+ All Categories
Home > Documents > Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan...

Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan...

Date post: 01-Apr-2015
Category:
Upload: daphne-widick
View: 213 times
Download: 0 times
Share this document with a friend
42
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23
Transcript
Page 1: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Shipbreaking

Module 4: Heavy Equipment & Material Movement

4.3 Personnel Hoist & PlatformsSusan Harwood Grant Number SH-17820-08-60-F-23

Page 2: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Disclaimer

2

This material was produced under grant number SH-17820-08-60-F-23 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or polices of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.

Page 3: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Objectives

3

Identify operation procedures for cranes and derricks

Describe personnel platform systems List testing and inspection procedures Explain the operations of personnel

platforms

Page 4: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

4

Page 5: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

5

Page 6: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

OSHA has guidelines on personnel hoist platforms.

6Figure 1 Personnel hoist in fishing vessel outriggers

Page 7: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Personnel hoists should be the last resort when all other avenues such as ladders, scaffolds, and other means are exhausted.

7Figure 2 Crane along vessel as it enters the slip

Page 8: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Employee safety should not be compromised for the operation.

8Figure 3 Personnel Lift on superstructure

Page 9: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Cranes pose a risk of tipping and therefore must be on a firm level ground.

9Figure 4 Crane on level ground hoisting

Page 10: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

A 1% uniform grade must be maintained.

10Figure 5 Crane on level firm surface

Page 11: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Minimum safety factor of seven for the load line of wire rope and ten for rotation-resistant rope.

11Figure 6 Hoist bridle with screw pin shackles attached

Page 12: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Brakes or locking devices on the crane must be engaged when personnel are working aloft.

12Figure 7 Crane at rest between operations

Page 13: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

13

Page 14: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

The platform must be rated for 5 times the safe working load of the intended lift.

14Figure 8 Load testing crane and rigging

Page 15: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Install a suspension system on the top of the platform to prevent tipping.

15Figure 9 Personnel platform over side of ship conducting hot work operations

Page 16: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Must have a rail to keep personnel from falling out including a toe board.

16Figure 10 Personnel platform with enclosed railing for worker

Page 17: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Load placard is prominently posted on the platform with the load weight and platform weight.

17Figure 11 Worker inside platform conducting hot work on hull

Page 18: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Do not exceed the platform’s rated load capacity.

18Figure 12 Overview of slip with crane hoisting a personnel platform

Page 19: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Bridles and rigging dedicated to personnel hoisting can not be used for any other purpose.

19Figure 13 Personnel hoist on main deck of vessel

Page 20: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Hooks and other attachments must be closed type to prevent opening.

20Figure 14 Closed hook

Page 21: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Mousing the hook is strictly prohibited.

21Figure 15 Mousing hook with line

Page 22: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

22

Page 23: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

A trial lift must be made before workers can be placed in the platform.

23Figure 16 Personnel hoist initial hoist tested

Page 24: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

A lift starts at ground level and is then positioned to the vessel.

24Figure 17 Supervisor monitoring movement of personnel platform hoisting

Page 25: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

All systems will be evaluated and inspected for safety concerns.

25Figure 18 Personnel platform over side of vessel static

Page 26: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

When the position shifts along the vessel a trial test must be completed at the new location.

26Figure 19 Crane along slip stationary

Page 27: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Immediately after the trial lift conduct a complete inspection of the rigging, platform, and crane.

27Figure 20 Supervisors concluding inspection of equipment

Page 28: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

28

Page 29: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Before personnel can be transported in the platform, the lift has to have all kinks and twist removed from the rigging.

29Figure 21 Rigging being laid out

Page 30: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

The platform will be hoisted a few inches above the ground to allow the rigging to settle and check for alignment.

30Figure 22 Hoist in suspension above ground

Page 31: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

A competent person must conduct an inspection and test prior to usage.

31Figure 23 Close up of wire rope and rust within the lays of the strands

Page 32: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Prior to the platform coming to the site a 5 minute proof testing, at 125% of the load capacity, must be completed.

32Figure 24 Certified weights for personnel platform hoist

Page 33: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Tag lines are advisable unless they create a unsafe condition or be fouled in the rigging of the vessel.

33Figure 25 Rigging clear of vessel gear on main deck

Page 34: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Personnel shall keep all body parts and equipment inside the platform at all times.

34Figure 26 Workers preparing to board

Page 35: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Personal fall arrest systems must be attached to the lower back and to the platform.

35Figure 27 Personnel fall protection in place and secured

Page 36: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

The crane should not be in motion with personnel in the platform.

36Figure 28 Crane is on standby along slip

Page 37: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

If the crane must move with personnel, it must be restricted in the distance moved and a trial run should be considered.

37Figur29 View of the crane down the side

Page 38: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Crane operator must be at the controls at all times when the machinery is operating.

38Figure 30 Supervisor monitoring operations over side of vessel

Page 39: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

39

Page 40: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

40

Page 41: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

References

41

OSHA eTool www.osha.gov

Page 42: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

42

Worker safety is a priority


Recommended