+ All Categories
Home > Documents > SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

Date post: 29-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
5
VICINITY MAP N.T.S. THERE WILL BE NO CHANGES IN SPECIFICATION, DIMENSIONS, OR MATERIALS UNLESS APPROVED BY THE ENGINEER RESPONSIBLE FOR THIS DRAWING. THE DRAWINGS ARE PREPARED COOPERATIVELY BY THE NATURAL RESOURCE CONSERVATION SERVICE FOR THE NAMED LANDOWNER. CONSTRUCTION FOUND NOT IN ACCORDANCE WITH THESE DRAWINGS AND SPECIFICATIONS SHALL VIOLATE THE COOPERATIVE AGREEMENT AND ALL DRAWINGS, SPECIFICATIONS, AND QUANTITIES ESTIMATE SHALL IMMEDIATELY BE RETURNED TO THE LOCAL NRCS OFFICE. GENERAL NOTES: x PLEASE CONTACT THE DISTRICT SOIL CONSERVATION DISTRICT AT LEAST 3 DAYS PRIOR TO CONSTRUCTION TO ARRANGE A PRE-CONSTRUCTION MEETING @ PHONE # x A CONSERVATION TECHNICIAN SHALL VERIFY CUT/GRADE STAKES AT THE CONTRACTORS REQUEST MATERIALS LIST ALL EXCAVATION AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE MARYLAND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (MOSHA) STANDARDS AS SET FORTH IN THE LATEST VERSION OF THE CODE OF MARYLAND REGULATIONS SAFETY REGULATIONS LANDOWNER/PROJECT 614 - WATERING FACILITY (DISTRICT soil conservation district) CONSTRUCTION NOTIFICATION The Contractor/Owner is to notify the SOIL CONSERVATION DISTRICT at least 72 hours prior to construction to facilitate any scheduling, layout, or preliminary mobilization necessary to ensure proper construction inspection to enable appropriate certification of the project. It is the Landowner's responsibility to obtain all County, State, and Federal permits that may be needed, and to maintain this structure and related regulations. DISTRICT SITE OWNER/CONTRACTOR STATEMENT I CERTIFY THAT THIS DESIGN HAS BEEN EXPLAINED TO ME BY A REPRESENTATIVE OF THE ______________________ SOIL CONSERVATION DISTRICT, AND I UNDERSTAND THE CONTENTS, ALL CONSTRUCTION WILL BE DONE ACCORDING TO THESE PLANS AND SPECIFICATIONS, I FURTHER UNDERSTAND THAT ALL CONSTRUCTION WILL BE UNDER THE INSPECTION OF THIS OFFICE. OWNER'S SIGNATURE DATE CONTRACTOR'S SIGNATURE DATE DISTRICT THE CONSERVATION PRACTICE(S) MEETS OR EXCEEDS NRCS STANDARDS AND SPECIFICATIONS SIGNATURE DATE AS-BUILT STATEMENT INSPECTED BY CONSTRUCTION APPROVAL VERIFIED DISTRICT CONSERVATIONIST SIGNATURE DATE SIGNATURE DATE
Transcript
Page 1: SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

VICINITY MAP

N.T.S.

THERE WILL BE NO CHANGES IN SPECIFICATION, DIMENSIONS, OR MATERIALS

UNLESS APPROVED BY THE ENGINEER RESPONSIBLE FOR THIS DRAWING.

THE DRAWINGS ARE PREPARED COOPERATIVELY BY THE NATURAL

RESOURCE CONSERVATION SERVICE FOR THE NAMED LANDOWNER.

CONSTRUCTION FOUND NOT IN ACCORDANCE WITH THESE DRAWINGS AND

SPECIFICATIONS SHALL VIOLATE THE COOPERATIVE AGREEMENT AND ALL

DRAWINGS, SPECIFICATIONS, AND QUANTITIES ESTIMATE SHALL

IMMEDIATELY BE RETURNED TO THE LOCAL NRCS OFFICE.

