Humanitarian Aid SDC/HA Emergency Operation SET Mission Philippines 2013 School assessment in the Municipality Daanbantayan, 08.12.2013, rev. 12.12.2013 Elementary Schools and National High Schools in Daabantayan, School District 1 and 2, Cebu Island Projects according to lists elaborated by Dep. of Education, Region VII, Central Visayas, Division of Cebu Province District of Daanbantayan 1 + 2 (D1, D2) and Daanbantayan Secondary Schools (HS) Due to ongoing repairs, many buildings might soon look differently than at the date assessment The assessors were always accompanied by Mr. Ernesto C. Arreglo, who represented Municipal Authorities * Rough cost estimate by Dep. of Education as above, but they might differ remarkably from reality Date School / building CRs Main damages Est. cost PsP* Assessor 22.11. 13 Calape El. School D1 Mrs Estrela 1 G. Roux- Fouillet M. Casanova Marcos type bldg. 1963 6 Unusable, to be demolished, weak steel structure, bad quality hollow blocs with bamboo reinforcement 1’200’0 00 Bagong Lipunan bldg. ~1975 3 No structural cracks in concrete pillars, general repairs plus windows rest rooms 400’000 ITC room, Marcos type 1963 3 Unusable, to be demolished, weak steel structure, bad quality hollow blocs with bamboo reinforcement 600’000 Kinder room, Marcos type 1970 2 Unusable, to be demolished, same as above 400’000 Page 1 of 28
Transcript
Page 1: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

SET Mission Philippines 2013School assessment in the Municipality Daanbantayan, 08.12.2013, rev. 12.12.2013

Elementary Schools and National High Schools in Daabantayan, School District 1 and 2, Cebu IslandProjects according to lists elaborated by Dep. of Education, Region VII, Central Visayas, Division of Cebu ProvinceDistrict of Daanbantayan 1 + 2 (D1, D2) and Daanbantayan Secondary Schools (HS)Due to ongoing repairs, many buildings might soon look differently than at the date assessmentThe assessors were always accompanied by Mr. Ernesto C. Arreglo, who represented Municipal Authorities* Rough cost estimate by Dep. of Education as above, but they might differ remarkably from reality

Date School / building CRs Main damages Est. cost PsP*

Assessor

22.11.13 Calape El. School D1Mrs Estrela

1 G. Roux-Fouillet M. Casanova

Marcos type bldg. 1963 6 Unusable, to be demolished, weak steel structure, bad quality hollow blocs with bamboo reinforcement

1’200’000

Bagong Lipunan bldg. ~1975

3 No structural cracks in concrete pillars, general repairs plus windows rest rooms

400’000

ITC room, Marcos type 1963

3 Unusable, to be demolished, weak steel structure, bad quality hollow blocs with bamboo reinforcement

600’000

Kinder room, Marcos type 1970

2 Unusable, to be demolished, same as above

400’000

Canteen/lunchCounter/clinic

2 New roof including wooden structure

300’000

22.11.13 Bitoon El. School D1Vivian Necesario

2 G. Roux-Fouillet M. Casanova

Dep.-Ed bldg. 2001 4 2 buildings to repair: roof sheets, windows repairs, suspended ceiling

600‘000

Marcos Type bldg. 1965 3 New roof sheets, suspended ceiling

600‘000

Bagong Lipunan bldg. ~1975

5 Minor repairs, hollow bloc parapet, roof eaves, (termites)

500‘000

Filipino ChineseChamber building, 2012

2 Unusable, roof, walls and pillars collapsed, to be demolished and rebuilt

1‘600‘000

Home economics bldg. 1980

Minor repairs roof, sheets, suspended ceiling

150‘000

Page 1 of 20

Humanitarian Aid SDC/HA Emergency Operation

Page 2: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

School Stage Roof damages to be repaired 200‘000

22.11.13 Bakhawan El. School D1Jervies P. Monterde

3 G. Roux-Fouillet M. Casanova

Marcos Type bldg. ~1970 3 Replacement of roofing, trusses, ceiling, room partitions, rewiring

1‘000‘000

Bagong Lipunan bldg. ~1975

3 Replacement of roofing, trusses, ceiling, room partitions, rewiring

1‘000‘000

Gonzales bldg. ~1960 2 Minor damages, no intervention 600‘000

LGU bldg. 1980/2012 1 1980 part ok2012 part to be replaced

800‘000

School Stage Replacement of roofing, trusses and ceiling

18‘000

2 other buildings(not on list)

OK no intervention --

22.11.13 Paypay El. School D1Rommel Compuesto

4 G. Roux-Fouillet M. Casanova

Marcos Type bldg. ~1970 3 Replacement of roofing, secondary steel roof structure and suspended ceiling (all steel rusty)

2’400’000(?)

Marcos Type bldg. ~1970 3 Replacement of complete steel roof structure and window repairs

800’000

Gonzales bldg. ~1960 3 Unusable, mostly destroyed, to be demolished and rebuilt

2’400’000(?)

LGU bldg. 2011 3 Replacement of roof incl. steel structure, ceiling repair

5’000’000(?)

School stage Bearing structure ok, walls and roof collapsed

5’000’000(?)

