Status of PhotovoltaicStatus of PhotovoltaicDeployment in Spain: TDeployment in Spain: TDeployment in Spain: TDeployment in Spain: T
José HerreJosé HerreCIEMCIEMCIEMCIEM
DepartmenDepartmenDivision of RenDivision of Ren
Ath E W k ’08
jjose.herreroose.herrero
Athens Energy Week ’08November November
c Industry, Market and c Industry, Market and The risk of the SuccessThe risk of the SuccessThe risk of the SuccessThe risk of the Success
ero Ruedaero RuedaMATMATMATMATt of Energyt of Energy
newable Energynewable Energy
8 Ph t lt i S i
[email protected]@ciemat.es
8: Photovoltaic Seminar12th, 200812th, 2008
M d idMadrid
TheThe EuroEuro
Annual Average: 1.430 kWh/kWp
opeanopean SunSun BeltBelt Athens
Annual Average: 1.350 kWh/kW
Photovoltaic Market in EuropePhotovoltaic Market in Europe
Accumulated PV Power in EUROPE 2007: 4,69 GAccumulated PV Power in EUROPE 2007: 4,69 G
1.541
3.148
Potencia AcumulaP t i I t l dAccumulated PV P
I t ll d PV PPotencia Instalad
¡¡ 33% of the total PV P¡¡ 33% of the total PV P
Installed PV Powe
¡¡ 33% of the total PV P¡¡ 33% of the total PV P
(Germany(Germany
Source: Euro
GWGW
1 MWp
MWp
ada en Europa hasta 2006E 2007
Power in Europe until 2006
i E d i 2007a en Europa en 2007
Power was installed 2007 !!Power was installed 2007 !!
er in Europe during 2007
Power was installed 2007 !!Power was installed 2007 !!
y and Spain)y and Spain)
opean Photovoltaic Industry Association
World Photovoltaic Market 2008*: 3 62 GWWorld Photovoltaic Market 2008*: 3 62 GW
Photovoltaic Market in SpainPhotovoltaic Market in Spain
World Photovoltaic Market 2008 : 3,62 GWWorld Photovoltaic Market 2008 : 3,62 GW
Spanish Market 2008*: 300 MWp*Spanish Market 2008*: 300 MWp*
Estimated figures*Estimated figures*
11--1,2 GW1,2 GW
1 6 G1 6 G1,6 G1,6 G,,Germany
41%ROWROW59%
European Photovoltaic MEuropean Photovoltaic M
WpWpWp.Wp.
France
Portugal1%
Resto UE0,5%
Greece1%
Italy7%
7%WpWp
GWGWSpain14%GWpGWppp
Germany70%
Market Distribution 2007Market Distribution 2007
Photovoltaic situation in Spain Nov. 08 : Legal FraPhotovoltaic situation in Spain Nov. 08 : Legal Fra
DeploymentDeployment andand PolicyPolicy FramewFramew
- Renewable Energies National
LegalLegal andand RegulatoryRegulatory FramewoFramewo
-Royal Decree 661/2007.
-Technical Building Code. ( Since September 2007)
-- New Royal Decree 1578New Royal Decree 1578(In force after Septemb(In force after Septemb
ameworkamework
workwork:
Plan
orkork:
8/2008 8/2008 ber 29th).ber 29th).