GENERAL NOTES:

PLEASE CONTACT THE DISTRICT SOIL CONSERVATION DISTRICT AT

LEAST 3 DAYS PRIOR TO CONSTRUCTION TO ARRANGE A

PRE-CONSTRUCTION MEETING @ PHONE #

A CONSERVATION TECHNICIAN SHALL VERIFY CUT/GRADE STAKES AT

THE CONTRACTORS REQUEST

MATERIALS LIST

ALL EXCAVATION AND METHODS OF CONSTRUCTION SHALL BE

IN ACCORDANCE WITH THE MARYLAND OCCUPATIONAL

SAFETY AND HEALTH ADMINISTRATION (MOSHA) STANDARDS

AS SET FORTH IN THE LATEST VERSION OF THE CODE OF

MARYLAND REGULATIONS

SAFETY REGULATIONS

LANDOWNER/PROJECT614 - WATERING FACILITY

(DISTRICT soil conservation district)

CONSTRUCTION NOTIFICATION

The Contractor/Owner is to notify the SOIL

CONSERVATION DISTRICT at least 72 hours prior to

construction to facilitate any scheduling, layout, or preliminary

mobilization necessary to ensure proper construction

inspection to enable appropriate certification of the project.

It is the Landowner's responsibility to obtain all County, State,

and Federal permits that may be needed, and to maintain this

structure and related regulations.

DISTRICT

SITE

OWNER/CONTRACTOR STATEMENT

I CERTIFY THAT THIS DESIGN HAS BEEN

EXPLAINED TO ME BY A REPRESENTATIVE OF

THE ______________________ SOIL

CONSERVATION DISTRICT, AND I UNDERSTAND

THE CONTENTS, ALL CONSTRUCTION WILL BE

DONE ACCORDING TO THESE PLANS AND

SPECIFICATIONS, I FURTHER UNDERSTAND

THAT ALL CONSTRUCTION WILL BE UNDER THE

INSPECTION OF THIS OFFICE.

OWNER'S SIGNATURE DATE

CONTRACTOR'S SIGNATURE DATE

DISTRICT

THE CONSERVATION PRACTICE(S) MEETS OR EXCEEDS

NRCS STANDARDS AND SPECIFICATIONS

SIGNATURE DATE

AS-BUILT STATEMENT

INSPECTED BY

CONSTRUCTION APPROVAL

VERIFIED DISTRICT

CONSERVATIONIST

SIGNATURE DATE

SIGNATURE DATE

Page 2: SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

PLAN VIEW

GRAVITY FEED SYSTEMS

MISC. DETAILS

Natural Resources Conservation Service

United States Department of Agriculture

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

TILE DRAINDETAIL

TILE DRAIN DETAIL

N.T.S.

MOUND BACKFILL TO ALLOW FOR SETTLING

" CORRUGATED DRAIN TILE

SOIL BACKFILL

MIN 3' DEPTH

DEPTH

"

" WIDE

Natural Resources Conservation Service

United States Department of Agriculture

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

TRENCH BACKFILLDETAIL

BACKFILL DETAIL

N.T.S.

MOUND BACKFILL TO ALLOW FOR SETTLING

SUPPLY PIPE

SOIL BACKFILL

(BACKFILL WITH MACHINE)

MIN 3' DEPTH

BACKFILL TO 12" OVER PIPE, BY

HAND AND WITH SOIL CONTAINING

NO STONES CAPABLE OF

DAMAGING PIPE

12"

NOTE:

WHERE THE SOIL FROM EXCAVATING THE

TRENCH IS UNSUITED FOR BACKFILL, SAND

MAY BE USED AS AN ECONOMICAL MATERIAL

FOR THIS PURPOSE

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

SHUT-OFF VALVEDETAIL614-SOVNatural Resources Conservation Service

United States Department of Agriculture

4" SCH 40 PVC PIPE

LENGTH WILL VARY DUE TO SUPPLY LINE DEPTH

1FT

TO TROUGHTO WELL/TROUGH

SHUT-OFF VALVE

4" SCH 40 THREADED CAP W/ COUPLER

LOCATION TO BE DETERMINED BY

LANDOWNER

SHUT-OFF VALVE DETAIL

N.T.S.

ON/OFF TOOL STORED

INSIDE OF PIPE

(SEE DETAIL BELOW)

3" +/-

1 1/2" +/- SCH

40 PVC PIPE

NOTCH

"TEE" ON VALVE

SIMPLE TOOL FOR

TURNING VALVE ON/OFF

(HEIGHT TO BE

DETERMINED AT

INSTALLATION)

CUT NOTCHES LARGE ENOUGH TO

ENGAGE "TEE" ON SHUT OFF VALVE

TOOL FOR SHUT-OFF DETAIL

N.T.S.

