERC. Whether different treatment is required for such plants?

– Treatment of power drawn during construction

– Treatment of infirm power from LTOA generators

Page 27: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

• Metering Scheduling and Accounting of LTOA customers in WR

• Metering: Schematic diagrams showing the locations of meters for NSPCL at Bhilai Chattisgarh, LANCO-AMARKANTAK at Patahdi Chattisgarh, Jindal at Tamnar Chattisgarh and Torrent at SUGEN, Gujarat are enclosed at Annexure-I. The committee may approve for the locations and for the number of meters.

Page 28: Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Issues related to STOA Issues related to STOA customers..contd.customers..contd.

• Scheduling: Common scheduling request for mutually agreed quantum signed by LTOA generators and their respective customers shall have to be sent to RLDCs. The scheduling quantum may be specified at injecting utility’s control area periphery. This quantum shall be restricted to their approved LTOA quantum. This arrangement for scheduling is required as the allocations in percentage are not available as in the case of ISGS stations. Similarly revisions of schedules may also be informed to RLDCs