SPP 4m Magnetometer Boom Proposal
Paul Turin10/17/12
Design Drivers/Choices• Scientists want 4m length for acceptable mag separation
– Must stow within bus panel length• Three segment boom only articulated choice that will fit on deck with imposed constraints
• Minimize mass– CF tubes for light weight, stiffness, low thermal bending– Aluminum components for low mass, ease of fabrication
• Two-point mounting on bus– Simplifies interface, low mass
• Assume deployed 1st mode >.5Hz for ACS stability• Minimize SC resources: single point release, no heaters for simplicity, reliability• Couple hinge rotations to sequence deployment for safety
– Provide coordinated segment sequencing – all arms deploy at proportional rates– Eliminate chance of bus strike with hung joint
• Joint drive redundancy– Increase force on any hung joint
• Zero play hinges for no deadband • Full-compliment duplex angular contact bearings for zero play, high load capacity• Torsion spring deployment springs
– Reasonable T0-T1 ratio – Light weight, compact, simple– Nonmagnetic in Elgiloy
• Spring load against stops at EOT – no latching for simplicity, reliability• Wide deployment and operational temp range• Flyweight brake speed control: no heaters req’d, low mass
Boom Deployed
Boom lies on SC centerline1m between mags, 2m to first FGM
Stowed on Bus
4m fits easily
Joints Stowed
Elbow/EndShoulder\Wrist
Stow Preload Braces
• Braces mounted to center tube are larger than spacing of stowed tubes
• Outer tubes are bowed to provide preload to couple tubes for greater combined stiffness. Raises 1st mode 10Hz
• Spreads FGM loads across tubes• Consil SC pads between tubes
and brace for cushioning and damping (electrically conductive)
Brace SC-Consil Cushions
Kickoff SpringsAll joints have kickoff springs to provide high initial deployment forces until components start moving. Provides protection against sticking surfaces etc. while keeping joint drive torsions springs reasonably sized.
544 bronze plungers running in hard anodized bores, compression springs between pairs
Joints Deployed
Shoulder
Wrist
Elbow
Hinge Design
• Hinge designed for zero play, low friction
• Zero play bearing cartridges• Aluminum axle, clamped to
bearings and yokes for zero play
• Vespel SP3 idler rollers for low torsion spring coil drag
• Elgiloy springs – nonmagnetic, high yield (post-forming etching required to remove magnetic oxide layer)
Bearing Cartridge• Bushings don’t cut it -- .001” bushing radial clearance
= .320” @ end of boom w/3 hinges• Utilize ZrO2 full ceramic, full-compliment, angular
contact duplex pair bearings• Ground for precise preload, zero radial/axial play
when inner and outer faces are pressed together• Ti housing with nut to provide preload – no shimming
needed• ZrO2 and Ti have Very close CTE – zero play, constant
preload across wide temp range (.0001” delta over 100C)
• No lubrication required for low speed ceramic bearings – no added drag from grease at low temps
• Post-deployment loads negligible• 600% margin on launch loads• 30% lower mass than steel• 50% stiffer than steel
Stowing, Deployment Initiation
Cage spring
Stow cage
FC-4 Frangibolt
Wrist kickoff
plunger
Elbow kickoff
plunger Kickoff plungers extended
Stow tower
Ears support end
in cage
Uncaging of Wrist
Roller is caged in slot on
shoulderShoulder-
wrist kickoff
plunger
Shoulder kickoff
plunger
Deployment Control/Assist Cords• Motion of arms needs to be coordinated well enough to prevent bus strikes• This can be done by “drafting arm” style control cords• Pulleys fixed to shoulder and arm ends, connected by one set of cords (red),
synchronize arm movement• Second set of cords (green) are passive until a hinge slows down due to a problem,
then applies torque of all hinge springs (3X) to that hinge. Prevents one arm from getting ahead of any other.
• Allows one brake to control deployment rate of all segments – significant mass savings• A tech note is available with a detailed explanation of this operation and the forces
involved
Deployment Control Cord
Pulley fixed to shoulder
Deployment rate of
shoulder controlled by
brake
Pulley fixed to end of
middle arm
Cord pays out as shoulder rotates
Rotation of middle tube controlled by cord-payout rate
from shoulder
Deployment Assist Cord
Cord pulls in as shoulder rotates
Assist cords do nothing during normal deployment. If a hinge hangs up, torque of all hinge springs is transferred to stuck
joint. Deployment is now governed by stuck joint. This puts triple the torque on that
joint.
Control cords• Several fiber types will do, currently looking at braided
Spectra (Honeywell product, UHMW Polyethylene)• Low stretch, high stiffness, high strength• 500# test = 1.2g/m .053” dia. Sees 11lb static load.
Much stronger than needed – choose size for ease of handling
• Hollow braid allows loop splice, provides high percentage of line strength, works well with bobbins for termination
• Meets outgassing with bakeout• Lines are slightly slack at EOT – do not affect positioning
Flyweight Brake• Same basic design as used on FIELDS antennas• Lower gear ratio for faster speed – target 5 rpm• Planetary gearbox and weighted, sprung brake shoes for low starting
torque, V2 speed control • Smaller, lighter 2nd generation version has been completed. Fewer stages,
lower mass, lower starting torque, meets target speed. • “Watchmaker’s” version under development for further weight reduction
Misc. Design Calcs
• 1.94kg mass (not including mags, harnesses)• 4.3kg with all (assume 3” harness loops at hinges)• Maneuvering torque on boom 2.5 inlb• Maneuvering unseat torque ratio 3.8• Maneuvering load on worst-case bearing 2.9lb• 100g launch load on bearing 133 lb• Bearing capacity 936 lb• Bearing SF 9.3
Deployed Modal Analysis
Stowed Modal Analysis
Includes same masses as deployed analysis
Glue Joint Design
• Hysol 9309 structural epoxy, MJ55 to alodined Al
• Undercut sleeves, injected glue with bleed holes– for tube centering and
bondline control, uniform fill• Same design as STEREO• Joint design qualified to
35K on 8” dia• 8 joints on STEREO, 30 on
THEMIS no issuesCavity for
glue
Longer Boom
There is room on the bus to easily increase the boom length to at least 4.5m.
Only 82g mass increase
Further analysis is needed to look at effect on modes, but probably not an issue.
To Do• Look at kickoff plunger loads on flyweight brake• Look at stowed loads in more detail• Harness routing – how to hold loops• Harness stiffness – measure at cold predicts• Torsion spring adjustments as necessary• Torsion spring termination