5" CR #6 STONE

6' SIZE WILL VARY6'

4" PVC COLLAR

MIN. 4" SCH. 40 PVC OUTLET PIPE

OUTLET

MIN. 10'- OF 4" SCH. 40

PIPE W/ RODENT GUARD

REMOVABLE STAND PIPE

4" SCH. 40 PVC INLET PIPE

PRE-APPROVED WATERER

6" X 6" - 6 GA. WELDED

WIRE MESH

4" CONCRETE (MIN 3000 PSI)

Natural Resources Conservation Service

United States Department of Agriculture

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

WATERING FACILITY(GRAVITY)614-BGFT

4" SCH. 40 "TEE"

4" SCH. 40 SCREW CAP

AT OUTLET

4" SCH. 40 PVC INLET PIPE

MIN. 4" SCH. 40 PVC OUTLET PIPE

WATERING FACILITY DETAIL

NOTE: THIS OPTION CAN REPLACE THE

COLLECTION BOX IF DISTANCE BETWEEN

OUTLET AND TROUGH IS LESS THAN 250FT.

NOTE: USE SCH 40 PIPE WITHIN 10FT OF

THE TROUGH AND OUTLET. ALL OTHER

PIPE MAY BE ASTM F405 HEAVY DUTY

CORRUGATED POLY TUBING.

2% SLOPE MIN (TYP.)

30" MIN. COVER

3"

DOUBLE PIPE TEE FLUSH SYSTEM OPTION

N.T.S.

N.T.S.

4" SCH 40 "90"

4" SCH 40 "90"

MIN CLASS SE FILTER CLOTH

INFLOW OUTFLOW

File N

o.

Date

Draw

ing N

o.

Sheet of

Draw

n

Designed

Checked

Approved

WA

TE

RIN

G F

AC

ILIT

Y(G

RA

VIT

Y)

614-

AG

FT

4

" P

E

R

F

. D

R

A

IN

T

IL

E

SUPPLY LINE DETAIL

NOTES:

1. EXACT LOCATION OF SUPPLY LINE TO BE DETERMINED DURING

CONSTRUCTION BY THE LANDOWNER AND SOIL CONSERVATION

DISTRICT

2. ALL LINES TO HAVE A MIN 24" COVER

3. OVERFLOW LINE TO EXTEND TO OUTLET AS APPROVED. A 10FT SECTION

OF SCH 40 PVC SHALL BE INSTALLED AT THE OUTLET WITH RODENT

GUARD

4. SPECIFY 12" OPENING IN BOTTOM OF TROUGH. OPENING TO BE

CONCRETED AFTER PIPE INSTALLATION. (USE HYDRAULIC CEMENTS, NO

PRE-MIXED MATERIAL)

5. CONCRETE APRON MUST HAVE 6 GAUGE 6"X6" WELDED WIRE MESH

6. CONCRETE TO BE MINIMUM 3000 PSI WITH 5% AIR ENTRAINMENT AND A

SLUMP OF 3-5 INCHES.

7. COLLECTION BOX AND TROUGH INLET/OUTLET PIPES SHALL BE 10' OF

SCH 40 PVC PIPE

INSTALLATION NOTES:

1. GRADE PAD FOR TROUGH AND INSTALL INLET PIPE, INCLUDING

ELBOWS

2. BACKFILL WITH #57 STONE AROUND TROUGH

3. SET TROUGH

4. SEAL BOTTOM HOLE

5. POUR CONCRETE APRON

6. COMPLETE INSTALLATION

7. GRADE AROUND ALL FACILITIES AS NECESSARY TO MAINTAIN

POSITIVE DRAINAGE AND SPREAD SPOIL AS DIRECTED BY

LANDOWNERS

8. ALL DISTURBED AREAS TO BE STABILIZED WITHIN 14 DAYS OF

COMPLETION, USING THE SEEDING RECOMMENDATIONS

PROVIDED

TOP EL.

COLLECTION BOX (OPTIONAL)

EARTH CORE

INLET EL.

OUTLET EL.

SUPPLY LINE

TOP OF TROUGH

OVERFLOW EL.

18' DIAMETER CONCRETE PAD

ELEV

OUTLET

EL.

OUTLET PIPE W/

RODENT GUARD

Na

tu

ra

l R

eso

urce

s C

on

se

rva

tio

n S

ervice

Un

ite

d S

ta

te

s D

ep

artm

en

t o

f A

gricu

ltu

re

N.T.S.

EL.

