SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR SALIET FEATURES Sr. No. Item Unit Particulars. 1 2 3 4 1 2 3 4 Scope : A lift irrigation schema with lift from Shirapur KT weir two stages providing irrigation benefits to 10000 ha of area in North Solapur and Mohol talukas of Solapur district by Canals. sources : Ujjani storage ; water available at Shirapur KT weir on River Sina by Bhima Sina link tunnel project. Location 1) State : Mharashtra 2) Region : Western Maharashtra 3) District : Solapur 4) Taluka : Mohol 5) Village : Shirapur 6) Toposheet No : 47 N/3, 4, 7, 8, 11, 12, 15, 16 47 O/1, 2, 5, 6, 9, 10, 13, 14 7) Latitude : 17-48’ – 00” (N) Longitude : 75- 43’– 00” (E) Annual water : TMC 1.730 utilization : Mcum 48.977
Transcript
Page 1: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

SALIET FEATURES

Sr. No.

Item Unit Particulars.

1 2 3 4

1

2

3

4

Scope : A lift irrigation schema with lift from Shirapur KT weir two stages providing irrigation benefits to 10000 ha of area in

North Solapur and Mohol talukas of Solapur district by Canals. sources : Ujjani storage ; water available at Shirapur KT weir on River Sina by Bhima Sina link tunnel project. Location 1) State : Mharashtra 2) Region : Western Maharashtra 3) District : Solapur 4) Taluka : Mohol 5) Village : Shirapur 6) Toposheet No : 47 N/3, 4, 7, 8, 11, 12, 15, 16 47 O/1, 2, 5, 6, 9, 10, 13, 14 7) Latitude : 17-48’ – 00” (N) Longitude : 75- 43’– 00” (E) Annual water : TMC 1.730 utilization : Mcum 48.977

Page 2: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

5

6)

Details of lift Stage I Stage II

a) ICA : ha b) Lift level From : m : feet

to : m

: feet c) Designed Q cumecs :cusecs d) Rising main i) Diameter : mm ii) Thickness : mm e) Length : km f) Rows : No g) Static head : m : feet h) Gross head : m :feet i)Pumping capacity

(Including 1 stand by):H.P. j) size of Jackwell : m X m

10000 436.00 1430.00 484.50 1589.00 5.81 205.37 1219 8 4.03 2 48.50 159.08 66.89 219.40 9 X 900 40 X 30

9350 477.10 1565.00 503.00 1650.00 5.44 191.99 1219 8 2.55 2 25.90 84.95 36.00 118.08 5 X 900 90 X 75

Page 3: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

7)

8)

Canal

i) Starting CBL : m ii) ICA : ha iii) Designed discharge :cumecs

:cusecs

iv) Canal Bed width : m v) Bed slope : vi) free board : m vii) Side slope : viii) F.S.D. : m ix) Description : x) Length : km. Command area

a) N. Solapur b) Mohol Total Proposed crop pattern

Main canal RBC LBC

481.50 650 5.81 205.37 3.50 1:4000 0.60 0.5:1 1.75 Lined 0 to 9.63

501.50 7150 4.16 146.84 3.10 1:4000 0.60 0.5:1 1.55 Lined 0 to 15.5

501.50 2200 1.28 45.18 2.00 1:2500 0.45 0.5:1 1.00 Unlined 0 to 4.7

GCA (ha)

CCA (ha)

ICA (ha)

Population Benefited

Villages Benefited

193500

15480 9675 27484 18

650 520 325 410 1 20000 16000 10000 27874 19 sr. no. Name of crops %

I) Two seasonal 1. Chillies 3

II) Kharif seasonal

Page 4: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

10)

Existing crop pattern

2. 3. 4. 5. 6. 7.

Hy. Jowar Vegetable Ground nut Maize Sunflower Tur

10 10 25 2 10 10

III) Kharif Sesonal(U.I) 8. 9.

Jowar Pulses

20 10

IV) Rabi Seasonal

10. 11. 12. 13.

Jowar Gram Sunflower Vegetable

15 5 2 5

Total 27

G. total 127 sr. no. Name of crops %

Kharif seasonal 1. 2. 3. 4. 5. 6. 7. 8. 9.

Jowar Maize Fodder Mug Tur Vegetable Sunflower Ground Nut Paddy

2.2 1.2 2.2 0.3 1.8 0.6 3.2 2.6 0.1

Total 14.2

Rabi Seasonal 10. 11. 12 13. 14. 15.

Jowar Bajara Wheat Gram Vegetable Sunflower

60 0.7 1.2 5.1 0.6 3.2

Total G. Total

70.8 85.0

Page 5: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

11)

12) 13)

Total cost of the project (D.S.R. 95-96) : A) Cost of the scheme : B) Cost of link tunnel debited to Shirapur L1 Scheme : Cost per ha/acre of ICA: Benefit cost Ration :

Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs./ha Rs./acre 1.03

9056.63 (24779.95 Lakhs Revised Cost as per 2010-11 Project Report) 5785.12 3271.51 90566 36519

Page 6: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER I INTRODUCTION

1.0 General description of project Bhima River is one of the main left bank tributaries of the main Krishna

River. It originates at Bhima Shanker in Sahyadri ranges and flows from West to East till it joins River Krishna in Karnataka state.Total run of River Bhima crosses Pune and Solapur District. In Pune District near village Chas, taluka Rajgurunagar (Khed), Chaskaman dam is constructed across River Bhima and Bhima Project is constructed across River Bhima near village Ujjani, taluka Karmala. Some of major and medium projects completed and under construction are on the tributaries of Bhima River. Sina River is the main left bank tributary of the Bhima River. Sina River originates at Dongargaon Tal. Ahmednagar, Dist. Ahmednagar and flows from west to East through Ahmenagar and Solapur Districts till it join River Bhima at Takli, Tal. Akkalkot dist. Solapur near state boundary of Maharashtra and Karnataka States. Sina River in its upper reaches is tapped by various M.I. schemes and medium projects like Sina Nimgaon, Wangi etc. across River Sina, near village Awati, sina Kolegaon project is under construction. The area in upper reaches of this project is under construction. The area in upper reaches of this project gets benefit by fringe lifts only. Hence downstream area of this project is still un-irrigated.

1.1 Necessity of the project

Due to Sina Kolegaon project the flow of water in River Sina will effectively be restricted and run of River from this project site to any major confluence point will remain dry. From toposheet it is observed that no any major tributary is meeting to River Sina up to village Bhoire. At village Bhoire River Bhogawati meets River Sina & hence upstream run of River Sina from this confluence will remain practically dry in future, and no water resources will be available for the area on both banks of the River. As such there is consistent demand from this area to let down water from other sources, such as Ujjani storage, to Sina River for utilization on both the banks. The dry run of Sina River is curtailed by Mohol branch canal of Ujjani project at village Lamboti. It is also noticed that the area between Mohol branch and Wangira nalla, which meets river Sina at village Shirapur is also drought prone area. This area dose not has any irrigation facilities. Hence there is a long standing demand from this famine affected area for providing weir on river Sina through let out water from Bhima Sina link tunnel project, which will carry water from Bhima storage to Sina River. The identified command area

Page 7: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

lies in North Solapur taluka of Solapur District i.e. geographically on East side of river. Rainfall in the area is scanty and is in the range of 500 mm to 600 mm (20” to 24”). The maximum rainfall is available in the months of Aug., Sept. etc. due to which some of rabbi crops are only possible. Deep and good fertile soil is available; crops with higher yield can be grown. The area proposed to be benefited by this project lies in N. Solapur & Mohol Taluka of Solapur District. This taluka is chronic scarcity area and the only means to improve the standard of living of the people in this area is to provide them irrigation facilities.at present there is irregular flow in Sina River due to scanty rainfall & Sina Kolegaon project. River Sina is tapped in its upper reaches by various projects. Moreover Sina Kolegaon, a major project near village Awati is under construction. It is proposed to utilize about 4.00 TMC of water by this project, to irrigate area by fringe lifts only and no water will be left down in the river. This will affect the down stream flow of river in future.