2 other buildings(not on list)

4 Only minor damages ???

Toilet bldg (not on list)

Structurally damaged, to be almost totally rebuilt

???

23.11.13 Poblacion Daanbatayan Central School D1Jeffrey Coyoca/Rosa Cutab

5 G. Roux-Fouillet M. Casanova

Marcos Type bldg. ~1965 6 Replacement of roof sheets, steel purlins and suspended ceiling, repairs/replacement steel posts, repair hollow block walls

1’200’000

Audio-visual bldg. ~1976 5 New roof including wooden structure, repairs ceiling, windows (termites), partition walls and minor repairs

1’500’000

Industrial Arts bldg. ~1952

2 New roof sheets, repairs ceiling and windows, main damages caused through aging and termites, reconstruction

600’000 (?)

Page 2 of 20

Page 3: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Magsaysay bldg. 1 Old, wooden parts heavily affected by termites, no damages by typhoon

50’000

Gabaldon bldg. 1915 (protected heritage?)

9 Repair concrete pillars, most wooden parts heavily affected by termites, including roof, main damages caused by aging

5’400’000

Bagong Lipunan (3 bldg.) 2/9 In 2 rooms damaged roofing sheets, termites, only minor damages by typhoon

30’000

Several makeshift bldg. 4 Light structures, collapsed, no SDC intervention

200’000

Clinic, before 1952 1 Damages to added light plywood room

50’000

Canteen, simple annex to audio visual room

1 New roof including wooden structure

50’000

3 other bldg. and stage(not on list)

OK no intervention --

23.11.13 Bagay El. School D1No school representative

6 G. Roux-Fouillet M. Casanova

Gonzalez bldg. 4 1 bldg. mostly collapsed, to be rebuilt including foundation,

3’200’000

Bagong Lipunan bldg.(2 bldg.)

5 Bldg. 1 :collapsed, demolition, to be rebuiltBldg. 2 : repairs roof sheets and ceiling

1’000’000

Marcos Type bldg. 6 Structure quite rotten, 6 rooms roughly repaired by Israeli army

900’000

Dep.-Ed. (2 bldg.) 3 Roof incl. structure off, repair susp. ceiling, rewiring

450’000

H.E. bldg. 1 Totally collapsed, to be rebuilt 800’000

School Stage Totally collapsed, to be rebuilt 500’000

Toilet block (not on list) Repair roof sheet ???

23.11.13 27.11.13

Libertad Primary School D1Argin Yongco

Barangay Bagay 7 G. Roux-Fouillet M. Casanova

Gonzales bldg. 1947 (?) 2 Totally collapsed, to be rebuilt (previous damages by earthquake)

1’360’00

Bagong Lipunan bldg. ~2002

1 New roof sheets incl. purlins, new ceiling and windows, repairs trusses, door, wiring

680’000

PTA bldg. (makeshift) 1 Built with bamboo, collapsed and blown off

680’000

26.11.13 Tinubdan El. School D1Emma Mercado

8 M. Casanova

Marcos Type bldg.~1975 6 Repairs with new sheets on most of the roof (steel structure rusty)

1'000’000(?)

Page 3 of 20

Page 4: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Bayan Muna bldg 1994 3 New roof sheets and purlins, new ceiling, repairs on steel trusses, light partition walls, windows and doors

1'000’000(?)

Bagong Lipunan bldg. 1984

3 ~40% of roof sheets incl. wooden structure to be replaced (bearing wooden structure affected by termites), repair ceiling

500’000

School clinic 2006 1 Repair windows 100’000

School fence Not part of assessment 100’000

26.11.13 Malbago El. School D1Glenn Tahanlangit

9 M. Casanova

Bagong Lipunan bldg. ~1982 rehab. 2012

4 ~40% of roof sheets to be replaced, repairs purlins, ceiling

350’000

PTA bldg. ~1995 1 Roof incl. wooden structure totally destroyed, replacement

500’000

Dep.-Ed bldg. ~1995 2 Roof incl. steel trusses along front façade destroyed, 50% of roof replacement, repairs ceiling and light partition wall

1’000’000

Marcos Type bldg.~1975 3 Repair of damages at roof eaves on bldg. corners (roof steel structure in bad condition)

300’000

Marcos Type bldg.~1975 2 bldg

3+3 Minor damages on roof ???

26.11.13 Bateria El. School D1Generoso Monterde

10 M. Casanova

Marcos Type bldg.~1975 3 Repairs roof sheets and ceiling along eaves

500’000

Gonzalez bldg. ~1970 2/4 In 2 rooms repairs roof sheets light partition wall and wiring

400’000

Marcos Type bldg.~1965 2 Replacement roof sheets, repair wooden roof structure, ceiling and wiring

400’000

Gonzalez bldg. ~1965 2 Minor roof repairs 400’000

Canteen New roof on light wooden structure 50’000

Bagong Lipunan bldg. (not on list)

3 No damages --

School Clinic bldg. 2000 (not on list)

1 Minor damages on roof ???

27.11.13 Bakhawan Pangadlawan El. School D1 Vic Manzano

School not on list mentioned aboveremote location

11 M. Casanova

DPWH bldg. 2004 3 ~50% roof sheets and wooden purlins destroyed, repair ceiling

???