Page 3: SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

PRESSURE FEED SYSTEMS

NOTE:

FOLLOW SPECIFIC INSTALLATION INSTRUCTIONS FROM THE

MANUFACTURER OR THE PARTICULAR BRAND TYPE OF TROUGH

Na

tu

ra

l R

eso

urce

s C

on

se

rva

tio

n S

ervice

Un

ite

d S

ta

te

s D

ep

artm

en

t o

f A

gricu

ltu

re

File N

o.

Date

Draw

ing N

o.

Sheet of

Draw

n

Designed

Checked

Approved

WA

TE

RIN

G F

AC

ILIT

Y(P

RE

SS

UR

E)

614-

AP

FT

NOTES:

1. Exact location of supply line to be determined during construction by the

landowner and soil conservation district

2. All lines to have a min 24" cover

3. All concrete apron must have 6 gauge 6"x6" Welded Wire Mesh (WWM)

4. All concrete to be a minimum 3000 psi with 5% air entrainment and a

slump of 3-5 inches.

5. Install backflow preventer if water is supplied from potable water source

INSTALLATION NOTES:

1. Grade pad for trough and install inlet pipe, including elbows

2. Backfill with #57 stone trough location and grade stone

3. Pour concrete

4. Set trough

5. Complete installation

6. Grade around all facilities as necessary to maintain positive

drainage and spread spoil as directed by landowners

3.0' Minimum Depth

1.0' Min.

± 3'

1.0'

5"

5"

6.0' Minimum Extent of Concrete Pad

On All Sides

± 1.5'

Na

tu

ra

l R

eso

urce

s C

on

se

rva

tio

n S

ervice

Un

ite

d S

ta

te

s D

ep

artm

en

t o

f A

gricu

ltu

re

File N

o.

Date

Draw

ing N

o.

Sheet of

Draw

n

Designed

Checked

Approved

WA

TE

RIN

G F

AC

ILIT

Y(P

RE

SS

UR

E)

614-

BP

FT

NOTES:

1. Exact location of supply line to be determined during construction by the

landowner and soil conservation district

2. All lines to have a min 24" cover

3. All concrete apron must have 6 gauge 6"x6" Welded Wire Mesh (WWM)

4. All concrete to be minimum 3000 psi, with 5% air entrainment and a

slump of 3-5 inches.

5. Install backflow preventer if water is supplied from a potable water source

INSTALLATION NOTES:

1. Grade pad for trough and install inlet pipe, including elbows

2. Backfill with #57 stone trough location and grade stone

3. Pour concrete

4. Set trough

5. Complete installation

6. Grade around all facilities as necessary to maintain positive

drainage and spread spoil as directed by landowners

34" or Min Pad

Size as Determined

By Manufacturer

5"

7"

Na

tu

ra

l R

eso

urce

s C

on

se

rva

tio

n S

ervice

Un

ite

d S

ta

te

s D

ep

artm

en

t o

f A

gricu

ltu

re

File N

o.

Date

Draw

ing N

o.

Sheet of

Draw

n

Designed

Checked

Approved

WA

TE

RIN

G F

AC

ILIT

Y(P

RE

SS

UR

E)

614-

CP

FT

NOTES:

1. Exact location of supply line to be determined during construction by the

landowner and soil conservation district

2. All lines to have a min 24" cover

3. All concrete apron must have 6 gauge 6"x6" Welded Wire Mesh (WWM)

4. All concrete to be minimum 3000 psi with 5% air entrainment and a slump

of 3-5 inches.

5. Install backflow preventer if water is supplied from potable water source

INSTALLATION NOTES:

1. Grade pad for trough and install inlet pipe, including elbows

2. Backfill with #57 stone trough location and grade stone

3. Pour concrete

4. Set trough

5. Complete installation

6. Grade around all facilities as necessary to maintain positive

drainage and spread spoil as directed by landowners

EXTEND 3" PAST WIDTH OF TROUGH

FASTEN TROUGH TO BASE

5"-3000 PSI CONCRETE

W/ #6 GAUGE 6"X6" WELDED WIRE MESH

(WWM)

6" OF #57 STONE

12" DIA INSULATING TUBE

4' MIN DEPTH BELOW TROUGH

INSTALL BRASS ELBOWS AT ALL BENDS

--DO NOT BEND PIPE--

GRD.

ELEV.