It is therefore necessary to provide water for irrigation on either bank of the river by one of the alternative source.

1.3 History of the project

There is a long standing demand for providing irrigation facilities to famine affected area of N. Solapur & Mohol talukas of Solapur District.KWDT has allotted 599 TMC of water from Krishna river to Maharashtra state to be utilized by 2000 A.D. to have full utilization of water allotted to Maharashtra by 2000 AD it was reviewed that how much water is going to be utilized from the completed & under construction projects. After reviewing it was seen that there is scope for expansion of water uses to achieve full utilization of water allotted to Maharashtra Accordingly most of these expansion schemes are being planned to serve the drought affected area considering available sources of water. Solapur District is chronically drought affected area. To serve the irrigation benefits to the scarcity areas a major Bhima Project has been constructed. KWDT award has restricted use on main stream of Bhima to 95 TMC during any water year. Accordingly after accounting for planned utilizations on main stream of Bhima, it was seen that about 6.60 TMC of water can still be utilized from Bhima River. Moreover it was noticed that about 30 5 of Kharif water is not being utilized though potential has been created under the project. Keeping in view these factors, about 13.6 TMC of water of Bhima project is proposed to be utilized through various L1 schemes. For details of availability of water and L1 scheme p1 vide Appendix No. v/2 & 3. Shirapur L1 scheme is one of those proposed scheme with water utilization of 1.73 TMC. Chief Engineer (Specified Projects) submitted a note showing broad details of proposed scheme to the Govt. on the basis of note Govt. directed to prepare detail project report of the proposed scheme vide latter No. 1095/(180/95)/ WRI dated 11/08/95. As per this note ICA of the said scheme was 6000 ha having water utilization as 1.4 TMC. Mean while Govt. directed to modify the scope of the scheme vide Marathi letter No. S95/3095/35-Mu.Ma.Sa.

Page 8: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

(91/95) Ja.Sa.A. dated 23/02/96 up to 10000 ha of ICA. Hence command area of this scheme is finalized to 10000 ha having water utilization of 1.73 TMC. Layout of Shirapur Lift Irrigation Scheme is first decided on the basis of toposheet study to verify the feasibility of the scheme.

1.40Present proposal To join Bhima storage & Sina river it is proposed to construct a Bhima-Sina link

tunnel canal of 26.5 km length from Ujjani lake to provide irrigation benefits in Sina valley. In Sina valley there are three schemes to be served through Bhima-Sina link tunnel & same are as under

A) Bhima-Sina Lift Irrigation Scheme- by series of KT weirs for both banks of river Sina.

B) ShirapurLift Irrigation Scheme- to serve the area in North Solapur & Mohol taluka.

This tunnel will provide required quantum of water from Ujjani Lake to Sina River starting from village Kandar and ending at K.T. weir at Kave a Sina river. This will provide assured and adequate water supply to the above schemes. To provide irrigation facility to surroundings of Vadala, Vangi, Mothewadi, Chicholi, Karamba, Mardi & Nanaj etc. from North Solapur & Mohol taluka of Solapur KT weir on river Sina, which will be fed by letting out water from Bhima Sina link. It is proposed to give irrigation benefits to 10000 ha of area in North Solapur & Mohol taluka by lifting water from Shirapur KT weir. The Shirapur KT weir is fed by Bhima Sina link. It is proposed to lift water from river Sina @ Shirapur KT weir near village Shirapur in two stages. This include first lift of water with 4.03 km long rising main from RL 1430’ (436m) to 1589’ (484.5m) having static head of 159.08’ (48.5m). From delivery chamber of 9.63 km in length is proposed. At the end of main canal i.e. @ 9.63 km stage II lift is proposed near village Mothewadu. Stage II includes lifting water by 2.55 km long rising main from RL 1565’ (477.1m) to 1650’ (503 m) having a static head of 84.95’ (25.9 m). After second lift LBC of 4.70 km and RBC of 15.5 km is proposed.

1.5. Location of the project

The lift scheme is proposed on the river Sina at Shirapur KT weir, taluka Mohol, district Solapur. This weir is situated near Miraj – Solapur road. Village Shirapur is situated near taluka boundary of North Solapur and Mohol taluka.

Stage II lift is approachable from Shirapur– Solapur road. Geodetic location of the command area is as under.

Toposheet : 47 O-9,10,13,14 & 56 C- 1,2 Latitude : 17 – 48’ – 00 “ N Longitude : 75 – 43’ – 00” E

Page 9: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

1.6 Access and roadway The proposed lifts are near village Shirapur taluka Mohol (for stage I) & Mothewadi

taluka North Solapur, dist. Solapur. The village Shirapur is approachable by Solapur – Miraj road. It is near about 40 km away from Slapur city. Command area of lift is crossed by Shirapur– Solapur road and Miraj – Solapur road.

1.7 General climate conditions The project is located in Solapur District of Maharashtra State. The temperature varies from minimum 10OC in winter to maximum 45OC in summer months. The rainfall in the command area is very low and having erratic and unreliable pattern. It varies from 500 mm to 600 m. 1.80 Command area It is proposed to provide irrigation benefits to 10,000 ha area by this lift scheme. GCA under this lift is 20,000 ha. Command area under this lift is situated at higher elevation of Sina River and is lies in villages Vadala to Kedgaon & Mardi. Very few nallas flowing towards the river Sina originate from this area. 1.8 Topography Command area of the scheme is almost flat and is having gentle slope towards the nalla/river. 1.9 Geology The main rock is basalt and top portion is weathered rock and end product of this weathered rock is soil which is good for cultivation and soil cover for vegetation is quite adequate in the command area There are no significant mineral deposits in the command area. The area is covered by medium brown/black and dry soil. 1.10 Population As per census book 1981 about 27874 people from 19 villages are likely to get benefited by this scheme. 1.11 Natural resources In this region agriculture is dependant upon rainfall which is insufficient and uncertain. Providing irrigation facility to grow two or more crops in this area, local nallas are the only source for water supply. However as these nallas have small catchment areas their yield is limited and they dry out very soon. Also the area proposed to be served is situated at higher elevation of Sina river

Page 10: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

1.12 Infrastructure Being DP area there is no infrastructure development in the command area. However due to assured water supply & development of irrigation, infra structure development; including agro industries may be possible. The simulative effect of the above would result in improvement of living standard of the general masses of the area. 1.13 Socio economic aspect

There are no important industries in this command area except Taluka places. The main source of living hood in this area is agriculture. The command area lies in North Solapur taluka, which is famine affected area.

1.14 Stages of construction

The present scheme is proposed to be constructed in one stage only. It is planned to complete the scheme in a period of three years including pre construction years.

1.15 Stage of development It is planned to complete the construction of the project in a period of 3 years and development of irrigation potential will start from second year. 1.16 Interstate aspect

The entire command area falls in the Solapur district of Maharashtra State only. Hence,there is no interstate aspect so far as this scheme is concerned.

1.17 Cost and benefit of the scheme

This project mainly consists of construction of lift and canals. The total estimated cost of the scheme is Rs. 5785.12 lakhs. Cost of Bhima Sina tunnel debited to Shirapur LI scheme is Rs. 3271.51 lakhs. The details of the cost are given below-

Sr. No. Descripition Rs. In lakhs 1. I- Head works 2635.86 2. II- Main canal & branches 1548.68 3. III- Distributory system 449.50 Total : 4634.04 Centage charges : 1151.08 Total cost of the scheme : 5785.12 The cost of the project is worked out as per D.S.R. 1995-96.