LGU bldg. 1998 1 ~50% roof sheets and wooden purlins to be replaced, new ceiling, repair wiring, no windows

???

Page 4 of 20

Page 5: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Barangay bldg. 2001 (attached to LGU)

3 Almost totally destroyed, brick walls collapsed, to be demolished, replacement

???

School Stage New back wall (collapsed) and roof sheets, repair roof structure

???

27.11.13 Ginsulongan El. School D1Maria Victoria R. Gulbe

Barangay Payay 12 M. Casanova

Marcos Type bldg.~1968 3 Roof repair (building in very bad condition, steel roof structure rusty, wall cracks by earthquake)

250’000

School Stage (used for teaching)

Totally collapsed, to be replaced by classroom bldg.

300’000

PTA Kinder room ~2008 1 Roof sheets to be replaced (very basic structure)

250’000

School Stage Not existing, plan for the future 150’000

27.11.13 Somimbang El. School D1Imelda Ygot

Barangay Bitoon 13 M. Casanova

Magsaysay bldg. ~1957 3 ~60% of roof incl. wooden structure and ceiling destroyed, replacement, repair windows

350’000

DPWH bldg. 2010 2 ~25% roof sheets blown off (steel structure with double profiles), no ceiling

280’000(?)

LGU bldg. 2007 1 Minor repairs on roof and eaves 50’000

Dep.-Ed bldg. 2009 2 Roof sheets incl. steel structure (too weak) and ceiling almost totally destroyed, replacement

100’000

School Stage Totally collapsed, to be rebuilt 100’000

27.11.13 Pajo El. School D1 Montesa Miaga

14 M. Casanova

Marcos Type bldg.~1975 3 Repair roof incl. purlins, damaged eave at bldg. corner

300’000

Science bldg. ~1995 5 Minor roof and window repair 350’000

Bagong Lipunan bldg. 2000

2 ~50% of roof sheets to be replaced

250’000

School Stage Totally collapsed, to be rebuilt 150’000

School Nursery Not relevant for assessment 20’000

School gate Not part of assessment 70’000

School Canteen Not existing 30’000

27.11.13 Dalingding El. School D1Erlinda A. Tabora

School not on list mentioned aboveRehab by “Shangri-la’s Mactan”

15 M. Casanova

PTA Kinder room ~1988 1 Simple light material bldg. collapsed

???

Page 5 of 20

Page 6: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Corey Modular bldg. 1988

3 Tube-like concrete leaf bdlg., not in use anymore

--

LGO bldg.. 2002 1 Roof incl. wooden structure and ceiling totally destroyed, wall cracks, bldg. to be demolished and rebuilt

???

Dep.-Ed bldg. 2005 1 Roof incl. steel structure and ceiling totally destroyed, replacement, big cracks in floor slab due to earthquake, repairs upper gable walls and wiring

???

DPWH bldg. 2004 2 Roof sheets, purlins and ceiling totally destroyed, replacement, repair windows

???

LGO bldg. 2003 1 Roof incl. wooden structure totally destroyed, replacement, repair ceiling

???

Science bldg. 1990 2 Roof incl. wooden structure and ceiling at one bldg. corner to be replaced (~20%)

???

27.11.13 Malingin El. School D1Jocelyn Ares

School not on list mentioned above

16 M. Casanova

Dep.-Ed bldg. 2005 1 ~25% of roof sheets and wooden purlins to be replaced

???

Dep.-Ed bldg. 1998 1 Roof incl. wooden structure almost completely destroyed, replacement

???

Marcos Type bldg.~1975 3 Repairs roof and ceiling ???

PTA bldg. ~1985 (annex to Marcos Type bldg.)

1 Roof incl. wooden structure almost completely destroyed, replacement, wall cracks, repair ceiling

???

Bagong Lipunan bldg. 1980

3 ~30% of riif incl. wooden structure and ceiling to be replaced (big parts of bldg. affected by termites)

???

Arroyo bldg. 1994 No damages --

School Stage Almost totally collapsed (2 concrete pillars left), replacement

???

25.11.13 Agujo El. School D2Amor Banares

17 M. Casanova

Dep.-Ed bldg. 2000 1 Minor repairs on roof sheets, windows and ceiling

100’000

Marcos Type bldg.~1975 3 Partially damaged roof sheets and partition wall

600’000

LGU bldg. ~1988 3 Roof incl. wooden structure and partition walls collapsed, windows along back façade blown off, difficult to repair

1’200’000

Gonzalez bldg. ~1970(not on list)

1 New roof including wooden structure, repairs windows

???

Page 6 of 20

Page 7: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Bagong Lipunan bldg. ~1973

1/4 In 1 room roof sheets, purlins and windows heavily damaged and its annex in hollow blocks collapsed, otherwise minor damages on roof, purlins and ceiling

1’600’000

3 other bldg. (not on list) OK no intervention --

School Stage (not on list) Roof blown off ???

25.11.13 Tapilon Central School D2Rosario Dublin (Principal) and Tony Aplaladon (District Supervisor)

18 M. Casanova

Gwen bldg. 2004 2 New roof sheets and purlins (steel trusses ok), repair windows

800’000

Bagong Lipunan bldg. ~1975

3 New roof sheets including wooden structure, windows heavily damaged

1’200’000

Marcos Type bldg.~1975rehab. 2013 (on rusty steel structure!)

