+ All Categories
Home > Documents > Shooting schedule

Shooting schedule

Date post: 30-Nov-2014
Category:
Upload: alewalker
View: 324 times
Download: 3 times
Share this document with a friend
Description:
 
5
TASK 8 SHOOTING SCHEDULE
Transcript
Page 1: Shooting schedule

TASK 8

SHOOTING SCHEDULE

Page 2: Shooting schedule

For my first day of shooting my music video I will shoot it along the riverside. For the first day I will only use my male

model (Troy) because he is playing the lead singer of the band. I want to chose a time of day when it is warm and sunny rather than cold and wet but because it’s October

this might be a problem. I want to use a silhouette effect on this part of my music video so you only see the a dark

shadow like effect of my model has he plays guitar. For the first day of shooting I will need a guitar for props and I will

also be using a tripod to create steady shots. The time of day I was thinking to do my music video would be between the hours of 12-3pm so in total the first day of shooting will

be roughly three hours and that included getting to the location and setting everything up such as camera, tripod

and props.

DAY ONE -

30TH OCTOBER

Page 3: Shooting schedule

For my second day of shooting my music video I will shoot it along the riverside again but this time I want to video the path along the river. For the second day I will use both my male (Troy) and female models (Tamara) because in this scene I want them to be having a romantic walk along the river together. For this time of scene the time of day can be whenever but I would like the lighting to be bright because I

don’t want it to be gloomy as the music is quite a lovey happy song. In this shoot I want the couple to be doing activities along the river such

as walking along the river and possibly feeding the ducks. For the first day of shooting I will need to have bread for the two models to

feed the ducks with but also I will need a tripod to create steady shots. The time of day I was thinking to do my music video would be

between the hours of 1-4pm so in total the first day of shooting will be roughly three hours and that included getting to the location, feeing

the ducks and setting everything up such as camera, tripod and props.

DAY 2 –

31ST OCTOBER

Page 4: Shooting schedule

For my third day of shooting my music video I will shoot it along the riverside again but this time I want to video the boardwalk scene. For the second day I will use both my male (Troy) and

female models (Tamara) because in this scene I want the male model to be looking at the female model lovely as she stands

next to the river on the boardwalk but also I want to do the “dip our feet into the sea” part. For this time of scene the time of day I would like to do it when the weather is a bit sunny because the

models will be putting their feet into cold water. For the third day of shooting I will need a tripod to create steady shots. The

time of day I was thinking to do my music video would be between the hours of 1-2pm so in total an hour of the third day of shooting. This includes the time getting to the location and

setting everything up such as camera, tripod and props.

DAY 3 -

1ST NOVEMBER

Page 5: Shooting schedule

For my fourth day of shooting my music video I will shoot it at a cafe. For the fourth day I will use both my male (Troy) and female models (Tamara) because in this scene I want

the male model to be looking at the female model lovely but also I want them to share a coffee as I think this is

something which is quite a cliché thing that happens in movies. For this time of scene the time of day I would like to do it is when the café is less busy because then there would be less of a distraction in the background of my

music video. For the fourth day of shooting I will need a tripod to create steady shots and also a cup of coffee from the café I will be filming my music video. The time of day I was thinking to do my music video would be between the

hours of 2-4pm so in total 2 hours of the fourth day of shooting. This includes the time getting to the location and

setting everything up such as camera, tripod and props.

DAY 4 -

2ND NOVEMBER


Recommended