Page 11: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

For annual cost and B.C. Ratio of the prices of commodities as per the year 1993-94 (PI. Vide Appendix No. XVII/ 2 & 3) B.C. ration of the project works out to 1.03 which is more than one. As such the project is economically feasible and is recommended for Administrative Approval.

1.18 Public co-operation and participation The project provides benefits to drought prone area of Solapur District. The proposal will also create more employment & appointments to the people during the period of construction as well as, in subsequent years due to creation from local people is expected. 1.19 Public views on benefits

The beneficiaries in the command area are eagerly waiting for the commencement of the scheme. When irrigation facilities will start they will become irrigation orientated. Economic conditions and living standard of beneficiaries will also be improved due to increased yields and agricultural products & routing in socio economic development.

People from taluka Madha and Shirapur of Solapur district will be benefited after commencement of the scheme. The details of the scheme are as under.

Sr. No Taluka Villages Benefited (No.)

Population Benefited

(Souls) 1 N. Solapur 18 27464

2 Mohol 1 410

Total 19 27874

Page 12: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

Chapter II PHYSICAL FEATURE

2.1.0 Geographical description

Command area of the scheme lies in North Solapur & Mohol taluka of Solapur district. It is situated on higher elevation in between district boundary of Solapur-Osmanabad and Mohol branch canal of Ujjani system. Some of the nalls flowing towards the river originates here. Nalls are flat and not suitable to tap any where by even M.I. tanks. The command area is having gentle slope towards the river. Scope of the command area: the proposed command area lies in north Solapur & Mohol taluka of Solapur district in Maharashtra state. Command area lies in DPA area, so to provide irrigation facilities with assured water supply is very essential.

2.2. Physical features Sources of lifting water is KT weir at village Shirapur. Following are the main Roads and Railway passing through the command area. 1. Shirapur– Solapur road 2. Miraj - Solapur road. 2.3. Geology Soil is brown and fairly deep. 2.4.0 Cropping pattern Existing cropping pattern is considered the same as approved for Ujjani irrigation Project. It is mentioned as below:

Sr. No Name of the crops % Remarks

A- Perennial 1. Sugarcane 1.40 (on well) 2. Other perennial 0.30 (on well)

Total 1.70 B- Two seasonal

3. Chillies 0.20 (on well) 4. Cotton 0.10 (on well) 5. Turmeric 2.00 (on well)

Page 13: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Total 2.30 C- Kharif Seasonal

6. Jawar 2.20 7. Maize 1.20 8. Fodder 2.20 9. Mug 0.30 10. Tur 1.80 11. Vegetable 0.60 12. Sunflower 3.20 13. Groundnut 2.60 14. Paddy 0.10 15. Follow 15.00

Total 29.20 D- Rabbi seasonal

16. Jawar 60.00 17. Bajara 0.70 18. wheat 1.20 19. Gram 5.10 20. Vegetable 0.60 21. Sunflower 3.20 Total 70.80

Grand total 109.00

Page 14: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

Chapter III INTERESTE/ INTERNATIONAL ASPECTS

3.1.0 Interstate aspect The entire command area of the project lies in North Solapur & Mohol talukas of

Solapur district in Maharashtra State. as mentioned earlier in Para No. 1.3.03, the provision of 1.75 TMC of water in made

in the planning of Ujjani Project for the proposed scheme. River Bhima is a major tributary of river Krishna. Krishna river flows within the

states of Maharashtra State. On review of present water use and planned use of completed, ongoing and future irrigation scheme, it is seen that additional conveyance system are required to be planned to achieve the target of actual use of 1.73 TMC can safely be accommodated within the permissible limits of KWDT decision and this proposal can be taken for construction. As such there are no interstate aspects.

3.2.0 International Aspects Bhima 7 Krishna rivers flows within the states of India only as such International

aspects do not arise.

Page 15: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

Chapter IV SURVEY AND INVESTIGATION

4.1.0 Survey 4.1.01 Benchmark carrying The reconnaissance report of the scheme based of toposheet study is submitted to

CE, ID Pune in October 1995. However in the view of full utilization of water allotted to Maharashtra state by KWDT award before 2000 A.D., the actual survey work is started in the month of November 1995. to decide location, elevation, magnitude & altitude of each component structures, survey work is carried with reference to permanent bench mark. Permanent BM is available on guard stone of Shirapur KT weir near village Shirapur. This BM is carried out with the help of double level ling & temporary BMs are established on permanent structures in the command area 7 nearby rising main. For details of bench marks pl. vide appendix No. IV/1.

4..2.0 Survey details As per the lay out of this L1 scheme, the locations of various components such

as pump house, rising main, delivery chamber & canal alignment were decided with the help of toposheets and site inspection at the time of preliminary report. In order to finalize the exact location, size and length and accordingly to prepare estimates and drawings for various components of lift, the detail survey was taken in hand as discussed below.

1) K.T.Weir :- KT weir at village Shirapur, which is the Ist lifting point of this L1 scheme, is existing. Hence survey for the same is not carried out.

2) Sump well and pump house (stage I):- Considering topographical and tentative H.F.L. of river Sina, the pump house is located such that, it is above H.F.L. of river and will not get affected due to floods in monsoon and also the foundation grade rock is available at the reasonable depth. Block contour survey with arid of 30 m xx 30 m interval has been carried out for pump house state 1 near village Shirapur.

3) Pump house (stage II) :- 4) Rising Main:- Location of pump house is already fixed as discussed

above. The detail rising main surveys for stage I & II are carried out. The length of rising main for Ist stage is 4030 m & for IInd stage is 2550

Page 16: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

m. the level for L/S are taken at 30m interval. Length of rising main of both the stages are decided such that vide plate No. 3 & 7.

5) Delivery Chamber:- It is decided to store water in delivery chamber for 5 minute detention period at peak requirement period. Accordingly tentative size of delivery chamber stage I & stage II is worked out & survey for the same with a grids of 30 x 30 m is carried out.

6) Canals:- Survey for canals i.e. main LB & RB canals from delivery chamber of each stage is carried out for a length of 9.63 km, 4.70 km & 3.60 km (total length of RBC is 15.50 km) respectively. For condensed L- section of main canal, LB & RB canal with its hydraulic details please vide plate No. 3, 7, 11 & 12.

7) Command area:- No detail survey of the command area under main canal, LBC & RBC is carried out. At present it is fixed on the basis of toposheets. However it will be carried out in detail at the time of construction after finalization of canal alignment from construction point of view. The total command area under this scheme for all the two stages lies in part of N. Solapur & Mohol taluka and is having a good network of all types of roads such as village roads, M.D.R., State highway and proper inter connection with each other. Near by Railway facility adds for the betterment of the project. Details of canals and irrigable command area are as under.

