21
14th September 2011 4th Stakeholder Plenary Meeting Ingvar Landälv Chemrec AB Status report on Demonstration Plants for Advances Biofuels Production - Thermochemical Pathway
Transcript
Page 1: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

Ingvar LandälvChemrec AB

Status report on Demonstration Plants for Advances Biofuels Production

- Thermochemical Pathway

Page 2: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

DISCLAIMER

The presenter has gathered most of the information from contacts with

project owners and technology suppliers and to some extent through

the Internet.Some deviations from factual situation

may be presented.The presentation does not claim to completely cover the given topic.

Page 3: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

Four Identified Value Chains

A. Synthetic fuels* (oxygenates or hydrocarbons) through gasification.

B. Bio-methane through gasification

C. High efficiency heat & power generation through gasification

D. Intermediate bio-energy carriers through techniques such as pyrolysis and torrefaction

* Includes all fuels produced via synthesis of H2 + CO

Page 4: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

Transport

Biofuels

Co-products

***Final

Conversion

Pre-treatment

Initial

Conversion

BiomassProduction

System

Co-located

- Feeding sys.- Gasification

- CH4 ref’ng- Tar handling

- Particulatehandling

- Shifting

- Gas cleaning- Etc

-pyrolysis- coarse prep.

-drying-torrefaction

-grinding

- Synthesis- reforming

- Cracking- hydrotreating

- Distillation- Etc

*Could include

the value chain D

***certain steps of final conversionmay be located elsewhere

*

Final

Conversion -Hydrotreatment-Co-treatment

** Black Liquor is an internal,

energy-rich stream within pulp mill.No pre-treatment necessary before gasification.

-black liquor **

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

Page 5: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

Choren Projects

a. Beta plant,

~45 MWt / FT products / Under Start-up

b. Sigma Plan

~640 MWt / FT products / Start-up 2016

c. Green-H2 Plant

160 MWt /H2 / Start-up 2016

Bioliq® Project

2 MWt / fast pyrolysis: Operational

5 MWt EF gasification: Start-up 2012

Choren Beta Plant

Page 6: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

Chemrec Projects

a. BioDME

~3 MWt / DME / Start-Up

June 2011

b. Domsjö Biofuels

~200 MWt / DME and Methanol / Start-Up 2014/15

UPM Project

a. Pilot testing at GTI, Chicago

~5 MWt / syngas production / Ongoing

b. Commercial Demonstration

~300MWt / FT products(100 000 t/a) /

Start-Up 2015; Applied for NER300 support

Pilot tests in Chicago at GTI

Gasification ModuleFull sized plantSource: UPM, Andritz,Carbona

The BioDME Plant in PiteåProposed Domsjö Site

Page 7: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

VVBGC Project

~15 MWt / clean syngas

Funding closure unsuccessful

Technical activities suspended

Neste-Stora Enso projects

a. Varkaus

~ 12 MWt /5 MWt of syngas to reforming & cleaning / small

part stream to FT wax / Test program completed 9/2011

b. Full Scale Demonstration

Applied for NER300 Support StoraEnso Pilot Plant

BIO MASS

GASIFIER

GAS COO LER

FLARE

WATER GASSHIFT

STEAMTURBINE

DISTRI CT HEATING

HEAT RECOVERYSTEAM

GENERATOR

CHIMNEY

GASTURBINE

CONDENSER

ASH

BURNER

STEAM +O XYG EN

HOT GAS FILTER

GAS CO OLER

OXYGEN

REFORMER

HYDRO-GENERATION

SYNTHESIS GAS

BURNERQUENCH

NEW SYNGAS PARTS

EXISTI NG IGCC

BY- PASSED SECTIO NS

SLIPSTREAMHOT GAS FILTER

G AS FILTER

EQUIPMENT NOT USED IN PROJ ECT

Illustration of extended plant

Page 8: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

BioTfueL Project

~ 12 MWt / FT products / 2013

Fuel mix of fossil and renewable

Including torrfied biomass

Värmlandsmetanol

~ 111 MWt / Methanol/ 2014

Source: Uhde

Source: Uhde

Page 9: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

Güssing Plant

Test site for

FT technology: 2 technologies in lab scale tests

Higher alcohols: 1 technology in lab scale test

Examples of NER300 Project

Holland (Siemens/Linde): Fuel grade Methanol project: 400 kt/ y

Sweden (Rottneros): 2 fuel grade Methanol Projects: 230 and 140 kt / y

Finland(Metsäliitto/Vapo): A third* FT Project: > 100 t/y

* Besides two projects mentioned earlier

Location of one of the Swedish projects: Rottneros Vallvik pulp mill

Güssing FT production flow scheme

Page 10: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

Key R&D Areas

• Pre-treatment scale-up and cost

• Where is the system pressurized? (Biomass feeding system: Syngas compression; ...)