Deployment and Policy FrameDeployment and Policy Frame
Renewable Energies PlanRenewable Energies Plan
Ph t lt i T t PER 2010
Goal
Photovoltaics Targets PER 2010
Goal(2010): 400 MWIncrease(2005-2010): 363 MW
B kd b I ll i C i (2010)Breakdown by Installation Categories (2010):
Off-Grid On-Grid On-Grid P<10Off Grid P<100kW (Sun Trackin15 MW 205 MW 112 MW
ework: Targets PER 2005ework: Targets PER 2005--20102010
n 2005n 2005--20102010
112
88 350
400
450
100
120 Annual Installed Power (MWp)
MW
p) Accumulated Power (MWp)
p)
72250
300
350
60
80
ed P
ower
(M
Pow
er (M
Wp
46
2619 100
150
200
20
40
nual
Inst
alle
umul
ated
P
1910
0
50
2004 2005 2006 2007 2008 2009 20100
20
An Acc
00kW On-Grid
At the End of the Year
ng) P>100kW31 MW
Source:
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
RD 436/2004
20032003 20042004
Feed in Tariff RegulationFeed in Tariff Regulation: : Evolution of onEvolution of on--Grid PV Grid PV InstallationsInstallations
Number of Installations 1.5541.554 3.2073.207
InstallationsInstallations
P ≤ 5kWp 1.498 3.0075 kWp < P ≤ 100 kWp 52 195
P> 100 kWp 4 5Installed Capacity (MWp)Installed Capacity (MWp) 1111 2222
P ≤ 5kWp 7 145 kWp < P ≤ 100 kWp 1 5
P> 100 kWp 3 3
Source:
0808
RD 661/2007
44 20052005 20062006 20072007GrowthGrowth
20032003 2007200720032003--20072007
77 5.2715.271 9.5339.533 14.5614.5677
837 % 837 %
7 4.552 6.703 8.561 471 %
713 2.851 5.988 11.415 %
6 9 18 350 %
4444 141141 356356 3.136%3.136%
21 32 40 471 %
20 103 289 28.800 %
3 6 27 800 %
National Energy Commission
2007 PRODUCTION OF CE2007 PRODUCTION OF CE
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
2007 PRODUCTION OF CE2007 PRODUCTION OF CECellsCells
ProductionProduction CCMWpMWp
PolysiliconPolysilicon 115,00115,00Thin FilmsThin Films n/an/aConcentrationConcentration n/an/aTOTALTOTAL 115 0115 0TOTALTOTAL 115,0115,0
2007 SPANISH PV INDUS2007 SPANISH PV INDUSSpanish Cell Production/WorlSpanish Cell Production/WorlSpanish Module Production/WSpanish Module Production/WSpanish Module Production/WSpanish Module Production/WSpanish Cell Capacity/World CSpanish Cell Capacity/World CSpanish Module Capacity/WoSpanish Module Capacity/Wo
LLS AND MODULES IN SPAINLLS AND MODULES IN SPAIN
0808
LLS AND MODULES IN SPAINLLS AND MODULES IN SPAINModulesModules
CapacityCapacity ProductionProduction CapacityCapacityMWpMWp MWpMWp MWpMWp
165,00165,00 149,53149,53 340,30340,30n/an/a n/an/a ¿20¿20--30?30?n/an/a 55 77
165 0165 0 154 5154 5 347 3347 3165,0165,0 154,5154,5 347,3347,3
STRY GLOBAL POSITIONSTRY GLOBAL POSITIONld Productionld Production 4%4%World ProductionWorld Production 5%5%World ProductionWorld Production 5%5%CapacityCapacity 10%10%rld Capacityrld Capacity 18%18%
Cost of the PV Solar Systems in SpainCost of the PV Solar Systems in Spain
2008 system p5,75,88
9
4,6
7
8
[€/W
p]
3
4
5
m c
ost
1
2
3
Syst
em
0
España Italia CoSpain Italy Kor
Higher system princes than in eqHigher system princes than in eq
prices estimate. Ground monted (1MWp)
3,74,1
,5,
orea Alemania c-Si Alemania LDrea Germany c-Si Germany TF
quivalent largequivalent large--scale PV Marketscale PV Market
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
New and Accumulated PVNew and Accumulated PV
700
New and Accumulated PVNew and Accumulated PV1.290 % over PE1.290 % over PE
600
500
300
400
MW
p
200
11,3 13,8 18,5 23,8 39,58,8
100
0
1998 1999 2000 2001 2002 2003 2
En años anteriores EAccumulated Capacity AEn años anteriores EAccumulated Capacity A
0808
V SystemsV SystemsV SystemsV SystemsR Target !!R Target !!