6" SCH 40 PIPE FOR

ACCESS TO SHUTOFF VALVE

(OPTIONAL PLACEMENT)

PVC PIPE

Na

tu

ra

l R

eso

urce

s C

on

se

rva

tio

n S

ervice

Un

ite

d S

ta

te

s D

ep

artm

en

t o

f A

gricu

ltu

re

File N

o.

Date

Draw

ing N

o.

Sheet of

Draw

n

Designed

Checked

Approved

WA

TE

RIN

G F

AC

ILIT

Y(P

RE

SS

UR

E)D

PFT

614-

DP

FT

CONCRETE BASE

PROPOSED TROUGH

(DESIGNED BY OTHERS)

NOTES:

1. EXACT LOCATION OF SUPPLY LINE TO BE DETERMINED

DURING CONSTRUCTION BY THE LANDOWNER AND SOIL

CONSERVATION DISTRICT

2. ALL LINES TO HAVE A MIN 24" COVER

3. CONCRETE APRON MUST HAVE 6 GAUGE 6"X6" WELDED

WIRE MESH (WWM)

4. CONCRETE TO BE MINIMUM 3000 PSI WITH 5% AIR

ENTRAINMENT AND A SLUMP OF 3-5 INCHES.

5. INSTALL BACKFLOW PREVENTER IF WATER IS SUPPLIED

FROM POTABLE WATER SOURCE

INSTALLATION NOTES:

1. GRADE PAD FOR TROUGH AND INSTALL INLET PIPE,

INCLUDING ELBOWS

2. BACKFILL WITH #57 STONE TROUGH LOCATION AND GRADE

STONE

3. POUR CONCRETE

4. SET TROUGH

5. COMPLETE INSTALLATION

6. GRADE AROUND ALL FACILITIES AS NECESSARY TO

MAINTAIN POSITIVE DRAINAGE AND SPREAD SPOIL AS

DIRECTED BY LANDOWNERS

6'

3"

30

" M

IN

2% SLOPE

Natural Resources Conservation Service

United States Department of Agriculture

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

WATERING FACILITY(PRESSURE)

614-EPFT

PEDESTAL

CONCRETE PAD

6' - 0"

6' - 0"

TROUGH

TROUGH

SU

PP

LY

L

IN

E M

IN

. 1

"

5' OF 12"

SCH 40 PVC PIPE

HEAT TUBE OR EQUAL

32" MINIMUM

4" SCH 40 CONDUIT PIPE

(CONTINUES PAST CONCRETE PAD, APROX. 10' LONG)

5"

5"

5"

CONCRETE PEDESTAL

CRUSHER RUN

SEE CONCRETE PAD DETAIL

BACKFILL

CAULK WHERE CONDUIT ENTERS

HEAT TUBE

BACKFILL

3"

NOTE:

IF GROUNDWATER IS PRESENT, TILE MUST BE INSTALLED

TO DIVERT WATER AWAY FROM HEAT TUBE

SLOPE CONCRETE AWAY

FROM TROUGH

2% MIN (TYP.)

NOTES:

1. BACKFILL MATERIAL MUST BE FREE OF ANY ROCKY MATERIAL

2. MIN 32" DEPTH FOR SUPPLY LINE

3. SUPPLY LINE MAY BE 1" OR 1

1

4

" DIAMETER SOLID POLYETHYLENE PIPE

4. CONCRETE MINIMUM 3000 PSI WITH 5% AIR ENTRAINMENT AND SLUMP 3-5 INCHES

5. WORKING PRESSURE OF PIPE SHOULD NOT EXCEED 72% OF THE PRESSURE RATING OF THE PIPE

6. VELOCITY SHALL NOT EXCEED 5FT/SEC

7. INSTALL BACKFLOW PREVENTER IF WATER IS SUPPLIED FROM POTABLE WATER SOURCE

"90" PVC ELECTRICIAN'S SWEEP

6 GAUGE 6"X6"

WELDED WIRE MESH

(WWM)

6-8FT HIGH

12" CONCRETE

PIPE

FROST LINE

32"

1" M

IN

IM

UM

P

OL

YE

TH

YL

EN

E

SU

PP

LY

LIN

E

5" STONE DUST

3" CRUSHER RUN

PROVIDE DRAINAGE AWAY FROM

TROUGH

FILL GROOVE WITH SAND

CEMENT GROUTING

TROUGH

FILTER CLOTH

(MIN CLASS C)

SUPPLY LINE MINIMUM DEPTH = 32"

NOTE : MOUNT WATERER ONTO

CONCRETE WITH PROVIDED BOLTS

FROM MANUFACTURER

CAULK AROUND SUPPLY LINE

WHERE IT ENTERS INTO CONCRETE

PIPE

HEIGHT OF WATERER MAY BE

DETERMINED BY LANDOWNER

NOTE : SOIL AROUND CONCRETE

PIPE MUST BE TAMPED TO ENSURE

STABILITY

Natural Resources Conservation Service

United States Department of Agriculture

File No.

