14
SPACE LAUNCH SYSTEM National Aeronautics and Space Administration www.nasa.gov/sls 5 . . . 4 . . . 3 . . . 2 . . . 1 . . . A NEW CAPABILITY FOR DISCOVERY Steve Creech NASA Space Launch System October 13, 2017 https://ntrs.nasa.gov/search.jsp?R=20170012405 2018-07-09T17:44:59+00:00Z
Transcript
Page 1: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

SPACE LAUNCH SYSTEM

National Aeronautics and Space Administration

www.nasa.gov/sls

5 . . . 4 . . . 3 . . . 2 . . . 1 . . .

A NEW CAPABILITY FOR DISCOVERY

Steve CreechNASA Space Launch System

October 13, 2017

https://ntrs.nasa.gov/search.jsp?R=20170012405 2018-07-09T17:44:59+00:00Z

Page 2: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLS CAPABILITY AVAILABILITYSLS Block 1As Early As 2019

Provides

Initial Heavy-LiftCapability

Enables

Orion Test

SmallSats to Deep Space

SLS Block 1B CrewAs Early As 2022

Provides

105 t lift capability via Exploration Upper Stage

Co-manifested payload capability in Universal Stage Adapter

Enables

Deep Space Gateway

Larger CubeSat-and ESPA-Class Payloads

SLS Block 1B CargoAs Early As 2022

Provides

8.4-meter fairings for primary payloads

Enables

Europa Clipper/Lander

Deep Space Transport

Ice or Ocean Worlds Missions

Large-Aperture Space Telescopes

SLS Block 2As Early As 2028

Provides

130 t lift capability via advanced boosters

10-meter fairings for primary payloads

Enables

Crewed Mars Orbit Missions

Crewed Mars Surface Missions

0368.2

Page 3: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

A PHASED APPROACH TO HUMAN SPACEFLIGHTSLS PLAYS A KEY ROLE INTO THE 2030s

Using the International

Space Station

Operating in the Lunar Vicinity (proving ground)

After 2030Leaving the Earth-Moon System and Reaching

Mars Orbit

Now

2020s

Phase 0

Continue research and testing on ISS to solve exploration challenges. Evaluate potential for lunar resources. Develop standards.

Phase 1

Begin missions in cislunar space. Build Deep Space Gateway. Initiate assembly of Deep Space Transport.

Phase 2

Complete Deep Space Transport and conduct yearlong Mars simulation mission.

Phases 3 and 4

Begin sustained crew expeditions to Martian system and surface of Mars.

0368.3

Page 4: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

BOOSTER PROGRESS

0368.4

Page 5: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

CORE STAGE PROGRESS

0368.5

Page 6: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

ENGINE PROGRESS

0368.6

Page 7: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

IN-SPACE STAGE AND ADAPTER PROGRESS

0368.7

Page 8: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLSBlock1 SLSBlock1B

ISPE

Orion

Core

Orion

ISPE

EUS

MSA

LVSA

ICPS

TestFlight• ICPS(D-IVderived)• 13xSPL

Crew• EUS(new)• USA&PAF(new)• 1xCPL- (e.g.,PowerSEPBus)

• 14xSPL- (e.g.,10x6U;2x12U;2x27U)

USA

CPL

SPL(≤27U)

PLA

Cargo• EUS• PLF(new)• 1xPPL- (e.g.,7.2mHabitat)

8.4mPLF

PPL

PLASPL(6U)

Notes: ISPE – Integrated Spacecraft Payload Element SPL – Secondary Payload MSA– MPCV Stage Adapter ICPS – Integrated Cryogenic Propulsion Stage LVSA – Launch Vehicle Stage Adapter EUS – Exploration Upper Stage USA – Universal Stage Adapter CPL – Co-manifested Payload PLA – Payload Adapter PLF - Payload Fairing PPL – Primary Payload

ISPE Separation Plane

SLS SPACECRAFT/PAYLOAD INTEGRATION & EVOLUTION (SPIE)

ISPE HARDWARE DEVELOPMENT & PAYLOAD INTEGRATION FOR SLS MISSIONS

0376.8

EUS

ISPE

Page 9: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLS TIME TO DESTINATIONEuropa Clipper – Desired launch date of June 2022– Jovian system transit time reduced by 65% over

existing launch vehicles– Reduced mission operations cost over time

Earliest Launch

*Period: 6/4/22 – 6/24/22 (SLS)*Period: 6/18/22 – 7/8/22 (Atlas)

Cruise:2.5 Years (SLS)

7.4 Years (Atlas)

Jupiter Orbit Insertion12/24/24 or 5/1/25 (SLS)

11/26/29 (Atlas)

Jovian System OperationsPrime Europa Flyby

Campaign: 36 months

Launch (6/5/22)

JOI (5/23/24)

DSM (7/10/22)

VGA (5/14/22)

EGA-2 (10/24/5)

EGA-1 (10/24/23)

Jupiter�s Orbit

JOI (4/4/28)

Launch (11/21/21)

C3=15 km2/s2 C3=82 km2/s2

2 Earth Flybys0 Earth Flybys

Current LVs SLS

0

10

20

30

40

50

60

70

80

-20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

UsefulPa

yloadSy

stem

Mass(t)

CharacteristicEnergy,C3(km2/s2)

SLSBlock1B:8.4mx27.4mFairing

SLSBlock2SRB:8.4mx27.4mFairing

SLSBlock1B:Crew

SLSBlock2SRB:Crew

Jupiter/Europa

Saturn via JGA

Saturn/UranusDirect

CurrentLaunchVehicles

Mars

Lunar

0368.9

Page 10: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLS PAYLOAD VOLUME

total mission volume = ~

Orion with short-duration hab module

30’ tall x 27.6’ dia

400m3

5m fairing w/ science payload

250m3

8m fairing with large aperture telescope

1,200m3

10m fairing w/notional Mars payload

1,800m3

Science Missions

400m3

• Potential opportunities exist for launch of a 5m fairing on the Block 1 configuration of SLS

• Universal Stage Adapter offers opportunity for co-manifested payloads with Orion spacecraft or near-term 8.4-meter lower-height accommodations

FAIRING AVAILABILITY

• Universal Stage Adapter accommodations early as soon as second flight of SLS; 8.4- and 10-meter fairings available as needed.

Page 11: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLS SECONDARY PAYLOAD EVOLUTION

0352 FISO_Creech.11

Page 12: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

www.nasa.gov/sls

SLS MASS TO DESTINATION

• Up to 5 times greater mass to orbit capability than current launch systems– Increases payload mass margins – Offers range of injection propulsion options

• New Horizons– SLS would have doubled delivered payload

mass to Pluto

• Europa Lander– 16 mT delivery to outer planets (with margin)

New Horizons

Europa Lander

SLS (Initial) Saturn V SLS (Evolved)Current LV Max

Payload Lift Comparison

0368.12

Page 13: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

0361.13

Page 14: SPACE LAUNCH SYSTEM - NASA SLS CAPABILITY AVAILABILITY SLS Block 1 As Early As 2019 Provides Initial Heavy-Lift Capability Enables Orion Test SmallSatsto Deep Space SLS Block 1B Crew

0362


Recommended