593 MWp593 MWp
425,8
165
35,6 58,923,3
106,1
2004 2005 2006 2007
n el añoAnnual increasen el añoAnnual increase
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
Photovoltaic Investment in SpaPhotovoltaic Investment in Spa(M(M€€))(( ))
Factories and Manufacturing:PV Installations and Systems: 2Stock Exchange: 2
TOTALTOTAL 5.5.
Spanish Photovoltaic SectoSpanish Photovoltaic Sectopp(M(M€€))
PV Installations and Systems:PV Installations and Systems:Sale of PV-Electricity:
TOTATOTATOTATOTA
ImportedImportedImportedImported
0808
ainain
4002.5002.100
.000.000
or Salesor Sales
7.5007.500250
ALAL 7.750 M7.750 M€€ALAL 7.750 M7.750 M€€
d Modules: 2.500 Md Modules: 2.500 M€€ !!!!d Modules: 2.500 Md Modules: 2.500 M€€ !!!!
PV 2008 Status in SpainPV 2008 Status in Spain
500
600
400
500
t (M
€) Accumulated Industrial IAccumulated Industrial IModule
300
400
estm
ent
January’ 99- December’ 07ModuleCompoManufac
Direct Investment (M€) 864
125 3200
ect I
nve Direct Investment (M€) 864
2007 Increase (M€) 486
125,370,1
24 2100
Dir
e
24,20
2002 2003 20042002 2003 2004At the
536,7
nvestments 1999nvestments 1999--20072007es and Installerses and onents ctures
Installers and Supply
IndustryTOTAL
4 6 69 168 933 84.6 69.168 933.86.4 50.3 536.7
69,7107,8
2005 2006 20072005 2006 2007En of the year
E l G tiE l G ti
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
Employ GenerationEmploy Generation
Spanish PV Industry J30.000
25.000
bs
6 292
10.
15.000
20.000
er o
f Job
3 6004.020
5.5256.292
10.000
Num
be
3.600
0
5.000
2002 2003 2004 2005
At the End of the Yea
0808
Job26 00026.000
645
2006 2007
ar
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
The Photovoltaic Paradox inThe Photovoltaic Paradox in
The risks oThe risks o
R D 157R.D. 157
0808
n Spain:n Spain:
of the successof the success
78/200878/2008
Spanish PV Regulatory and legaSpanish PV Regulatory and legaFeed in Tariff RegulFeed in Tariff RegulFeed in Tariff RegulFeed in Tariff Regul
-Determines a feed-in-tariff for PV,i fl ti t
InstalledInstalled II
inflation rates.
TariffTariff PowerPowerP P 100 kW100 kW 100 kW100 kW
First 25 Years(€cent/kWh)
44,0381
After 25 Years(€cent/kWh)
35,2305
- Cap Limit 371 MWp (PER). Revision of theis reached. Revisions will not retroactive.
- PER Objective reached in August 2008. Ongrid according to RD 661/2007. September 2
al Framework 2007al Framework 2007-- Sept 2008: Sept 2008: lation RD 661/2007lation RD 661/2007lation RD 661/2007lation RD 661/2007annual revision according with the
InstalledInstalled InstalledInstalledPowerPower
W <P< 10 MWW <P< 10 MWPowerPower
10 MW <P 10 MW <P 50 MW50 MW
41,7500 22,9764
33,4000 18,3811
e tariff every four years, or if PER objective
ne year to connect new installations to the2008, after that ….. .
Spanish PV FeedSpanish PV Feed--inin--Tariff sitTariff sitRD 661/2007 Why aRD 661/2007 Why aRD 661/2007. Why aRD 661/2007. Why a
ObjectivesObjectivesjjTo reach PER PV TargetsAdequate times for InvestmentAdequate times for Investment return.To support the Spanish PVTo support the Spanish PV Industry
RRResResFast growth butFeed-in-Tariff co
*C t d t i d b PER d i t*Cost determined by PER during tCost estimated during 2008: > 8
tuation at the End of 2006: tuation at the End of 2006: and consequencesand consequencesand consequences.and consequences.
