+ All Categories
Home > Documents > Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf ·...

Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf ·...

Date post: 20-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
9
Status of JCM in Mongolia and JFJCM project 8 December 2015 Ryuzo Sugimoto Fund Manager of JFJCM Asian Development Bank
Transcript
Page 1: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

Status of JCM in Mongolia and JFJCM project

8  December  2015      

Ryuzo  Sugimoto  Fund  Manager  of  JFJCM  Asian  Development  Bank  

Page 2: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

•  JCM  in  Mongolia  •  Energy  Efficiency  and  Urban  Environment  Improvement  Project    

•  Subcomponent  of  the  project  approved  for  JFJCM    

2  

Outline

Page 3: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

JCM in Mongolia

•  Mongolia  is  the  first  to  launch  Joint  CrediHng  Mechnism  (JCM)  on  8  January  2013,  out  of  the  16  countries  that  signed  bilateral  agreements  with  the  Government  of  Japan  

3  

Page 4: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

•  Registered  projects  

•  Approved  methodologies  

Methodology  title Approval  date Replacement  and  Installation  of  High  Efficiency  Heat  Only  Boiler  (HOB)  for  Hot  Water  Supply  Systems

28  Jan  2015

Installation  of  energy-­‐saving  transmission  lines  in  the  Mongolian  Grid 20  Feb  2014  

JCM in Mongolia

Project  title Reg.  date

Emission  reduction

Project  Participants Mongolia Japan

Centralization  of  heat  supply  system  by  installation  of  high-­‐efficiency  Heat  Only  Boilers  in  Bornuur  soum  Project

30  Jun  2015

206  tCO2  p.a.  

Anu  Service  Co.,  Ltd.

Suuri-­‐Keikaku  Co.,  Ltd.

Installation  of  high-­‐efficiency  Heat  Only  Boilers  in  118th  School  of  Ulaanbaatar  City  Project

30  Jun  2015  

92  tCO2  p.a.

Anu  Service  Co.,  Ltd.

Suuri-­‐Keikaku  Co.,  Ltd.

Page 5: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

•  450  MW  of  new  CHP  plant  in  Ulaanbaatar  for  stable  power  and  heat  supply    

•  The  distribuHon  project  ($105  million)  will  fund  new  electricity  transmission  line  (80  km),  new  heat  transmission  line  (30  km),  and  distribuHon  network  rehabilitaHon  and  improvement.  

5  

Combined Heat and Power (CHP) Plant and the Project

Page 6: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

Subcomponent Approved for JFJCM

6  

House,  building,  factory  

Power  plant  

transmit distribute

ADB  Loan:  DNIMS  and  Other  OHL/SS  rehab.  

ADB Loan Grant

ADB  Loan  

DNIMS (Distribution Network Information Management System)

The Project JFJCM

Amorphous  Transformer  (AMT)  

JFJCM  grant:  Amorphous  Core  Transformer  

-­‐Advanced  Technology  -­‐Loss  reducHon  and  Energy  saving          

-­‐760  units  of  AMTs  will  be  installed  and  replace  aging  SITs  -­‐5,322  ton  of  annual  CO2  emission  reducHon  is  esHmated  for  35  years  

of  product  life  

Page 7: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

7  

•  widely  used  in  distribuHon  network  system  in  developed  countries  

•  Applies  “an  amorphous  core”  which  is  an  alloy  of  iron  with  boron,  silicon,  and  phosphorus  with  a  random  and  non-­‐crystalline  structure  in  the  form  of  thin  metal  

•  Improve  inductance  and  resistance  and  reduces  energy  loss  up  to  75%  in  non-­‐load  loss  and  21%  in  load  loss  

Technology on JFJCM project

hbps://www.jcm.go.jp/vn-­‐jp/methodologies/24/abached_document1  

Amorphous  Transformer  (AMT)    

Page 8: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

8  

•  life  cycle  cost  includes  iniHal  cost,  operaHon  and  maintenance  cost,  and  energy  loss  

•  Around  38%  of  total  cost  savings  throughout  its  enHre  life  (35  years)      

Amorphous Energy Efficient Transformer

Life  Cycle  Cost  Comparison  between  AMT  and  SIT  

Page 9: Status of JCM in Mongolia and JFJCM projectcopjapan.env.go.jp/cop/.../pdf/...presentation-03.pdf · Subcomponent Approved for JFJCM 6 House,"building,"factory" Powerplant& transmit

Thank you!


Recommended