9 In ~2 rooms roof sheets steel purlins and ceiling totally damaged, otherwise only minor damages

3’600’000 (?)

Imelda Marcos bldg.~1980

5 Roof sheets to be replaced (blown off, rusty), wooden structure ok

1’500’000

Magsaysay bldg. ~1956 1 Totally collapsed, to be rebuilt 800’000

Ramos bldg. ~1988 2 Totally collapsed, to be rebuilt 1’600’000

Dep.-Ed bldg. ~2000 1 Only minor damages on roof 200’000

Dep.-Ed bldg. ~2000 3 Only minor damages on roof 600’000 (?)

Gonzales bldg. ~1988 3 New roof sheets including wooden structure

1’200’000

H.E. bldg. ~1988 1 Only minor damages on roof and ceiling

400’000

25.11.13 Tagasa Primary School D2 Barangay MayaTony Aplaladon (District Supervisor)

19 M. Casanova

Dep.-Ed bldg. 2003(2 bldg.)

2 1 bldg minor roof damages1 bldg partly new roof incl. wooden structure, repair ceiling (window already damaged)

200’000

Bagong Lipunan bldg. ~1982

2 Roof partially damaged, repairs wooden roof structure and ceiling

200’000

25.11.13 Maya El. School D2Elson Inbanez (Principal) and Tony Aplaladon (District Supervisor)

20 M. Casanova

Marcos Type bldg.~1975(2 bldg.)

9 Roof sheets and part of purlins blown off (steel structure rusty) windows in 3-room bldg. damaged (no windows in 6-room building), some wall cracks by earthquake

2’700’000

Multipurpose bldg. ~1964 (not on list)

3 Replacement roof sheets, in 1 room incl. wooden structure and ceiling, repairs windows, ceiling

???

Page 7 of 20

Page 8: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Multipurpose hall (open steel structure with roof sheets)(not on list)

Most roof sheets to be replaced ???

US Aid bldg. ~1984 3 Replacement of roof sheets, purlins and ceiling, some wall cracks by earthquake

2’400’000

Gonzales bldg. ~1965 1 Roof sheets, purlins and ceiling blown off, front façade collapsed, bldg. to be demolished and rebuilt

400’000

Bagong Lipunan bldg. ~1978

3 Almost totally collapsed, to be rebuilt

2’400’000

Dep.-Ed bldg. ~1992(not on list)

2 ~50% of roof sheets, purlins and ceiling damaged

???

4 other Bagong Lipunan bldg. ~1980(not on list)

7 1 bldg. minor roof damages1 bldg. half roof damaged by fallen tree2 bldg ok

???

Canteen(not on list)

2 Roof including wooden structure to be replaced, light partition wall collapsed

???

26.11.13 Lanao El. School D2Teresa Noynay (Principal) and Tony Aplaladon (District Supervisor)

21 M. Casanova

C Dep.-Ed bldg. 2006 1 Roof incl. steel structure totally collapsed, replacement, new ceiling, repairs windows, wiring

400’000

Dep.-Ed bldg. 2006 (not on list)

1 Minor damages by fallen tree, small annex (2013) roof blown off, repair windows

200’000

Dep.-Ed bldg. 2000(not on list)

1 ~50% of roof sheets off, repairs incl. wooden structure

???

Gonzales bldg. 2001 rehab. 2007 (office)

1 Roof incl. wooden structure to be replaced, structural cracks in concrete pillars, new ceiling

1’600’000

Dela Cerna bldg. ~1952 rehab. 2001

2 Roof sheets and wooden purlins destroyed, replacement, repair ceiling

400’000

Marcos Type bldg.~1975 rehab 2009 (not on list)

3 (steel bars replaced by windows), minor roof damages

???

Marcos Type bldg.~1975 rehab 2009 (not on list)

3 (steel bars replaced by windows), repair roof sheets, light partition wall collapsed (steel roof structure rusty)

???

PTA bldg. ~1985 2 Mostly damaged, due to weak structure (trunks as pillars) to be demolished and rebuilt

???

26.11.13 Looc Primary School D2Tony Aplaladon (District Superv.)

Barangay Lanao 22 M. Casanova

Marcos Type bldg. ~1975 3 Roof sheets to be replaced, repair in steel purlins (steel structure rusty)

900’000

Page 8 of 20

Page 9: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Dep.-Ed 2000 1 New roof incl. wooden structure, some wall cracks, repair doors

400’000

26.11.13 Tominjao El. School D2Aquiles Castro

23 M. Casanova

Bagong Lipunan bldg. ~1983

3 Roof incl. wooden structure totally destroyed, replacement, light front façade above parapet and windows damaged, repair ceiling

900’000

Dep.-Ed bldg. 2000 1 Roof incl. wooden structure totally collapsed (incl. small annex 2012), some wall cracks

400’000

PTA blg 2001 (between 2 other bldg.) (not on list)

1 Totally destroyed, to be rebuilt on existing floor slab

???