Stage Particular Canal length (km) ICA (ha) 1. Stage I i) Main canal

ii) LBC 9.63 4.70

650 2200

2.Stage II i) R. B.C. 15.50 7150 Grand Total 10000

Page 17: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER V HYDROLOGY

5.1.0 Water availability

Bhima river is one of the major tributary of river Krishna and it joins Krishna in Andhra Pradesh state,. River Bhima is tapped by Chas – Kaman and Ujjani major projects as well as some M. I. project i.e. K.T> weirs U/S and D/S of Ujjani project. Bhima (Ujjani) is one of the major projects in Bhima valley, constructed across river Bhima near village Ujjani, in Madha taluka of Solapur district. KWDT has permitted to utilize 95 TMC of water on main stream of Bhima, it is seen that 6.6 TMC of water is still left to be used within this permitted limit of 95 TMC by KWDT. It is proposed to use this much quantum of water through the additional conveyance system planning of Bhima project. The present water use planning the Bhima project is as under:

PRESENT PLANING OF BHIMA PROJECT

A) Irrigation (TMC) (TMC)

I. Fringe lifts (ICA 34883 ha) II. Flow Irrigation III. Sina Madha

9.60 39.15 03.75

9.60 39.15 03.75

Total 52.50 52.50 Kharif savings(-) 07.00 07.00

Total 45.50 45.50 B) Industrial use 2.15 00.50 C) Drinking water supply 3.18 00.64 D) Losses 20.52 20.52

71.35 66.71 Say 71.40 66.71

E) Water availability for proposed LIS 1. Kharif saving = 7.00 2. Additional availability water = 6.00

Page 18: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

(as per App. No. V/3) Total 13.60 13.60 TOTAL 85.00 80.30

Hence present planning of Bhima project is 85 TMC Add for 1. Major Chaskaman Project 2. Minor projects

10.62 04.93

10.35 04.34

(On Bhima River ) TOTAL 100.55 95.00

Note : * Actual Evaporation losses at Ujjani lake is found to be less than estimated 20.52 TMC. Additional water use to the extent of these savings will be separately reviewed.

This much water can safely be used within permissible limits of KWDT on Bhima main stream. District Solapur being a D. P. A. P. area it is proposed to give irrigation benefit to Mohol, Madha, South & North Solapur, Karmala and Akkalkot taluka by various lift irrigation schemes through the planning of Ujjani project Shirapur L.I.S. is one of these scheme. About 2.59 TMC of water is proposed to be made available for this scheme.

Page 19: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER VI

DESIGN FEATURES AND CRTERIA FOR DIFFERENT RIVER VALLEY STRUCTURES

6.0.0 Design of Head works and General layout Design of each component of lift depends upon ICA be served and peak crop water requirement to serve it. Considering present irrigation practice and water availability proposed crop pattern for Bhima Sina project is approved by Agriculture Department, Pune Dated 1 March 1996.Bhima Sina project and Shirapur LI scheme both lies in Solapur district. Climatic and geodetic conditions of both schemes are nearly same. This crop pattern is suitable for Shirapur LIS also. As such the same cropping pattern is proposed for planning of this scheme. Crop water requirement for to is worked out by modified Penman method. Overall efficiently for providing water to the root zone of crops is considered as 49 % with conveyance efficiency at 75% and 65% for field application efficiency. Accordingly details are as under -

NIR for 1000 ha GIR for 1000 ha

(@ 49 % Eff.) 1 ) Peak crop water requirement (In august II fortnight)

31.33 63.94 ham

2) Peak discharge with 14 days rotation (Fir 1000 ha)

18.67 cusecs

3) Design discharge with 10% capacity factor

20.54 cusecs

6.2.0 Head Works

Head works consists of inlet channel, sump well, pump house, rising main delivery chamber. Existing KT weir is under construction across the Sina river @ village Shirapur to create water storage for pumping purpose/

6.2.01 Location of sump well & Pump House

Page 20: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Shirapur LI Scheme is a part of existing Ujjani project. It comprises of 2 stages. The first stage is lifting point is fixed at Shorapur KT weir which is existing in Mohol Taluka of Solapur District. Thereon stage II lift point is at change 9.63 km main canal which is starting from delivery chamber of stage I.

6.2.02 Inlet channel An inlet channel at Ist stage is required to be constructed for the length of 120 m to reach pump house with bed slope of 1:300. It is designed to pass 5.81 cumecs discharge to meet peak crop water requirement for 10000 ha. Sump Well, Pump House and rising main Pump house: Design of pumps depends upon ICA to be surveyed under each stage, its peak crop water requirement & static head uoto which water is to be lifted. Details of each stage of lift are tabulated below:

Unit Stage I Stage II a) ICA ha 10000 9350 a) Lift Level from m 436.00 477.10 feet 1430.00 1565.00 to m 484.50 503.00 feet 1589.00 1650.00 b) Design discharge

to be lifted Cumecs Cusecs

5.81 205.37

5.44 191.99

c) Static head m 48.50 25.90 feet 159.08 84.95 d) Gross Head m 66.89 36.00 feet 219.40 118.08 e) Pumping capacity

(Including one stand by) HP (reqd) HP (provided)

7200 9x 900

3600 5x 900

Pump house is proposed to be constructed to accommodate number of pump for ach stage. 8x3.5 m size of bay is considered for each bay of pump house. Rising Main: Design of rising main depends upon discharge required to be passes to meet peak crop water requirement of ICA under each stage. To have economic design, various diameter of rising main are considered for lifting the peak discharge. Comparative study for each diameter is done considering no. of rows & the cost economic of the same. Accordingly diameter & row for rising main are fixed for each stage. Details of rising main for each stage of lift are as tabulated below:

Page 21: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Unit Stage I Stage II a) Area ICA Ha 10000 9350 b) Design discharge to be

lifted Cumecs 5.81 5.44

Cusecs 205.37 191.99 c) water to be stored with 5

min detention period cum 1744 1632

d) size of chamber m 30 x 20 x 3 40 x 30 x 1.5

6.2.03 Controlling levels Statement showing important controlling levels at head of lift irrigation scheme are as given below:

Unit Stage I Stage II 1 Water proposed to be

lifted from m 436.0 477.10

feet 1430.00 1565.00 2 Water is lifted up to M 484.50 503.00 Feet 1589.00 1650.00 3 Starting CBL M 481.50 501.50 6.3.00 Canal and Command Canals are designed with 10% capacity factor over & above peak discharge capacity. Where the discharging capacity is more than 2.83 cumecs (100 cusec) it is designed as lined canal & others with non scouring & non silting velocity considering proper bed gradient. Details of canals are as tabulated below: Stage I Main

Canal Stage I L.B.C.

Stage II R. B.C.

i) Designed discharge

Cumecs 5.81 1.28 4.16

Cusecs 205.37 45.18 146.84 ii) Canal bed width M 3.5 2.0 3.1 iii) Bed slope 1:4000 1:2500 1:4000 iv) Free board M 0.60 0.45 0.60 v) Side slope 0.5:1 0.5:1 0.5:1 vi) F.S.D. M 1.75 1.00 1.55 vii) Description Lined Unlined Lined viii) Length Km 9.63 4.70 15.50

Page 22: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

ix) Starting CBL M 481.50 501.50 501.50 6.3.02 Canal Structures

Survey for all canal lengths except RB canal is completed. Type of CD work is decided considering CBL. Ground level in catchment area of nalla. There are no major canal structures. Each type of CD work is designed for sample estimate purpose. However each CD work will be designed separately at the time of execution after finalization of canal alignment.

6.4.0 Power Being lift irrigation scheme for stage I & II 7200 & 3600 HP with 5960 & 2980 KW energy respectively is required. It is anticipated that this much quantum of power will be available in future at the time of commencement of the scheme.