Date

Drawing No.

Sheet of

Drawn

Designed

Checked

Approved

NOTES:

1. BACKFILL MATERIAL MUST BE FREE OF ANY ROCKY MATERIAL

2. MIN 32" DEPTH FOR SUPPLY LINE

3. SUPPLY LINE MAY BE 1" OR 1

1

4

" DIAMETER SOLID POLYETHYLENE PIPE

4. WORKING PRESSURE OF PIPE SHOULD NOT EXCEED 72% OF THE PRESSURE RATING OF THE PIPE

5. VELOCITY SHALL NOT EXCEED 5FT/SEC

6. INSTALL BACKFLOW PREVENTER IF WATER IS SUPPLIED FROM POTABLE WATER SOURCE

WATERING FACILITY(PRESSURE)

614-FPFT

"90" PVC ELECTRICIAN'S SWEEP

Page 4: SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

TO OUTLET

TO OUTLET THAT HAS

SCREW CAP

INSIDE BEAD OF

BOTTOM SIDEWALL

CONCRETE OR GRAVEL PLACED TO

MEET HEAVY USE AREA PROTECTION

AREA (561)

6'

OUTSIDE TIRE

TREAD

FROM WATER

SOURCE

CUT TOP SIDEWALL

2'-3" DIA

PLAN VIEW

TOP VIEW

30" 1-4 CUTOUTS

PER TIRE

GRAVITY FED RUBBER TIRE TROUGH

8-10"

5" CONCRETE

APRON

TO OUTLET

TO OUTLET THAT HAS

SCREW CAP

FROM WATER

SOURCE

"TEE"

"90"

4" COUPLER

REMOVABLE 4" SCH 40 PIPE

2-4"

COMPACTED SOIL

2-3"

CAUTION:

HEAVY EQUIPMENT TIRES ARE NORMALLY FILLED WITH LIQUID DURING USE FOR WEIGHT AND BALLAST,

RESIDUES FROM THESE LIQUIDS COULD BE TOXIC TO LIVESTOCK. THE NATURAL RESOURCES

CONSERVATION SERVICE MAKES NO REPRESENTATION TO THE EXISTENCE OR NONEXISTENCE OF TOXIC

RESIDUES IN THE USED TIRES. IT IS THE RESPONSIBILITY OF THE LANDOWNER TO ENSURE THEMSELVES

THAT NO HAZARDS EXISTS.

CONCRETE OR GRAVEL PLACED

TO MEET HEAVY USE AREA

PROTECTION AREA (561)

GROUND

NOTE: USE SCH 40 PIPE WITHIN 10FT OF THE TROUGH AND

OUTLET. ALL OTHER PIPE MAY BE ASTM 405 HEAVY DUTY

CORRUGATED POLY TUBING

5"

3/4" STONE

PRESSURE FED RUBBER TIRE TROUGH

FLOW FLOW

1'

APPROX.

1" SCH 40 PVC ELBOW

1" SCH 40 PVC

2" SCH 40 PVC ELBOW

2" SCH 40 PVC

2" GALVANIZED STEEL PIPE

6"

6"

GEOTEXTILE

2-3"

VARIES

8-10"