Marcos Type bldg. 1969 3 Minor repairs on roof (steel structure rusty)

900’000

Marcos Type bldg. 1969 rehab. 2009

3 (windows replaced by steel bars), minor damages on roof, wall cracks (steel structure rusty)

900’000

LGU bldg. 2001 2 Roof and gable wall partially collapsed, to be replaced, new ceiling, repairs windows and light partition walls

800’000

E bldg. (incl. in Dep.-Ed) 1 400’000

Dep.-Ed bldg. 1998(not on list)

2 Roof incl. wooden structure totally destroyed, replacement incl. ceiling, repairs windows and light partition walls

???

Kitchen bldg. 2013(not on list)

1 Basic bamboo/timber structure with roof sheets totally collapsed, replacement

???

School planting bldg. (not on list)

1 Light structure with roof sheets totally collapsed, replacement

???

26.11.13 Talisay El. School D2Victoria Punay

24 M. Casanova

Magsaysay bldg. ~1979 2 Totally collapsed, to be replaced 1’600’000

Marcos Type bldg. ~1975 rehab. 2009

3 (windows replaced by steel bars), minor repairs, (steel structure rusty)

600’000

Dep.-Ed bldg. 2010 1 Roof incl. wooden structure totally destroyed, replacement incl. ceiling, repair partition wall

400’000

Marcos Type bldg. ~1975 3 ~50% roof sheets to be replaced, (steel structure rusty)

600’000

Dep.-Ed bldg. 2012(not on list)

1 Roof sheets blown off and roof steel structure totally destroyed (steel structure too weak)

???

H.E. bldg. 1965(not on list)

1 Roof sheets incl. wooden structure completely destroyed, replacement, upper gable walls (brick) collapsed, all wooden parts affected by termites, repairs

???

Page 9 of 20

Page 10: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

windows, doors

1 bldg. US AID ~1975 + Barangay fund ~1982(not on list)

3+2 1 room about 50% roof sheets and purlins damaged, otherwise minor roof repairs

???

School Stage (not on list)

Block gable parts and roof collapsed, repairs and replacement

???

26.11.13 Purgason Primary School D2Emily Taok

Barangay Maya 25 M. Casanova

Marcos Type bldg. ~1975 2 Totally collapsed, to be replaced 1’600’000

No name 2000 (not on list)

1 ~60% roof sheets incl. wooden structure destroyed, replacement incl. ceiling (weak structure)

???

Marcos Type bldg. ~1975 (not on list)

3 Totally collapsed, to be replaced ???

School Stage (not on list) Roof totally damaged, replacement

???

28.11.13 Jubot Primary School D2Tony Aplaladon (District Superv.)

Barangay Talisayremote location, motorbike only

26 M. Casanova

Dep.-Ed bldg. 1992 1 Roof sheets and purlins totally destroyed, timber trusses and gable wall (brick) damaged, replacement, repair windows

300’000

PTA Kindergarten 2012(not on list)

1 Roof sheets and purlins collapsed, timber trusses damaged, replacement

???

29.11.13 Carnaza El. School D2 situated on Carnaza IslandTeresa Rojas (Principal) and Tony Aplaladon (District Supervisor)

27 M. Casanova

Bagong Lipunan bldg. ~1966

3 About half of the building collapsed, remaining structure in very bad condition, to be demolished and rebuilt

2’400’000

Imelda Marcos bldg. 1984

2 ~25% roof sheets and wooden purlins blown off, trusses ok, repair ceiling

800’000

Dep.-Ed bldg. ~1999(not on list)

1 ~60% roof sheets and wooden purlins blown off, repair wooden trusses and ceiling

???

Dep.-Ed bldg. ~1999(not on list)

2 Minor roof repairs ???

29.11.13 Pantao Primary School D2Tony Aplaladon (District Superv.)

situated on Carnaza Island2 bldg at different locations

28 M. Casanova

Dep.-Ed bldg. ~1998 1 Some new roof sheets and ceiling repair along eaves

800’000

Dep.-Ed bldg. ~1998(?) 1 Minor damages on roof and ceiling 400’000

Page 10 of 20

Page 11: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

03.12.13 Logon Primary School D2Niels Doblen

situated on Malapasqua Island 29 M. Casanova

Remark: they already received funds from private Europeans

Bagong Lipunan bldg. ~1978

3 2 rooms almost completely collapsed, damages on roof and ceiling already repaired

900’000

PTA bldg. 2001 2 Roof incl. wooden structure and ceiling blown off, replacement

1’000’000

Lucio Tan bldg. 1982 attached to Lucio Tan

1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs ongoing

500’000

Magsaysay bldg. 1960 2 Totally collapsed, to be rebuilt 1’000’000

Marcos Type bldg. ~1969 (not on list)

3 Roof damages, repairs ongoing --

PTA bldg. 1998(not on list)

2 Roof incl. wooden structure and ceiling almost totally damaged, replacement, repairs wall cracks, wiring

???