Page 23: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER VII RESERVOIR

7.1.0 Reservoir Shirapur lift irrigation scheme is only a lift scheme and is proposed by lifting water from existing KT weir at village Shirapur, taluka Mohal, and district Solapur. Total required water for this scheme is proposed to be made available through supplementation by Ujjani project. It is proposed to let out water in river Sina by Bhima-Sina link tunnel from Ujjsni storage. No separate reservoir is required for this project. Details of KT weir at Shirapur, taluka Mohol, district Solapur is existing. Details of the same are as under

Sr. No. Particulars 1. Catchment area 38.800 Sqmiles 2. River bed level 33.250 M 3. Sill level 33.750 M 4. F.S.L. 38.250 M 5. H.F.L. 49.250 M 6. Gross storage 98.600 Mcft 7. Utilization 197.200 Mcft 8. Irrigable area 1678 ha

Page 24: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER VIII IRRIGATION PLANNING

8.1.0 Crop Pattern Considering present irrigation practice and water availability proposed crop pattern for Bhima Sina project is approved by Agriculture department, Pune Bhima Sina project and Shirapur L.I.S. both lies in Solapur district/ Climatic and geodetic conditions of both the scheme are nearly same. This crop pattern is suitable for Shirapur L.I.S. also. As such the same cropping pattern is proposed for planning of this scheme. The Crop pattern for this scheme is as below-

Sr. No. Name of crops Percentage 1. A) Two seasonal Chilies 3

3 B) Kharif 2. Jawari 10 3. Ground nut 25 4. Maize 2 5. Vegetables 10 6. Sunflower 10 7. Tur 10 Total 67 C) Rabbi 8. Hy. Jawari 15 9. Gram 5 10. Sunflower/Safflower 2 11. Vegetables 5 12. Rabbi Jawar (U.I.) 45 Total 72 Grand Total 142

8.3.0 Crop water requirement

As per the proposed cropping pattern fortnightly crop water requirement is worked out by modified Penman method. Gross irrigation requirement is

Page 25: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

worked out considering conveyance efficiency at 75% & field application efficiency at 65%. For flow irrigation it is taken as 49% of net irrigation requirement. For the crops as per cropping pattern the water requirement is worked out by modified Penman method for different seasons initially for 1000 ha, considering transit efficiency of 49%for flow irrigation. Gross water requirement works out at 4.8877 Mcum/0.1726 TMC per 1000 ha. The gross water requirement for different seasons as below:

Season Water Requirement Kharif 1.7117 Mcum 3.4933 Mcum 52.400 Mcum 60.4600 Mcft 123.3800 Mcft 1850.770 Mcft Rabi 0.6833 Mcum 1.3944 Mcum 20.916 Mcum 24.1300 Mcft 49.2500 Mcft 738.750 Mcft H.W. --- --- --- Total 2.3950 Mcum

84.5900 Mcft 4.8877 Mcum 172.6300 Mcft

73.316 Mcum 2589.520 Mcft

Page 26: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME

TALUKA : MOHOL DISTRICT : SOLAPUR

CHAPTER IX COMMAND AREA DEVELOPMENT

9.1.0 Command area development The gross command area of the project is 20000 ha. Out of that cultural command area is 20000 ha & irrigable command area of the scheme is 16000 ha. Command area lies in between Mohol branch canal of Ujjani system and district boundary of Solapur & Osmanabad & higher elevation of river Sina.

9.1.01 Climate The total command area lies in hot weather region having inadequate and scattered type rainfall in a range of 20” to 24”. The area is generally dry except in rainy season. The weather report says that a maximum temp. is 45 0 C in summer and minimum 10 0 C in winter season.

9.1.02 Irrigation projects There are no major and medium irrigation schemes in the command area of the N. Solapur taluka. Some minor irrigation schemes are in existence, but the area already under irrigation is not considered for this scheme.

9.1.03 Economic Aspect There are no industries or factories in the command area of project. The main resource of earning of the local population is agriculture, however due to insufficient and unreliable rainfall the agriculture is not economical.

9.1.04 Agro industries and banks There are some agro industries in the command area. After introduction of irrigation there is a large scope for agro industries especially because of well linked national highway and railway to Bombay and Pune and Solapur district places. Services of Indian Bank and District Co-operative banks are available at some places in command area.

9.1.05 Present agriculture practice Agriculture in command area is totally dependant upon rainfall. Farmers are using good quality of seeds; fertilizers etc. for agriculture and are practicing dry agriculture practices. Irrigation is therefore demand and needs to be provided as eagerly as possible.

Page 27: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

9.1.06 Increase in employment At present there is no source of employment. However after introduction of irrigation, irrigation facilities, there will be change in socio economic condition of the region resulting in increase of the employment opportunities.

9.1.07 Soil survey in the command area Soil survey of the proposed command area is being carried out by Director, Irrigation Research & Development, Pune. It is being taken up in 1996 -97 programme. However during the survey it is seen that soil in the proposed command area is deep seated with sufficient vegetation cover, fertile & will produce food grains with higher yields, if assured water is made available for irrigation.

Page 28: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER X

FLOOD CONTROL AND DRAINGAE 10.1 Flood control and drainage

Being a lift irrigation scheme flood control and drainage arrangement is not necessary.

Page 29: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XI

POWER 11.1.0 Power outlet Being lift irrigation scheme provision of outlet as in the case of dam does not arise.

On the country it requires power for lifting of water. For stage I and II of lift 7200 HP and 3600 HP with energy of 5960 KW and 2980KW is required. It is anticipated that this much quantum of power will be available in future at the time of commencement of the scheme. However it needs to be confirmed well in advance before commencement of the scheme.

Page 30: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XII NAVIGATION

12.0Navigation Being lift irrigation scheme there is no question of navigation through river. More over due to very small seasonal canals navigation is not possible. It is also not required in this command area.

Page 31: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XIII CONSTRUCTION PROGRAMME, MAN POWER AND PLANT PLANNING

13.1 Construction programme

The total cost of the scheme works out to Rs. 5785.12 lakhs. The scheme consists mainly following works: 1. Intake channel 2. Jack well and pump house 3. Rising main 4. Delivery chamber 5. Canal works with structure 6. Branch canal and their distributaries The above works are proposed to be completed in a period of 3 years.

Preliminary works like detailed survey, required land acquisition, and detailed design for the structure and tender papers will be taken in hand in the first year of construction.

13.2 Construction material The principal material required for the construction and their availability area described below:

Rubble The rubble required for the construction of pump house, delivery chamber as well as various structures on canals and its distributaries is available for a quarry 25 km away from site near Solapur. Sand Sand can be made available from river Sina which is 15 km from working site. Cement and steel Nearest railway station is Mohol which is 20 km away from the site of works for cement and steel 20 km lead is considered for carting. Machinery No heavy earth moving machinery is required for construction. There is no heavy earth work involved. Trucks and tippers including suitable cranes are required and provisions for the same are made in the estimates. Construction organization There is no separate provision of construction organization for Shirapur LIS.

Page 32: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Out of six Sub divisions proposed for the completion of Bhima Sina LIS one is proposed for Shirapur LIS. This sub division will work for Shirapur LIS. Sub division No.6 of Bhima Sina LIS @ Shirapur : This sub division is proposed for construction & survey for raising main, delivery chambers & pump houses & land acquisition required for the same. Same is proposed for survey & construction of main, LBC & RBC including lining and F- RHT works etc. land acquisition for the same & distributaries under the same. Same is proposed for maintenance of KT weirs of Bhima Sina LIS as well as, management of Shirapur LIS as a permanent sub division.

Man power Both skilled and unskilled labours are required to complete the scheme. Broadly category of different types of labours required is as below: 1. Machinery Operators and drivers 2. Fitters and mechanics for repairs 3. Masons 4. Unskilled labour, Mazdoor

Trained operates, drivers fitters mechanics will be available from district place Solapur and other unskilled labour will be available in the local area.

Plant / Equipment planning This being a lift scheme no heavy machinery except cranes is required as in case of Earthen/Masonary dams. However a token provision for each type of required machinery is made in the estimate.

Page 33: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XIV

Foreign Exchange Element 14.1 Foreign Exchange To have foreign exchange for this scheme is a policy matter. However due to formation of M.K.V.D.C. this is felt not necessary.

