    Substation & Feeder Management for

    Optimizing Revenue Substation is the Control Centre of O & M

    of a Distribution System

    It is like the Brain of the Central Nervous System

  • 8/4/2019 SS & Feeder Management

    2/23

    Substation & Feeder Management for

    Optimizing RevenueFunctions of Distribution Substations-

    Substations are designed to accomplish the following functions, although notall substations have all these functions:

    Change voltage from one level to another

    Regulate voltage to compensate for system voltage changes

    Switch transmission and distribution circuits into and out of the grid system

    Measure electric power qualities flowing in the circuits

    Connect communication signals to the circuits

    Eliminate lightning and other electrical surges from the system

    Connect electric generation plants to the system

    Make interconnections between the electric systems of more than one utility

    Control reactive kilovolt-amperes supplied to and the flow of reactivekilovolt-amperes in the circuits

  • 8/4/2019 SS & Feeder Management

    3/23

    Substation & Feeder Management for

    Optimizing Revenue

    In a Distribution Network, Substations are

    of 2 Types-

    Power (Trf) Substations

    Distribution (Trf) Substations

  • 8/4/2019 SS & Feeder Management

    4/23

    Substation & Feeder Management forOptimizing Revenue Power Transformers-

    Generally 33/11 KV

    Capacity (MVA)- 1.6, 3.15, 5, 8

    Location- Ideally, Power transformers should belocated at places with the following factors intoconsideration-Line Loss in 33 KV Feeders is Minimum

    Line Loss in 11 KV Feeders is Minimum

    Power Supply Quality (Voltage) is maintained

  • 8/4/2019 SS & Feeder Management

    5/23

    Substation & Feeder Management for

    Optimizing Revenue Distribution Transformers-

    Generally 33/11 KV

    Capacity (KVA)-

    Single Phase- 10,16

    Three Phase- 25,63,100,250,315,500

    Location- Ideally, DTRs should be located at places with thefollowing factors into consideration-

    Line Loss in 11 KV Feeders is Minimum

    Line Loss in LT Line is Minimum

    Power Supply Quality (Voltage) is maintained

  • 8/4/2019 SS & Feeder Management

    6/23

    Revenues can be optimized by way of proper

    Feeder and Substation Management

    In case of high loss making feeders the priority

    may be given in load shedding while handlingpower shortage

    Reorientation of feeders, substations and

    upgradation can further help improving

    revenues Installation of proper capacity of capacitors

    In ABT(Availability Base Tariff) regime, by

    managing feeder/ substation load, revenue

    can be im roved

    Optimisation of revenue- through feederand substation management

  • 8/4/2019 SS & Feeder Management

    7/23

    Optimisation of Revenue- reduction nof reading

    inaccuracies-AMR APPLICATION SERVER

    AMR Metering Management Server

    Central Metering DatabaseManagement Application

    Billing Software Integration Module

    Metering Network Configuration

    Module

  • 8/4/2019 SS & Feeder Management

    8/23

    PUBLIC NETWORK OPTIONS FOR

    UTILITIES

    GSM/GPRS/CDMA/Radio Solutions for UtilityApplications

    Providing GSM/GPRS/CDMA/Radio basedcommunication solutions to the utility industry endusers and OEM's to benefit from this technology intheir electrical networks, SCADA systems and formetering.

  • 8/4/2019 SS & Feeder Management

    9/23

    DATA EXPLOITATION

    Energy Management Software which canread meters in a sub-station and provide

    various reports

    Energy Monitoring Suite which provides,

    reporting, trending, trading, analysis, etc.

    Energy Trading and Enterprise Optimization

    Software Solutions

    Integration Capabilities to work tools likeCyme etc., for network modlling, voltage

    studies, etc.,

    Customized Solutions based on customers

    specification

  • 8/4/2019 SS & Feeder Management

    10/23

    WORK PLAN

    ENERGY MANAGEMENT

    MEANS LOWERING COST BY

    ELIMINATING UNNECESSARY ENERGY USE

    IMPROVING THEEFFICIENCY OF NEEDED ENERGY USE

    BUYINGENERGY AT LOWERNET PRICES

    ADJUSTING OPERATIONS TO ALLOW PURCHASINGENERGYAT LOWERPRICES

  • 8/4/2019 SS & Feeder Management

    11/23

    Substation & Feeder Management forOptimizing Revenue Feeders in a Distribution System

    33 KV

    11 KVLT Line

  • 8/4/2019 SS & Feeder Management

    12/23

    Substation & Feeder Management for

    Optimizing Revenue 33 KV Feeders in a Distribution System

    This is the level of Voltage at which Discoms buy Power fromGRIDCO

    Mixed Load

    33 KV Feeders Dedicated FeederIndustrial Feeder

    For Carrying out Energy Accounting & Audit, Metering of 33 KV Feedersat the Grid Substation, at incoming side of 33/11 KV Substations andall 33 KV Consumers is a must.