GMA bldg. 2003(not on list)

6 Minor roof damages already repaired

--

Big Foot bldg. 2003 (not on list)

1 No damages --

03.12.13 Guimbitayan Primary School D2Rosalie Escala

situated on Malapasqua Island 30 M. Casanova

Dep.-Ed bldg. 2004 1 No damages, roof in bad condition 300’000

Dep.-Ed bldg. 2000 2 ~60% roof sheets damaged, replacement, repair windows

600’000

Dep.-Ed bldg. 1995 2 1 room almost completely destroyed, remains to be demolished, repair difficult1 room roof sheets incl. wooden structure destroyed, repairs/ replacement,

600’000

GWEN bldg. 2010 (not on list)

1 Half roof incl. steel structure damaged, replacement, ceiling panels damages, to be replaced

???

School Stage (not on list) Roof and back part collapsed, to be rebuilt

28.11.13 Daanbantayan National High School HSChester S- Rosalejos

31 M. Casanova

Main Building ~1998(2 storey)

10/ 20

2nd floor (10 rooms, 3 staircase, corridor) affected, everywhere new roof sheets and susp. ceiling, 7 rooms steel purlins destroyed, 4 rooms steel trusses destroyed, repairs windows, wiring, damages on concrete slab bdue to earthquake

4’000’000

2nd Main bldg. ~1997 8 Repairs on roof, ceiling and ???

Page 11 of 20

Page 12: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

(2 storey, not on list) windows

Annex A bldg. ~1985 4 Most roof sheets blown off, in 1 room roof incl. wooden structure totally destroyed, wooden façade and gable wall damaged, difficult to repair (weak timber structure)

2’400’000

Annex B bldg. ~1998 4 Minor repairs ceiling, windows 1’600’000

Library bldg. ~1998(not on list)

3 No damages --

Canteen ~1995 1 Roof repairs ???

School Stage Roof repair, structural cracks in concrete pillars

???

28.11.13 Tapilon National High School HSSerila Monleion

32 M. Casanova

PTA bldg. ~1996 5 ~50% roof sheets, purlins and ceiling damaged, repair wooden trusses, new ceiling

2’000’000

DPWH bldg. ~1998 2 Roof repairs, partial replacement roof sheets

800’000

GWEN bldg. 2010 2 Roof sheets / purlins blown off, replacement, 1 steel truss damaged, new ceiling and light partition wall

1’600’000

Dep.-Ed bldg. A 2012 2 Roof damage by fallen tree, other minor roof repairs

800’000

Dep.-Ed bldg. B 1999 2 Roof repairs on back side (sheets, wooden structure, ceiling)

800’000

Dep.-Ed bldg. C 1999 2 I room with wall cracks due to earthquake, otherwise ok

800’000

Dep.-Ed bldg. D 1999 1 Wall cracks due to earthquake, otherwise ok

400’000

PTA bldg. / Principal Office 1996

1 Roof incl. wooden structure, ceiling and partition wall totally destroyed, replacement, repairs door, walls, wiring

800’000

School Stage Almost completely collapsed, remains (concrete pillars) to be demolish, replacement

400’000

28.11.13 Paypay National High School HSJimmy Sueca

33 M. Casanova

DPWH bldg. 2003 2 Roof incl. wooden structure almost completely destroyed, repair ceiling, windows, wiring, wall cracks due to earthquake

800’000

PTA bldg. 1 Under construction, new roof incl. structure blown off, (no ceiling and windows)

400’000

School Stage Totally collapsed, to be rebuilt 400’000

Page 12 of 20

Page 13: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Marcos Type bldg. ~1981 (not on list)

3 No damages --

Dep.-Ed + Municipal donated bldg. + Library(3 bldg., not on list)

No damages --

Toilet 2013 (not on list) Half roof damaged by fallen tree ???

28.11.13 Malingin National High School HSEstrella Dublin

34 M. Casanova

Congressman Salimbangon bldg. 2009

2 Roof incl. steel structure along front façade collapsed, replace-ment, repairs windows, ceiling

800’000

Dep.-Ed bldg. 2004 1 ~25% roof sheets to be replaced, repair ceiling

400’000

Municipal bldg. 1996 3 ~20% roof sheets and wooden purlins to be replaced, no ceiling

1’200’000

La Tondeña bldg. 1998 2 ~80% roof sheets and wooden purlins damaged,, new ceiling, repairs windows, wiring

1’600’000

Big Foot bldg. 2000 1 Roof sheets blown off, replacement

800’000

School Stage 2006(not on list)

Steel structure (incl. steel posts) collapsed, to be rebuilt

28.11.13 SK Luis P. Canete Sr. National High School HSWilma de la Pena

Barangay Bagay 35 M. Casanova

Gwen bldg. 2009 2 Roof incl. steel structure and thermo insulation (15mm) destroyed, only 2 trusses remaining, replacement, repair light partition wall

800’000

DPWH bldg. ~1998 1 Almost all roof sheets and wooden purlin blown off / damaged, replacement, repair wooden trusses, ceiling

400’000

LGU bldg. 2006(attached to bldg. below)

2 ~20% roof sheets to be replaced, steel roof structure partially damaged, repair / replacement profiles, no ceiling