Status September 2008Status September 2008Surpassed
Surpassed
Reached
ltltultsultst un-sustainableost out control*
h i d 2005 2010 500 M€he period 2005-2010: 500 M€00 M€
PV Status in Spain at the beginning of 200PV Status in Spain at the beginning of 200
The Photovoltaic Paradox in SpThe Photovoltaic Paradox in Sp
1200
ear)
U t i bl2 22 2800
1000
(MW
p/ye Unsustainable
RD 6
2,22,242
400
600
Pow
er
RD 436/2004
RD 6
10 192611,8 23,3 106,1
200
400
nsta
lled
10 190
2004 2005 2006
In
Objetivo PERPER Targets
0808
pain: Effect on the Installationspain: Effect on the Installations
1000e
RD 1578/2008
C i i2 GWp2 GWp1000e
661/2007
Crisisor
Sustainability?
2 GWp2 GWp25,8
661/2007 Sustainability?
46 75 88 112
2007 2008 2009 2010
Year
Instalaciones EfectuadasActual PV Installations
Crisis o Sustainability?: CoCrisis o Sustainability?: CoPV 2008 Status in SpainPV 2008 Status in Spain
Cost of the Feed-in -
Crisis o Sustainability?: CoCrisis o Sustainability?: Co
1000M€Cost of the Feed in Average Retribution
* 30-09-2008
800 30 09 2008
** Estimated 31-12-2008Electricity Market Averag
36,74 39,91 4600
200
400
6,14 13,98 30
200
02004 2005
At the EnAt the En
ost of the PV’ Feedost of the PV’ Feed--in Tariffin Tariff
-Tarif (M€)
ost of the PV Feedost of the PV Feed--in Tariffin Tariff
100
Tarif (M€) for PV electricity (cent€kWh)
> 800 M€**80
wh
800 M€8e Price 6,6 cent€/kWh
42,75 43,38 45,2* 60
t€/k
w
193,46376,54*
20
40
cent
39,790
20
2006 2007 2008nd of the Year
0
nd of the Year
Establish: Two Class of InstallEstablish: Two Class of InstallEstablish: Two Class of InstallEstablish: Two Class of Install
Type I: Installations onType I: Installations on--roof, roof, facades, sound barriers, facades, sound barriers, pergolas, farms, ….. ., pergolas, farms, ….. .,
Typo II: OnTypo II: On--groundground
The size of the installation is dThe size of the installation is dinstallation connected to the sainstallation connected to the sainstallation connected to the sainstallation connected to the saelectricity to the gridelectricity to the grid
ations:ations:ations:ations:
Type I.1 PType I.1 P≤≤ 20 kW20 kWPPmaxmax 2 MW2 MWmaxmax
Type I.2 P> 20 kWType I.2 P> 20 kW
PPmax max 10 MW10 MW
etermined by the sum of all etermined by the sum of all ame point of evacuation of theame point of evacuation of theame point of evacuation of the ame point of evacuation of the
Establish:Establish:Establish:Establish:A PreA Pre--Assignation Register foAssignation Register focalls and timing for calls andcalls and timing for calls andcalls, and timing for calls andcalls, and timing for calls and
Establish:Establish:
Base power for the first yeaBase power for the first yea1st Call 15/10/20081st Call 15/10/2008--15/111/2015/111/20
Type I: 267/m MWpType I: 267/m MWp
Tipo II: 133/m MWpTipo II: 133/m MWpº l llº l llm= nº annual callsm= nº annual calls
or FIT quota. With four annual or FIT quota. With four annual definitive quota assignationsdefinitive quota assignations definitive quota assignations. definitive quota assignations.