• Syngas purification technology and cost

• Overall integration

A. Synthetic fuels (oxygenates orHydrocarbons) through gasification

Page 11: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

B. Bio-methane through gasification

Methane

Pre-

Treatment

Initial

Conversion

BiomassProduction

System

Co-located

- Feeding sys.- Gasification

-Tar handling-Particulate

handling- Shifting

- Gas cleaning

- Etc

-pyrolysis-coarse prep.

-drying-torrefaction

-grinding

CNG

energy carrier

*Could include

the value chain D

*Final

Conversion

- Methanation

Page 12: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

B. Bio-methane through gasification

ECN / HVC Project

12 MWt / SNG / 2013

Güssing Plant

8 MWt / Heat & Power / 2002

Test (=>2009): Side stream converted to SNG

Technology selected for first step in GoBiGas

GAYA (GdF – Suez)

Decentralized SNG for transportation application

1 MWt / SNG / 2013

BioSNG PDU

TechnikumFuellingStation

SNG pilot at Güssing

Illustration of the ECN / HVC Plant

Page 13: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

B. Bio-methane through gasification

GobiGas – Gothenburg Energy

a. Phase 1,

20 MWt of gas / SNG / 2013 (Construction started)

b. Phase 2

80 – 100 MWt of gas / SNG / 2015-16, (NER Application)

Examples of NER300 Project

Sweden (E.On): 200 MW SNG plus district heat

GoBiGas Project, Phase 2

Page 14: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

B. Bio-methane through gasification

Key R&D areas

• Pressurization. Where is the process pressurized?

• Gas conditioning and purification technology and cost

• Efficint distribution

Page 15: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

C. High efficiency heat & power generation through gasification

Electricity

forvehicles

As energy

carrier

- Electricitygeneration

BiomassProduction

System *

-coarse prep. -drying

-torrefaction-grinding

-pyrolysis- Feeding sys.- Gasification - Tar handling- Particulatehandling- Gas cleaning- Etc

Initial

Conversion

Final

Conversion

Pre-

Treatment

*Could include

the value chain D

Co-located

Page 16: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

C. High efficiency heat & power generation through gasification

Güssing Plant (FICFB gasifier)

8 MWt / Heat & Power / 2002

(2 more plant in operation and

2 in EPC phase, 10-25 MWt)

Värnamo Project

18 MWt / 9 MW Heat & 6 MW Power

Operated by Sydkraft 1996 – 1999

on behalf of developer Bioflow Oy*

Plant bought by VVBGC AB in 2004

*JV composed of E.ON Sweden and Foster Wheeler

Güssing heat&power plant

The VVBGC BioIGCC Plant

Page 17: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

C. High efficiency heat & power generation through gasification

Key R&D areas

• Pre-treatment scale-up and cost

• Fuel gas purification technology (hot gas filtration and tar removal at HT)

• Overall energy integration

Page 18: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

D. Intermediate bio-energy carriers

1. Bioenergy

carrier for furtherprocessing to fuels

(2. As energy carrier)

BiomassProduction

System

Distributed

-coarse prep. -drying

-torrefaction-grinding

-pyrolysis+stabilization

Conversion

Steps

Page 19: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

D. Intermediate bio-energy carriers

PYROLYSIS

VTT, UPM, Metso, Fortum integrated process

Pilot: 7 t/d verified; 80 tons produced; 40 t tested in small boiler

KIT (former FZK)

Bioliq project stage 1 for gasification

(see Value Chain A)

Other Projects

There are a great number of technologies in advanced stage of development specially in the US. Two main pathways for product:

� upgrading to automotive fuels through e.g. hydrotreatment etc

� As an ordinary liquid fuel

Metso Pilot Plant

Page 20: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

D. Intermediate bio-energy carriers

TORREFACTION

ECN

Runs a pilot (50 kg/h)

Plans a demo at 1-5 t/h for start up 2012

BioTfueL

3 t/h / energy carrier / 2012

Other Projects

There are a great number of actors in the field of torrefaction technology utilizing different technologies. There are still no plants in commercial operation but some demonstrations are in commercial scale such as:

Topell: 60 kton/y

Torr Coal: 35 kton/y

Stramproy Group: 45 kton/y

Multiple hearth furnace

Screw conveyor reactor

Rotary drum reactor

Moving bed reactor

Page 21: Status report on Demonstration Plants for Advances ... · PDF filec. Green-H2 Plant 160 MW t /H2 / Start-up 2016 ... FT technology: 2 technologies in lab scale tests ... Stramproy

14th September 2011 4th Stakeholder Plenary Meeting

Key R&D areas

• Scale-up

• Cost reduction

• Pyro-oil stability

• Product quality

D. Intermediate bio-energy carriers


Recommended