800’000

LGU bldg. 1997 2 No damages --

LED bldg. 2008 2 ~10% roof sheets to be replaced, repair ceiling along eaves

5’000

School Stage Back wall collapsed, no roof 400’000

28.11.13 Calape National High School HSElmer Baldes Pinosa

36 M. Casanova

Demountable bldg. 1996 3 Totally collapsed, to be rebuilt 2’400’000

Bagong Lipunan A bldg. 2 Totally collapsed (except parapet), 2’400’000

Page 13 of 20

Page 14: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

1988 to be rebuilt

Bagong Lipunan B bldg. 1987

3 1 room totally collapsed, to be rebuilt, 2 rooms roof incl. steel structure completely destroyed (new roof 2008), a lot of damages (floor cracks, partition wall, ceiling, wiring), difficult to repair

2’400’000

Annex bldg. 12 Not existing 4’800’000

School Nursery 1 50’000

School Stage and gate Roof incl. steel structure and back wall (brick) collapsed, to be rebuiltGate not part of assessment

450’000

Toilet bldg. (not on list) Already repaired --

SPHERE bldg. 2013 (2 storey, not on list)

4 ~25% of roof sheets to be replaced, repair ceiling

???

Dep.-Ed bldg. 1996(not on list)

2 No damages ???

Dep.-Ed bldg. 1996(not on list)

2 No damages, but in very bad condition, already prosed for demolition

???

BEFF bldg. 2010(not on list)

1 ~20% of roof sheets and 30% of gutter to be replaced

???

LGU bldg. 2005 / Bagong Lipunan bldg. 2001 (one bldg.), (not on list)

1+2 Replacement of ~30% of gutter, repair ceiling

???

US Aid bldg. 1987 (not on list)

3 Damages on roof already repaired, repair ceiling

???

Dep.-Ed bldg. 2008(not on list)

2 Some roof sheets to be replaced ???

SPHERE bldg. 2012(not on list)

2 Roof of small annex incl. steel structure blown off, replacement, some roof repairs incl. ceiling

???

Dep.-Ed bldg. 1995(not on list)

2 Damages on roof already repaired, repair ceiling

???

29.11.13 Carnaza National High School HS situated on Carnaza IslandRafael Beloria (Principal) and Tony Aplaladon (District Supervisor)

37 M. Casanova

LGO bldg. 2001 4 Minor roof damages mainly on fascia board

???

Dep.-Ed bldg. 2012 1 Roof incl. roof structure blown off, upper gable walls collapsed, replacement, bearing structure (concrete pillars/ring beams) ok

???

LGO bldg. ~2004 1 Minor roof repairs ???

Dep.-Ed bldg. 2010 1 No damages by typhoon, but serious cracks on concrete pillars/walls due to earthquake

???

Page 14 of 20

Page 15: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

02.12.13 Maya National High School HSEva A.Casinillo

38 M. Casanova

Ramos bldg. ~1992 3 Front and back façades (steel panels), parapet (brick), windows, doors and ceiling in 2 rooms collapsed, bearing steel structure (posts/roof) ok, partition walls damaged, repairs on roof sheets and in 3rd room

2’400’000

Ong King King bldg. 1989 2 Structural wall cracks, minor roof and ceiling repairs

800’000

Bagong Lipunan bldg. 1988 rehab 2 rooms 2013

3 Roof sheets rehab rooms blown off, replacement, non rehab room totally collapsed

2’400’000

Ramos bldg. ~1992 2 ~50% roof sheets blown off, gable and back façade and partition wall partially damaged, ceiling totally collapsed, repair windows, steel structure (posts/roof) ok

1’600’000

DPWH bldg. 1995 2 Serious structural cracks due to earthquake, difficult to repair

1’600’000

SEDP bldg. 1993 8 Minor roof repairs, roof on backside damaged by fallen tree

500’000(?)

New bldg. 2013, ready for inauguration (2 storey)

4 Roof sheets blown off, ceiling on upper floor totally damaged, repairs windows, wiring

800’000

big foot bldg. 1994 1 Minor roof and ceiling repairs 100’000

School Stage 1998 (not on list)

Totally collapsed, to be rebuilt ???

02.12.13 Tominjao National High School HSRisalino Rosell

39 M. Casanova

PTA bldg. 1998 4 Roof incl. wooden structure, ceiling and inner aluminium doors, totally destroyed, replacement, repairs windows, wiring

1’600’000

Main building 1999 6 No damages --

Annex bldg. 2010 (under rehabilitation)

1 Roof sheets incl. wooden structure almost completely destroyed (2 wooden trusses left), rehabilitated parts ok, works can be continued

400’000

GWEN bldg. 2012 2 ~60% roof sheets incl. thermo insulation (15mm) blown off, replacement

800’000

School nursery 2011 1 Light structure on concrete foundation totally collapsed, only Tool Room (brick walls) remaining

100’000

School Stage Roof sheets incl. wooden structure blown off, replacement

200’000

Congressman Salimbangon bldg. 2008 (not on list)

2 Minor roof and ceiling repairs, some wall cracks due to earthquake

???

Page 15 of 20

Page 16: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

SSG bldg. 2009(not on list)

1 No damages __

Dep.-Ed bldg. 2006(not on list)

1 Roof repairs incl. wooden purlins and ceiling on backside

???

03.12.13 Logon National High School HSBenjie Ano-Os

situated on Malapasqua Island 40 M. Casanova

Provincial bldg. ~2004 2 Roof and ceiling damages already repaired

800’000

Library bldg. 2012 1 Roof damages already repaired 800’000

Mariquita bldg. ~1995 3 1 room ceiling totally destroyed, replacement

800’000(?)