Page 34: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XV

Financial Resources

15.1 Financial forecast Construction cost: The detailed estimates are prepared for I- Head work, II-Main canal. The cost of III distributaries is worked out on lump sum basis. The cost of the project based on the Pune region CSR 1995-96 including direct & indirect charges works out to Rs. 5785.12 lakhs & cost of Bhima Sina link tunnel debited to Shirapur LIS is Rs. 3271.51 lakhs. Details of the same are as below. The direct & indirect charges are as under:-

Sr. No. Charges Rupees in Lakhs A Direct Charges I Head works 2835.86 II Main canal & branches 1548.68 III Distributaries 449.50 Total for I- works 4634.04 a Establishment Charges At

20% on I work except B-lands 922.44

b Ordinary T & P charges @ 3.5% on establishment charges.

161.43

c Leave & Pensionary charges @ 3.5 % on establishment charges.

32.29

d Loss on stock 0.25% on cost of B-land & Q- Spl. T & P

11.40

Total 5761.60 Deductions a Salvage value of temporary

buildings @ 15% -----

b Receipts & recoveries due to resale of special T & P (except personal carries) @ 75%

24.41

Page 35: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

c Receipts due to resale of personal carriers @ 20%

2.80

Total (-) 27.21 Total Direct charges 5734.39 B Indirect Charges a Capitalization of abatement of

land revenue charges 0.0004

b Audit & Account charges @ 1% of I- works excluding B-Lands.

46.12

c Secretariat charges @ 0.5% on establishment charges

4.61

Total Indirect charges 50.73 Total cost of the project (A+B) 5785.12

The scheme is proposed to be completed in a period of 3 years. Therefore average expenditure per year works out to Rs. 1928.37 lakhs. It is presumed that this much amount of funds will be available from financial planning of the state.

Page 36: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XVI

Estimates 16.1 Estimate The estimates of the scheme are divided in three major sub-heads as under Sr. No. Major head Amount Rs. Lakhs I Head Works 2635.86 II Main canal 1548.68 III Distributories 449.50 Total 4634.04 16.1.02 Sub Heads

The above three major heads are further sub divided into the following sub heads. Sr. Sub Estimate I-Head works II- Main Canal Total Rs. In

lakhs 1 A-Preliminary 2.23 1.62 3.85 2 B-Lands 1.47 20.35 21.82 3 C-Works 2585.01 459.59 3044.60 4 D-Regulator --- 6.19 6.19 5 E-Falls --- --- --- 6 F-RHT Works --- 250.49 250.49 7 G-Bridges --- 20.49 20.76 8 H-Escapes --- 0.94 0.94 9 K-Buildings --- --- --- 10 L- Earth Work --- 747.29 747.29 11 M- Plantation 0.10 14.92 15.02 12 O- Miscellaneous 3.60 1.78 5.38 13 P- Maintenance 3.09 1.56 4.65 14 Q- Spl. T & P 30.38 16.19 46.55 15 R- Communication 10.00 7.00 17.00

Total 2635.89 1548.68 4184.54 III- Distributories --- 449.50 449.50

Grand Total 2635.86 1998.18 4634.04

Page 37: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

16.2 General Rates of various items of construction adopted for estimation of the scheme are as per sanctioned schedule of rates, Maharashtra State (Pune Region) for the year 1995-96. A- Preliminary This estimate provides for caqrrying detailed survey & investigation of various items such as rising main, canals, distributories, command area. Foundation exploration for major structures on canals, soil survey in command, taking trail pits on canal alignment etc. provision for all the items in mode in the estimate of I Head work as well as II main canal. B- Land The land is required to be acquired for construction of inlet channel, sump well, rising main, delivery chamber & also for construction for canals etc.provision for the same is made in the sub estimates of B- Lands for Head works & canals. Approximate classification of land by visual survey is done such as Jirayat, Bagayat , Govt & Waste land etc. for arriving at the land cost the present rate for various types of lands are taken as per enquire done at Revenue Dept. In addition to the above, following rates on percentage basis are considered while preparing estimate.

1. Compulsory acquisition charges- 3% 2. Demarcation charges- 1% 3. Interest charges- 20% 4. Provision for legal charges (lump sum)

C- Works I- Head works: This includes inlet channel, jack well, pump house, rising main, delivery chamber etc. in civil portion as well as fixing V.T. pumps, providing HT cabals up to pump house, providing & fixing switches, cables, starters etc. in electrical & mechanical portion. Provision for construction of these works including other appurtenant works is made in this sub estimate of C-works for laying of pipes of Rising main & other sub-sidiray items rates are adopted as per schedule of rates of Environmental Engineering Dept. for the year 1995-96 II- Main canal: Provision for providing lining to the canal having capacity more than 100 cusecs is made in the estimate of C- works of the II- main canal. It is proposed to line the main canal & right bank canal from 0 to 30 km. E-Falls As the command area of the scheme is having gradual slopes no provision for construction of falls is found necessary.

Page 38: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

F- R.H.T. works There are in all 11 no. of C.D. works in the surveyed run of main canal & other canals. The details of structures & their No. are as below-

1. H.P. culvert 2 2. Aquaduct 3 3. Slab culvert 6

Total 11 The type estimates of each type of C.D. works are prepared & cost of all structures has been worked out on the basis of these type estimates. There after for unsurveyed portion of canal percentage of L- earthwork to F- RHT works of surveyed portion is worked out. The same percentage to the L- earthwork cost is considered for arriving the total cost of F-RHT works. G- Bridges To maintain the percent communication system in the project area necessary provision for construction of bridges across canal is made in this estimate. A sample estimate for one of the bridge is made in this estimate. A sample estimate for one of the bridge is made; accordingly cost for construction of all bridges is worked out. More over provision for foot bridges at lump sum basis is also made under this sub estimate. H-Escapes Provision for 4 escapes is made in the estimate to control the flow of canal during failure of canal. K- Buildings There is no separate provision for buildings under this sub head for any work. Out of six sub divisions proposed for Bhima Sina LIS, one of six sub divisions proposed for Shirapur LIS also. This sub division will also work as maintenance sub division after completion of this scheme. For this sub division provision for temporary & permanent residential buildings is made in the sub estimate of Bhima Sina LIS. Earth work In all 29.83 km length of canal is required to be constructed to provide irrigation to 10000 ha of area in N. Solapur & Mohol talukas. Provision for construction for same is made under this sub estimate of II-Main canal & branches. M-Plantation The estimate is prepared for plantation & maintaining trees along the both sides of canals. In addition to this provision for guards & other protective works to trees is also

Page 39: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

made under this sub estimate of II-Main canal & branches. For I-Head works provision for establishing garden/ nursery/ in the vicinity of pump house etc. is done. Provision for planting & maintaining garden/ nursery in colony area is already made in the sub estimate of Bhima Sina LIS, as colony of Bhima Sina LIS will also be utilized by this scheme. O- Miscellaneous I- Head works: Under this sub estimate provision for various amenities such as medical services, security services, telephone services etc. as well as other miscellaneous works is covered on the lump-sum basis. Provision for water supply, sanitary, electrification etc. for colony etc. is already made in the sub estimate of Bhima Sina LIS, as colony of Bhima Sina LIS will also be utilized by this scheme II-Main canal: Provision for boundary stones, temporary service road along the canal during construction is made under this sub estimate. P- Maintenance During construction the cost for maintenance of head works & canals is covered under this sub estimate. Q- Special tools & plants This is a lift scheme consisting pump house, rising main & canals; only token provision of each type of machinery is made under this estimate on broad basis. Major expenditure is towards purchasing of rising main & pumps. Remaining work consists of mansonary work of pump house, delivery chamber, canal structures & earth work of canal as such. R- Communication Provision for construction of approach road, division of roads, nalla crossing etc. is made under this sub estimate of I- Head works & II-Main canal. Work being not of fix nature provision for this is made on lump basis. 16.3 III- Distributories Provision for construction of distributories is made under this estimate based on actual expenditure required to be carried out at present under Ujjani project.