VA

RIE

S

FLOAT VALVE

SCREEN TOP OF OVERFLOW PIPE

APPLY SILICONE SEALANT TO

CONCRETE/TIRE JOINT TO

ENSURE WATERTIGHT SEAL

4-8" CONCRETE PLUG

2" COLLAR

1" COLLAR

16 GAUGE CORRUGATED

RISER WITH STEEL LIP SAME

DIAMETER AS BOTTOM HOLE

STRIP AND REMOVE SOD

PRIOR TO PLACING

GRAVEL PAD

GEOTEXTILE

SIDE VIEW

Page 5: SHEET4 · 2015. 2. 13. · Title: SHEET4 Created Date: 1/28/2015 4:33:19 PM

WIRE FENCE BRACE DETAILS

382-E-FENCE.DWG

MARYLAND STANDARDS FOR AGRICULTURAL BMPS

DETAIL 382-E - FENCE

DATE ISSUED: June, 2003 SHEET OF

MARYLAND DEPARTMENT OF AGRICULTURE

MARYLAND SOIL CONSERVATION DISTRICTSNATURAL RESOURCES CONSERVATION SERVICE

U.S.DEPARTMENT OF AGRICULTURE

382-F-FENCE.DWG

MARYLAND STANDARDS FOR AGRICULTURAL BMPS

DETAIL 382-F - FENCE

DATE ISSUED: June, 2003 SHEET OF

MARYLAND DEPARTMENT OF AGRICULTURE

MARYLAND SOIL CONSERVATION DISTRICTSNATURAL RESOURCES CONSERVATION SERVICE

U.S.DEPARTMENT OF AGRICULTURE

"WESTERN UNION" FENCE WIRE SPLICE

ATTACHING WIRES TO POSTS

STAPLES

FENCE STAPLES AND WIRE ATTACHMENT

ATTACHING WOODEN BATTENS TO WIRES

SINGLE SPAN BRACE ASSEMBLY

(at corners, ends, or gates)

DOUBLE SPAN BRACE ASSEMBLY

(at corners, ends, or gates)

HIGH TENSILE SMOOTH WIRE FENCE BRACES

U.S.DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE MARYLAND SOIL CONSERVATION DISTRICTS

MARYLAND DEPARTMENT OF AGRICULTURE

SHEET OFDATE ISSUED: July, 2003

DETAIL 382-D3 - FENCE

MARYLAND STANDARDS FOR AGRICULTURAL BMPS

382-D3-FENCE.DWG

10

3.5

8

DETAIL

LINE PANEL

GATE DETAIL

HIGH TENSILE SMOOTH WIRE FENCE - ELECTRIC

U.S.DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICEMARYLAND SOIL CONSERVATION DISTRICTS

MARYLAND DEPARTMENT OF AGRICULTURE

SHEET OFDATE ISSUED: July, 2003

DETAIL 382-D2 - FENCE

MARYLAND STANDARDS FOR AGRICULTURAL BMPS

382-D2-FENCE.DWG

60

6

46

3.5

8

5 10, 18, 26, 36, 46

TOTAL AREA

LANDOWNER

TRACT

PRACTICE(S)

AREA 1 AREA 2 AREA 3

MATERIALS/RATE

AMOUNT

PLANNED

AMOUNT

PLANNED

AMOUNT

PLANNED

AMOUNT

APPLIED

AMOUNT

APPLIED

FERTILIZER 10-20-20

500LBS/AC

AMOUNT

APPLIED

LIME - 2TONS/AC

DOLOMITIC

SEED MIXTURE

(SEE BELOW)

MULCH

2 TONS/AC

ENTER KINDS AND AMOUNT OF SEED BELOW NOTE: INOCULATE ALL LEGUMES

NRCS SEED MIX #

DISK ALL DISTURBED AREAS TO A DEPTH OF 4-6"

CULTIPACK AFTER SEEDING

SEEDING DATES

AREA 1

NRCS SEED MIX # NRCS SEED MIX #

AREA 2 AREA 3

PLAN APPROVED BY: CHECKED FOR TECHNICAL COMPLANCE BY:

TITLE DATE TITLE DATE

UNITED STATES

DEPARTMENT OF

AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

MARYLAND

ISSUE DATE:

DRAWING NO.

7/2014

S-1.0

SEEDING

UNITED STATES

DEPARTMENT OF

AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

MARYLAND

ISSUE DATE:

DRAWING NO.

RODENT GUARD - OUTLET

DETAIL

RG-OUTLET

12/2014

NOTE: A HOLE MUST BE DRILLED IN THE TOP

OF THE PIPE IN ORDER TO ATTACH THE

RODENT GUARD WITHIN.

POSITION THE RODENT GUARD FAR ENOUGH IN

THE PIPE TO ALLOW IT TO SWIVEL UP AND LET

THE TRASH PASS WITHOUT EXPOSING THE

RODENT GUARD BEYOND THE PIPE.

SIDE VIEW

FRONT VIEW

ALL DRAWINGS NOT TO SCALE

2EA NUT AND BOLT MAY BE

USED AS AN ALTERNATIVE

AS SHOWN ABOVE

S

C

H

4

0

P

IP

E

O

R

E

Q

U

A

L


Recommended