Provincial LGU bldg. 2002

2 Damaged rusty gutter/fascia board to be repaired

800’000(?)

Municipal 1 bldg. 2001 attached to LGU

2 Some damages on roof/gutter ???

Municipal 2 bldg. 2001attached to Municipal 1

2 Damaged rusty gutter/fascia board to be repaired

???

School Stage Almost totally collapsed, 4 pillars remaining, to be rebuilt

???

03.12.13 Bakhawan National High School HSConde Ruel

41 M. Casanova

PTA bldg. 1994 1 roof sheets incl. wooden structure collapsed, walls (brick) unstable, to be demolished and rebuilt

???

Ramos bldg. 1994 2 Gable façade (steel panels) damaged, wall cracks in parapet

???

DPWH bldg. 1993 1 No damages --

Municipal bldg. 1992 1 Roof sheets completely destroyed but already repaired (recycled sheets), repair ceiling

???

Annex 1995 (not on list)attached to DPWH

1 ~20% roof sheets blown off, repairs on wooden purlins/trusses

???

School Stage Roof completely destroyed, back wall unstable / to be demolished, to be rebuilt (only 2 concrete pillars remaining

???

Dep.-Ed bldg. 1997 3 Rusty gutter front façade blown off, no other damages, bldg. in bad condition (rust/termites)

???

DPWH bldg. 1993(not on list)

~60% roof sheets blown off, replacement, heavy damages on steel roof structure along front eave, repair windows

???

Page 16 of 20

Page 17: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

03.12.13 Bateria National High School HSEdgar Djamos

42 M. Casanova

LGU/PTA bldg. 1996 6 Roof incl. wooden structure, ceiling and 2 light partition walls completely destroyed, replace-ment, wall cracks, repair windows

500’000(?)

Stock Room bldg. (small)(not on list)

1 Makeshift structure / brick parapet collapsed, replacement

???

LGU bldg. 1998 2 Half partition wall collapsed, gutter/fascia board along backside destroyed, timber structures affected by termites

290’000(?)

E-GWEN bldg. 2005 2 Small part roof/gutter and ceiling damaged, partially to be replaced, timber structures affected by termites, roof steel structure insulated (15mm) ok

250’000

SPHERE bldg. 2008 2 Minor roof damages, temporarily repaired by parents

200’000(?)

DPWH bldg. 2013 (2 storey, not on list)

4 ~60% roof sheets damaged, gutter totally damaged, replacement, roof steel structure and ceiling eave along backside completely destroyed, big repair

???

School Stage 2013 Roof incl. steel structure and 1 concrete pillar collapsed, back wall damaged, most remains to be demolished, repair difficult

270’000

General remarks:We have assessed all public elementary/primary schools (30) and national high schools (12) in Daanbantayan Municipality, according to the lists we received from the municipal authorities.Total no. of students in Daanbantayan Municipality:Elementary/primary schools District 1: 6’190Elementary/primary schools District 2: 7’435National high schools 6’449Grand total 20’074

Classrooms generally have one attached toilet unitClassroom surface around 40-50m2Many buildings have damages dating from the 15.10.2013 earthquakeSteel structures often heavily affected by rustWooden buildings often affected by termites (aigay ay)

Page 17 of 20

Page 18: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Main building types identified during the assessment:

Type 1Structure: steel (walls and roof)Fillings : hollow blocks, plastered (parapets and gable walls)Roof : steel rafters and purlins, metal sheets

Type 2Base: parapet of masonry in hollow blocksWalls: timber structure on parapetRoof: timber trusses and purlins, metal sheets

Type 3Structure: reinforced concrete pillars and top ring beamFillings : hollow blocks, plastered (walls and gable walls)Roof : timber/steel trusses and purlins, metal sheets

Type 4Structure: reinforced concrete pillars (15x30 cm, 2 rebars) and non bearing concrete wallsRoof: steel trusses, metal sheets

Remark: wrong structural system

Page 18 of 20

Page 19: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Type 5Structure: reinforced concrete pillarsFillings : hollow blocks, plastered (walls and gable walls)Roof : timber/steel trusses and purlins, metal sheets

Type 6Structure: reinforced concrete pillarsFilling: hollow blocks up to lintel level, plasterVentilation gap above hollow blocksRoof: steel trusses and purlins, metal sheets

Type 7Structure: steel posts on concrete foundationFillings : parapets hollow blocks, plastered, above metal sheet panelsRoof : steel rafters and purlins, metal sheets

Page 19 of 20

Page 20: SitRep Yangon - HumanitarianResponse · Web viewLucio Tan bldg. 1982 attached to Lucio Tan 1 Roof incl. wooden purlins blown off, trusses damaged, ceiling totally destroyed, repairs

Type 8Building with historical valueStructure: concrete foundation, reinforced concrete ring beam and pillarsFloors: woodInner partitions : woodRoof: timber trusses and purlins, metal sheets

Type 9Foundations : noneStructure: light timber or bambooInfill: light organic or metal sheetingRoof: timber structure, light organic or metal sheeting

Page 20 of 20