  • 8/4/2019 SS & Feeder Management

    13/23

    Substation & Feeder Management for

    Optimizing Revenue 11 KV Feeders in a Distribution System

    11 KV Feeders emanate from 33/11 KV Power Substations

    Mixed Load

    11 KV Feeders Dedicated Feeder

    Industrial Feeder

    For Carrying out Energy Accounting & Audit, Metering of 11 KV Feedersat the source of 11 KV Feeders at 33/11 KV Substation and at all theDTRs and 11 KV Consumers is a must.

  • 8/4/2019 SS & Feeder Management

    14/23

    Substation & Feeder Management for

    Optimizing Revenue LT Lines in a Distribution System

    LT Lines emanate from 11/0.4 KV Distribution

    Substations

    For Carrying out Energy Accounting & Audit of LT

    Lines, Metering at the source of LT Line and

    Consumers is a must.

  • 8/4/2019 SS & Feeder Management

    15/23

    Substation & Feeder Management for

    Optimizing RevenueSTEP-I

    For Optimum Revenue Realization we need to know the Substations(Power & Distribution) & Feeders (33 KV, 11 KV, LT Lines) where theAT&C Losses are high.

    STEP-II

    The AT&C Losses should be bifurcated into Technical Losses andCommercial Losses.

  • 8/4/2019 SS & Feeder Management

    16/23

    Substation & Feeder Management for

    Optimizing Revenue

    STEP-II

    For Improving Technical Losses-Focus on Improvement in Billing

    By Reduction of Theft in HT Consumers

    Strengthening MRT, Conducting Raids, Repeated Checking, Strict actionagainst Dishonest Consumers.

    By Reduction of Theft in LT Consumers

    By Strengthening Vigilance Wing, Conducting raids, Load Surveys, Strict actionagainst Dishonest Consumers

    By Monitoring of Spot Billing activities

    Focus on Improvement in T&D LossesBy Reduction of Line Losses in 33 KV &11 KV Feeders and LT Lines

    Reduction of Transformer Losses in 33/11 KV Trfs and in DTRs.

  • 8/4/2019 SS & Feeder Management

    17/23

    Substation & Feeder Management forOptimizing RevenueSTEP-II

    For Improving Commercial Losses-Focus on Improvement in Revenue RealisationBy Opening up Multiple Payment Options

    Provision for Payment of Bills through Internet, ATM Counters,Franchisee Counters, Customer Care Counters, etc.

    By Proactively sorting out Billing & Collection related grievances ofConsumers.

    Bill Revisions

    Arrear Collection

  • 8/4/2019 SS & Feeder Management

    18/23

    Substation & Feeder Management for

    Optimizing Revenue

    Information in terms of Details of

    Consumers & Load Flows

    Need to be tagged to LT Lines, DTRs, 11 KV Lines, 33/11 KVSubstations, 33 KV Lines and Input Points.

  • 8/4/2019 SS & Feeder Management

    19/23

    Substation & Feeder Management for

    Optimizing RevenueIT Systems are available for Real-Time Visibility and Operation of Substations.

    Such Systems can be Tailored to adapt to Distribution System Network for Trackingof Exceptional Events like Failures of Lines & Equipments & Overloads.

    With Increased Visibility of System Network and Remote Operation facilities, wecan design the system such that in High Revenue fetching areas the power supplyquality is the best.

    Decision with regard to operation of lines can be Programmed in a preset PriorityBasis such that the Power Supply can be restored in minimum possible time for

    areas which have Low Losses and High Revenue Potential.

  • 8/4/2019 SS & Feeder Management

    20/23

    Substation & Feeder Management forOptimizing Revenue

    With Implementation of The Distribution Automation Systems theConsumer Satisfaction will increase which in turn shall result in

    Increased Revenue Realisation

  • 8/4/2019 SS & Feeder Management

    21/23

    WAY FORWARD

    Commitment of top leadership

    Organisational Restructuring Clear

    responsibilities and accountability

    Feeder Managers

    Improvement in Infrastructure especially inCESU

    Cultural issues to be addressed

    Development of a IT system - database and its

    upkeep Capacity Development

    Development of procedure and training manuals

    Training of personnel

  • 8/4/2019 SS & Feeder Management

    22/23

    SUSTAINABILITY

    Linking the Energy

    Audit Module with Billing

    Databases for

    continuous monitoring

    Maintaining the data

    quality

    Prepare an

    operational model

    Consistency of

    systems for access

    and extract data

    from any sources

  • 8/4/2019 SS & Feeder Management

    23/23