r.r.008. Assignation 16/012009008. Assignation 16/012009
Type I 1: 10%Type I 1: 10%Type I.1: 10%Type I.1: 10%Type I.2: 90%Type I.2: 90%
Establish:Establish:
The economic regime of the PVThe economic regime of the PV
Establish:Establish:
The economic regime of the PVThe economic regime of the PV The FeedThe Feed--inin--Tariff for the 1Tariff for the 1stst cc
TypologyTypology
Type IType ISubtype I.1Subtype I.1
Subtype I 2Subtype I 2Subtype I.2Subtype I.2
Type IIType IIType IIType II
V installations ascribe to R DV installations ascribe to R DV installations ascribe to R.D. V installations ascribe to R.D. callcall
Tariff (cTariff (c€€/kWh)/kWh)34 0034 0034,0034,0032 0032 0032,0032,00
32 0032 0032,0032,00
Establish:Establish: The calculus of the tariff (TThe calculus of the tariff (Tnn))
i t d i thi t d i th
Establish:Establish:
power prepower pre--registered in the preregistered in the pre Correction by inflation is notCorrection by inflation is not Maximum time for perceptioMaximum time for perceptioIf PIf Pnn 11 ≥≥ 0,75xP0,75xP00 TTnn = T= Tnn 11 [(1[(1--AAIf PIf Pnn--11 ≥≥ 0,75xP0,75xP00 TTnn T Tnn--11 [(1[(1 AAIf PIf Pnn--11 < 0,75xP< 0,75xP00 TTnn = T= Tnn--11A = 0 9A = 0 91/m1/m; P; P power prepower pre--registered in the cregistered in the cA = 0,9A = 0,9 ; P; Pnn--11 power prepower pre--registered in the cregistered in the ccall ncall n--11..
On the best of the case POn the best of the case P
1(TT nn 1(
1
is determined by tariff and is determined by tariff and i ll (Ti ll (T PP ))evious call (Tevious call (Tnn--11 y Py Pnn--11) .) .
t determined.t determined.on 25 years.on 25 years.A) x (PA) x (P00 –– PPnn 11) / (0,25 x P) / (0,25 x P00) + A]) + A]A) x (PA) x (P00 PPnn--11) / (0,25 x P) / (0,25 x P00) A]) A]
call ncall n--1; P1; P quota of power assigned in thequota of power assigned in thecall ncall n--1; P1; P00 quota of power assigned in the quota of power assigned in the
PPoo= P= Pnn--1 . 1 . TTnn = 0,974 T= 0,974 Tnn--11
Thus PThus P nn = 1 026 P= 1 026 PThus PThus Poonn = 1,026 P= 1,026 P00
PPA n )()1 1/1A
PPPA n
)25,0()()1
0
10 mA /19,0;
Di tDi tDirect consequence:Direct consequence:
Tariff decrease aTariff decrease a¡¡ 2,6 %¡¡ 2,6 %¡¡¡¡annualannual
and quota arise :and quota arise :qq%/call !!%/call !!
10,0%10,0%
Di t M k t RDi t M k t RDirect consequence: Market ReDirect consequence: Market ReAnnual Installed Capacity in M
MWy
10001000
1200
MWpHistoric F
800
1000
-2,1%
501 500
400
600
0
200
0
2007 2008 200At the End of the Y
Source: LLBBW (02.2008), Merril Lync
XX% Market-Compound An
t i ti (2008t i ti (2008 2010)2010)estriction (2008estriction (2008--2010). 2010). MW
Forecast
Market
0400
09 2010Year
ch (01.2008), Photon Consulting (03.2008), ASIF (03.2008).
nnual Growth Rate (CAGR)
Consequence foresight: New mConsequence foresight: New mq gq gInstallation by Type
3%2% 3% 3%
64% 70%
31% 24%24%
2007 20082007 2008 94% of the installed power’ 08 co 70% with tracking 70% with tracking
market Structure.market Structure.
100%100%(MWp)
25% OnOn--roof (Flat cover)roof (Flat cover)
100%100%
15% OnOn--roof (Tilt cover)roof (Tilt cover)
30% OnOn--ground with trackingground with tracking
30% OnOn--ground fix structureground fix structure
2009
gg
2009orresponds to on-ground systems.