Page 40: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME

TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XVII B.C RATIO AND FINANCIAL RETURNS

17.1 B.C Ratio and Financial returns Benefit cost ratio has been worked out with following data. A) Benefits of agricultural produce: i) The yield rates of agricultural produce for different existing and proposed crops are taken as per agricultural Department Circular for the year 1994-95. the benefits of crops per hector before and after introduction of irrigation are considered as per communicated by the deputy Director, agriculture Department’s circular and benefits of exiting crops which are not available in circular are worked out considering yield. ha at 50% of irrigation crop. ii) Expenses of seeds, manure and fodder etc. are considered as per Agriculture department’s circular. B) Annual cost of project:

I. Simple interest @ 10% on capital cost of the projects is considered. II. Energy charges of L.I. Scheme are taken as rate Rs. 300/HP.

III. Depreciation charges are considered 1% (excluding cost of rising main and pumping machinery)

IV. Depreciation of pumping system is taken 8.33% of pumping cost considering lift of pumping system as 12 years.

V. Depreciation of rising main is considered @ 3.33% of cost of rising main considering life of rising main as 30 years.

VI. Annual maintenance charges area taken @ Rs. 500/ha of CCA. VII. Maintenance charges are taken @ 1 %. 17.2 B.C. Ratio

The B.C. ratio of the scheme works out to 1.08. The cost per ha/acre of irrigable area works out to Rs. 90566/ha & 36519/ac.

17.3 Conclusion

1. The B.C. Ratio of the scheme works out to 1.08 which is attractive compared to limit of 1.0 prescribed for drought prone area.

2. The scheme will improve socio economic condition due to employment, small scale industries, poultry and other supplementary works of so far

Page 41: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

scarcity affected area of Mohol and N. Solapur by providing irrigation facilities.

3. After commencement of this scheme drought relief measures will not be required in future resulting the indirect benefit towards the scheme.

4. Working cost of the scheme definitely increases year to year. As compared to this benefits of crops do not increase because those are fluctuating and depend upon demand & supply. Due to increase in food grain prices of some commodities are likely to shut down in future. This affects economics viability of the scheme. However green revolution is need of time. Water is precious, water is life, hence by all means we have to harness available water resources and use it probably where it is needed before 2000 A.D. So apart from B.C. ratio keeping in mind, all other indirect benefits etc. & to have social justice this scheme needs to be launched.

5. Flow irrigation is traditional method of irrigation. To have saying in water and increase in irrigation potential the beneficiaries need to be persuaded to use it by adopting modern technology of sprinkles / drip system. Initial cost of this may be more, but farmers will accept it, if it is strongly recommended and increase benefits are brought to the notice.

6. This scheme is part and partial of Ujjani project. Many Lift scheme are proposed through the planning of Ujjani project. Some of them are either economic or costlier even. However considering them all together composite Ujjani project should be considered.

7. The scheme is therefore recommended for approval. B.C. Ratio Calculation Sr. No.

Item Amount Rs. In Lakhs

I ESTIMATED COST OF THE PROJECT (D.S.R. 1995-96) COST OF LINK CANAL DEBITED TO SHIRAPURL.I.S.

(A) 5785.12 3271.51

Total 9056.63 II ANNUAL BENEFITS

Gross Value of irrigated produce Rs. 159.41 Lakhs for 10000 h

1594.10

Page 42: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

III DEDUCTIONS Gross value existing produce Rs. 26.68 Lakhs For 10000 ha

266.80

ii) Loss of agriculture produce from area coming under canals @ Rs. 26.68 lakhs per 1000 ha Hence, for G.C.A. = 82 ha

I.C.A (50%) = 41

1.09

TOTAL ANNUAL BENEFITS (B) RS. LAKHS

1326.21

Page 43: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Sr. No.

Item Amount Rs. In Lakhs

Project cost. 9056.63 IV Annual cost 1. Interest charges @ 10% 905.66 2. Description @ 1% on the cost, excluding

cost pumping system and rising main i.e. on (9056.63-1439.93-1083.75) = 6532.95

65.33

3. Depreciation on cost of pumping system @ 8.33% (Assuming life of machinery 12 years ) i.e. on 1727.52

119.95

4.Depreciation on cost of rising main @ 3.33% (assuming life of rising main 30 years) i.e. on 1083.75

36.09

5. Power charges of L.I. scheme @ Rs. 300/HP i.e. on 10800

32.4

6. Annual Maintenance @ 1 % of cost of I Head works i.e. on a) Shirapur LIS- i.e. on Rs. Lakhs 2635.86 b) cost of link canal debited to Shirapur LIS- i.e. Rs. Lakhs 2650.46 Total 5286.32

52.86

7. Administrative charges @ Rs. 500/ha for C.C.A. of 16000 ha

80.00

Total annual cost (B) Rs. Lakhs 1292.29 B.C. Ratio = A/B = 1326.21 1292.29

B.C. Ratio = A/B= 1.03

Page 44: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPURLIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT: SOLAPUR

CHAPTER XVIII

ENVIRONMENTAL STATUS 18.1 Environmental status

Lift scheme is proposed on existing major Ujjani reservoir, and therefore no environmental clearance is involved. This scheme is one of the components of Ujjani project to realize full utilization of water. It consists of tunnel and deep cut only, as such clearance from environmental angle is not involved.

Page 45: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

SHIRAPUR LIFT IRRIGATION TAL:MOHOL, DIST-SOLAPUR

GENERAL NOTE WITH REFERENCE TO REVISION OF PROJECT REPORT Introduction

The Shirapur Lift Irrigation was Administratively Approved by MKVDC

Pune vide Marathi lr.No. Shirapur/296/(146/96), PB-2 Dt.10/10/1996 for

Rs.9056.63 Lakhs. Rates adopted for the AAPR were as per sanctioned

DSR in the year 1995-96 & prevailing market rates for the itess which were

not included in the schedule of rates

As per revised project report 2010-11 the total cost of the scheme

comes Rs.24779.95 Lakhs

Present Status of the Scheme

From the date of Administrative Approval (i.e.10/10/96) till the deteline

of revision of Project Report i.e. Dt.30/07/2010 various component of the

scheme have been tackled. The works tackled so far are as follows-

A) Head works:- i) Preliminary investigation for the head works i.e. pump house, rising main

delivery chamber is completed.

ii) Pumping capacity, rising main details (No. of rows, dia thickness) also

finalized.

iii) Design of head works is monstly completed through the consultant.

iv) Detailed estimates on the basis of actual design received are framed &

these are sanctioned by Competent Authority.

v) Rising mains is almost completed.

B) Canal 1) Preliminary investigation & detailed alignment survey is completed & the

length of link canal, RBC Km.1 to 7 & LBC Km.1 to 4 is completed.

2) The Survey work of Km.5 to 16 of LBC (i.e. Kalman Extension) is

completed & the alignment is approved.

3) Command area survey is in progress.

4) Extension of LBC from Km.5 to 16 (Kalman extension) – Shri.Uttam

Prakash Khandare, MLA (Tal:North Solapur) requested in his letter to the

Chief Minister, Govt. of Maharashtra dated 09/12/1996 regarding extension

Page 46: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

of LBC to irrigate the villages Gavadi Darphal, Kalman, Kauthali, Padsali

etc. in Noth Solapur Taluka Compared to project report provision, there is

reduction in command area of RBC, due to (1) Forest Area, (2) MIDC Area

(3) MI Tank Command, (4) Area which can not be brought under irrigation

due to growth of Industries & housings. Total deduction in area due to

above factors is 2087 Ha. to compensate this area LBC is extended from

Km.5 to 16 MKVDC has given Approval to this proposal of extension vide

marathi letter No.797/ (529/97) PB-5 dated 13/05/1998. Due to this

extension there will be no increase or decrease in the total ICA considered

in project report.