Source: Solarbuzz 2008 and J. Esteban :
Consequence foresight: New mConsequence foresight: New m
Installations by System Siz
q gq g
501 1000
y y
91% 93%
1%8% 5%
1%1%
1%
2007 20082007 2008 93% of the installed power’ 08 co
market Structure.market Structure.
ze (MW)500 100%100%
( )
33% > 1MW)> 1MW)
40% 100 kW < 1MW100 kW < 1MW
18% 10kW < 100kW10kW < 100kW9%
2009
< 10 kW< 10 kW
2009orresponds to systems > 1MWp.
Source: Solarbuzz 2008 and J. Esteban:
Consequence foresight: Less inConsequence foresight: Less inConsequence foresight: Less inConsequence foresight: Less inProduction Capacity* Productio*Estimated acording RD 661/2007Estimated acording RD 661/2007.**According to RD 1578/2008 (Po =Pn-1)*** RD 1578/2008 +60 MWp (2009) and + 30 MW
1074
16
647819
1074835
573425 500***425
2007 2008 2009e
BE: Delocalization of Production and SME: Restriction for market access
Source: Spanish As
ndustryndustryndustry.ndustry.on* Annual quota ( Po = Pn-1)**
18031984Wp (2010) on-ground
6391803
15231385
1179
587532490***
2010e 2011e 2012e
d Investment: China, Italy, Portugal, ..s.
ssociation of Photovoltaic Enterprise
Consequence foresight: RestricConsequence foresight: RestricConsequence foresight: RestricConsequence foresight: Restric
Accumulated PV PowerAccumulated PV Power
00MWp
High SceSignificanthe Indus
00
00
p the Indus
Medium As Nowa
6341800
00
00
Low SceG th
0
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
201
Growth r
2 2 2 2 2 2 2 2 2 2 2 2
At the end of the year
ProposePropose
ction of the Growthction of the Growthction of the Growthction of the Growth
PV quota of
Scenario2020
MW/yearInstalledAverage
Electricity Generation in
2010 g
enario (20 GW)nt development of stry
1500 MW 6,0%stry
Scenario (11 GW)adays 800MW 3.5%
nario (7 GW)t i ti
500 MW 2.2%01
820
1920
20
estriction2 2
ed byed by Equivalente R.D. 1578/2008 Equivalente R.D. 1578/2008
Consequence foresight: DiminutionConsequence foresight: DiminutionConsequence foresight: DiminutionConsequence foresight: Diminution
18 NET IRR (%)
16Fix +
14Fix +
O
Thin Film
12
Thin FilmNew FIT
10Tracking +
New8
New
Fix + crystallineNew FIT
64 4,5 5 5
New FIT
System CSource: SunTo
n of the profit or costs reductionn of the profit or costs reductionn of the profit or costs reduction.n of the profit or costs reduction.
Tracking + crystallineTracking + crystallineOld FIT
crystallinecrystallineOld FIT
+ crystallinew FITw FIT
5,5 6 6,5 7,5
Cost €/kWpool for a ground 100 kWp project in Seville and PVSYS irradiation
Consequence foresight: DiminutionConsequence foresight: DiminutionConsequence foresight: DiminutionConsequence foresight: DiminutionTariff R.D. 661/2007
ModulesModules SystemSystemIntegraIntegraBOSBOS
New Tariff
--9%9% --9%9% --35%35%
ModulesModules SystemSystemBOSBOSModulesModules IntegratiIntegratiBOSBOS
*Grid connection, Insurance, Administrative costs, … .**Installation place equivalent to Athens
n of the profit or costs reductionn of the profit or costs reductionn of the profit or costs reduction.n of the profit or costs reduction.
Installation Price: 6 Installation Price: 6 €€/Wp/WpTariff: 0,455 Tariff: 0,455 €€kWhkWh
IRR: 12,40%**IRR: 12,40%**mmtiontion
EngineeringEngineering&&
Others*Others*OthersOthers
--50%50% --20%20%
Installation Price: 4,8 Installation Price: 4,8 €€/Wp/WpTariff: 0,455 Tariff: 0,455 €€kWhkWh
EngineeringEngineering&& ,,
IRR: 10,47%**IRR: 10,47%**onon &&Others*Others*
OnOn--roofroofmm--Si ModulesSi Modules
J. Esteban:
ConclusionsConclusions (1/2)(1/2)Change of mind sets: frmarket to a sustainable framarket to a sustainable fra
Costs reduction.
Improvement of PV systems cintegration… .
Change of perception of th Elimination of caps for installe
Links between annual installe
The new magic formula:
Links between annual installe
The new magic formula:
C: The new P
rom an uncontrolledameworkamework
concepts :Size, application,
he System Authorities.ed power.
ed power and tariff variation.
nPP0
ed power and tariff variation.
cn
n
TT
0
0
PV “charmed” particle C ≥1 o C< 1
ConclusionsConclusions (2/2)(2/2) Photovoltaics is still a sustaThe key, lower cost and introduThe key, lower cost and introdu
FeedFeed--inin--TariffTariffR.D. 661/2007R.D. 661/2007
For Instance:For Instance:
Price of Price of th tth t IRRIRRthe systemthe system IRRIRR
xx--SiSi 6 6 €€/Wp/Wp 12,1812,18
Thin FilmThin FilmThin FilmThin Film(CdTe)(CdTe)
5,2 5,2 €€/Wp/Wp 17,4817,48
ainable and profitable business:uction of new concepts.uction of new concepts.
New tariffNew tariffR.D. 1578/2008R.D. 1578/2008
RRPrice of Price of
thethe IRRIRRRRSystemSystem
IRRIRR
8 %8 % 4,8 4,8 €€/Wp/Wp 10,47 %10,47 %
8 %8 % 4,6 4,6 €€/Wp/Wp 12,40 %12,40 %J. Esteban:
Who was the “stupid”, which tWho was the “stupid”, which tPATT
n ()1( 10
The Answer: He was very clever.P
TT nn 25,0(
()( 01
the “famous” EPIA Learning Curve”
If we can follow the EPIA slope: If we can follow the EPIA slope:
,( ratioePerformancfIRR
,,( coscos tt
ratio
OonInstallatiModulefIRR
If: Yes WE CAN !! Then
But, Two more questions:
If: Yes, WE CAN !! Then
, q Is it possible always the follo
Is it possible another “Sink Cformerly Spain, with extremely
hough the “famous” formula ?hough the “famous” formula ?
APn )1 mA /19010
ulo
(€/W
p)
Escenarios de precios EPIA1
10
100
0,1 1 10 100 1000 10000 100000
Prec
io d
el M
ódul
o (€
/Wp)
20% disminución del precio Hasta 2003. Por acumulación del doble de potencia instalad
HistóricoPrevisión10
ulo
(€/W
p)
Escenarios de precios EPIA1
10
100
0,1 1 10 100 1000 10000 100000
Prec
io d
el M
ódul
o (€
/Wp)
20% disminución del precio Hasta 2003. Por acumulación del doble de potencia instalad
HistóricoPrevisión
The real guilty is
AP
n
))
0
1 mA /19,0;
0
1
1 10 100 1000 10000
Prec
io d
el m
ódu
1,1 GWp/a2004
3,3 GWp/a2010
31 GWp/a2020
300 GWp/a2030
Factor de experiencia15%
18%
MWp Instalados acumulados
0
1
1 10 100 1000 10000
Prec
io d
el m
ódu
1,1 GWp/a2004
3,3 GWp/a2010
31 GWp/a2020
300 GWp/a2030
Factor de experiencia15%
18%
MWp Instalados acumulados
CostGWp instalados acumuladosGWp instalados acumulados
)o
InstalledP
)& ,cost
o
MO
Business (€)Business (€)
ow up of the learning curve?
Country” of PV Modules, like advantageous FIT?