Necessity for Revision of Project Report 1 As stated earlier, AAPR was framed on the basis of rates for the year

1995-96 since from the date of A.A. period of 15 years have been passed.

In this period various works are undertaken & details of various

components have been finalized. Hence it is notice that Revision of the

project report is necessary. Various reasons for Revision of Project Report

can be summarized as below-

a) Broad & conceptual designs of the scheme have been finalized & important

parameter of lift scheme i.e. pumping capacity, No. of pumps, type of

pumps, rising main, No.of rows & their diameter, thickness etc. are

finalized. And after detailed design it is noticed that there are substantial

engineering modifications & cost of these components is likely to be

increased as compared to the provisions for the same in AAPR.

b) Regarding main head work components like inlet channel & forebay, pump

house, pipe laying, delivery chamber, it is noticed that there is considerable

Engineering modification which will definitely cause increase in cost of the

scheme.

c) In respect of canals, detailed estimates for surveyed portion which are

based on approved alignment, canal sections finalized, revealed that there

is considerable change in provision made AAPR & provisions need to be

revised.

d) Provisions in the AAPR for some of items e.g. cost of Mechanical, electrical

components etc. were based on either pro-rate basis or lump-sump basis.

Now detailed estimates for their items are ready which shares necessity

Page 47: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

for revision of earlier provisions in AAPR.

e) Increase in the rates of various components including cost of land.

f) Total cost of sanctioned estimate has reached the total estimated cost of

the scheme, still number of components remains untackled.

g) In respect of canal it is necessary to incorporate number of canal structures

as per site requirement, similary there is also changes in rates of irrigation

benefits.

2 In view of the above points it becomes necessary to revise the project report

taking into account the details finalized so far, increase in the cost of the scheme

as well as increase in the benefits & arrive at the revised cost of the project.

Detaeline considered for revision of the project report- It is decided to revise the project report considering the rates for the year 2010-

11. Total cost of all subhead/ items under sub-head cost total in (i) Actual

expenditure & (ii) costg of balance work on the deteline of the revision is

considered 30/07/2010.

Comparision of provisions for important components/ items as per AAPR & revised project report in case of which the provisions are considerably changed. Sr. No. Pa36rticulars As per AAPR As per RPR

Stage-I Stage-II Stage-I Stage-II 1 Pumps a) Total capacity (HP) 7200 3600 2800 1600 b) Numbers (Working +

Standby) 8 + 1 4 + 1 4 4

c) HP of each pump 900 900 700 400 d) Type of pump VT VT VT Centri

Fugal Pumps

2 Rising Main a) No. of Rows 2 2 2 2 b) Diameter in mm (Outer) 1219 1219 1500 1500 c) Thickness in mm 8 8 10 10 d) Length of Rising Main Canal 4.03 2.55 3.77 2.52 3 Pump House a) Size in m x m 40 x 30 90 x 75 20 x 11 36 x 11 4 Length of canal which is to be

lined in Km.10.92 + 1.06 = 12.52 Km

Main Canal 9.63 Km

RBC 15.50 Km

Link Canal 11.00 Km

RBC 1.06 Km

5 Canal Structures in Nos. Link Canal

SWF 01 Escape 01 F.R.H.T. 13 G-Bridges 10

Page 48: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

RBC S.W.F. 03 Escape 01 V.R.B. 22 F.R.H.T. 11 LBC S.W.F. 01 V.R.B. 17 F.R.H.T. 19 a) Regulars (CR, HR, SWF) 0 b) Escapes 04 c) F-RHT works 11 d) Bridges 12 6 Area of land to be acquired in

Ha. 82 76.37 370.26

7 Annual electrical energy charges considered in BC Ratio calculations (RS/HP)

300 300

Following method is adopted while revising the estimate-

1 Separate estimates are prepared for each sub-head under I-head works as

well as II-Main Canal & Branches.

2 Total estimated cost for each sub-head is worked out on the basis of actual

expenditure incurred upto 30/07/2010 & balance work as on Dt.01/08/2010.

3 In respect of important cimponents under I-Head works viz. Pump House,

Rising Main, Delivery chamber estimated cost considered in this revised

project report is as per the technically sanctioned estimate prepared on the

basis of approved design.

4 Mechanical components i.e. pumping machinery & allied equipments is

based on the basis of approved designe prepared by private consultant.

5 Electrical components- a) Power supply (33 K.V.) actual quotation received from M.S.E.B.

b) Estimates are prepared on the basis of detailed design received from

design consultant.

6

Canals:-

6.1 Lining : Length in which canal lining is proposed where Q > 100 cusecs.

Page 49: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

6.2 Earth work : Estimates are divided in two parts i.e. surveyed length &

unsurveyed length. For surveyed portion the total estimated cost is worked

out canalwise i.e. link canal, LBC & RBC & it is on the basis of kilometer

sanctioned estimates.

For un-surved length of canal

a) Type estimate are enclosed for RBC & Link canal.

b) Cost/ Cunecs/ Km. is worked out on the basis of canal discharge in that

length & estimated cost.

c) On the basis of design discharge & length of reach cost is worked out on

the basis of cost/ Cumecs/ Km.

6.2.1

Structures-

a) F-RHT work: On the basis of estimated cost of some structures of which

detawise are finalized.

b) Bridges : Estimate is prepared for a bridge on the basis of detawise are

finalised.

6.3 Other Subheads- Sr. No. I-Head Works II- Main Canal

1 M-Plantation M-Plantation 2 O- Miscellaneous O- Miscellaneous 3 Q- Spl. T & P P- Maintenance 4 Q- Spl. T & P 5 R- Communication

Excess – Saving over the AAPR

1 There is about Rs.15723.32 Lacs excess 173.63% over the cost of project

as per AAPR under each major head i.e. Headwork & canals respectively

comparison of AA cost, split up of excess/ saving in to various categories

for each sub heads are given in excess saving statement.

2 Excess is mainly in C – Works of I - Head Works

Page 50: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Excess in C-Works of Head Work in respect of Pump House, rising Main

etc. is mainly due to structural engineering modifications during detailed

design.

Fesibility of Scheme

1 Calculating the benefit cost ratio on the basis of revised cost & benefits has

checked feasibility of the scheme. Benefit cost ratio is worked out on the

same basis that is followed in AAPR.

2 Following points need to be noted regarding BC Ratio calculation

1 Annual cost of the electrical energy is worked out taken in to account

current electgrical energy tariff.

2 Details regarding pre-project & post-project benefits for the year per

3 On revision of the project report BC Ratio works out to 1.65

4 This L.I.Schene is from the fringe of Ujjani reservoir. In total 7 L.I.Schenes

are in progress & one L.I.Sche is proposed from (Bhima) Ujjani Project

Reservoir. Combined B.C.Ratio of these all projects is more than one.

Sub-Divisional Engineer Executive Engineer Ujjani Canal Sub-Division No.16 Ujjani Canal Division No.8 SOLAPUR SOLAPUR

Page 51: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Command Area Map

Page 52: SHIRAPUR LIFT IRRIGATION SCHEME TALUKA: MOHOL DISTRICT ...environmentclearance.nic.in/writereaddata/Online/TOR/0_0_19_Nov... · shirapur lift irrigation scheme taluka: mohol district:

Recommended