+ All Categories
Home > Documents > Stelkraft Pte Ltd

Stelkraft Pte Ltd

Date post: 23-Feb-2016
Category:
Upload: krikor
View: 134 times
Download: 3 times
Share this document with a friend
Description:
Stelkraft Pte Ltd. www.stelkraft.com. About Stelkraft. Since inception in 1988, Stelkraft Pte Ltd. has been developing effective and efficient Coil Tubing Equipments to our worldwide customers. - PowerPoint PPT Presentation
30
Stelkraft Pte Ltd www.stelkraft.com
Transcript
Page 1: Stelkraft Pte Ltd

Stelkraft Pte Ltdwww.stelkraft.com

Page 2: Stelkraft Pte Ltd

About Stelkraft

Since inception in 1988, Stelkraft Pte Ltd. has been developing effective and efficient Coil Tubing Equipments to our worldwide customers.Our continuous commitment in providing innovative solutions to meet customers' specifications and unique needs has led us to be the first Coil Tubing Equipment manufacturer in Asia.

Page 3: Stelkraft Pte Ltd

About Stelkraft

With a steady growth rate of over 20% annually, we expanded our operations in November 2007, by acquiring our present premises which spread across 44,300 square feet.

Today, we have built a knowledgeable and effective workforce dedicated to provide our customers with excellence products and services that allows us to become the preferred one-stop solution provider for Oilfield Equipments.

20082007

2006

2005

Page 4: Stelkraft Pte Ltd

About Stelkraft

Page 5: Stelkraft Pte Ltd

About Stelkraft

Page 6: Stelkraft Pte Ltd

Products

StelkraftProducts

Telescopic Control Cabin

Sub-Sea High Pressure Hose Reel

Telescopic Injector Jacking Frame

Pivoting CT Lifting Frame

Hydraulic Power Pack

Telescopic Spooler Frame

Clip-In Drum CT Frame

Coil Tubing Power Reel

Page 7: Stelkraft Pte Ltd

Clip-In Drum CT Frame (CID)

Single Telescopic

• CID-28T-A

• CID-35T-A

• CID-50T-A

• CID-70T-A

CID

Double Telescopic

• CID-12T-C

• CID-28T-C

• CID-35T-C

• CID-50T-C

• CID-70T-C

Page 8: Stelkraft Pte Ltd

CID (Single Telescopic)

Unique, rigid & robust steel structure for both onshore & offshore applications.•Compact telescopic and design for convenient transportation of the CID CT frame.•Eliminates the requirement of specially produced mechanical drum.•Suitable for applications where crane lifting capacity is limited.•Provides the combined functions of power reel and spooler frame.•Telescopic skid and levelwind for various widths of metal shipping spools.

Page 9: Stelkraft Pte Ltd

CID (Single Telescopic)

Page 10: Stelkraft Pte Ltd

CID (Single Telescopic)

Page 11: Stelkraft Pte Ltd

CID (Double Telescopic)

• Unique, rigid & robust steel structure complied to DNV 2.7-1 (Apr, 2006) Specifications and Certification for both onshore & offshore applications.

• Compact telescopic design for convenient transportation of the CID CT frame.

• Suitable for applications where crane lifting capacity is limited.

• Provides the combined functions of power reel and spooler frame.

• Automatic levelwinding by combinations of timing sprockets .

• Tube guide roller housing to which mechanical tube length measurement counter can be installed.

• Automatic lead screw levelwinding. Remote manual override control is possible.

• Variable output torque and turning speed. • Guide rollers are provided with quick loading and unloading of metal spool. Logging operation can be done with optional external electrical rotary slip ring.

• Easier operation, control and maintenance.

Page 12: Stelkraft Pte Ltd

CID (Double Telescopic)

Page 13: Stelkraft Pte Ltd

CID (Double Telescopic)

Page 14: Stelkraft Pte Ltd

Telescopic Control Cabin

Page 15: Stelkraft Pte Ltd

Telescopic Control Cabin

Page 16: Stelkraft Pte Ltd

Sub-Sea High Pressure Hose Reel

• Primary structure complied to DNV 2.7-1 (Apr, 2006) Specification and Certification for onshore & offshore application.

• Light and compact design for transportation.

• Rugged construction for heavy duty application and severe environmental conditions

• Easier operation, control, access and maintenance

• Reliable & safe

Page 17: Stelkraft Pte Ltd

Telescopic Injector Jacking Frame

•Light and compact design for transportation.

•Rugged structure and provides heavy duty application.

•Easier operation, control, access and maintenance.

•Reliable & safe.

•Winch can be included to assist the insertion of rigid metal tubing.

•Slight traverse motion add to the flexibility to align the injector to the well.

•Two / Three stages Jacking ability enable more flexibility during the initial set up of the BOP.

Page 18: Stelkraft Pte Ltd

Telescopic Injector Jacking Frame

Page 19: Stelkraft Pte Ltd

Telescopic Injector Jacking Frame

Page 20: Stelkraft Pte Ltd

Pivoting CT Lifting Frame

Page 21: Stelkraft Pte Ltd

Hydraulic Power Pack

Page 22: Stelkraft Pte Ltd

Hydraulic Power Pack

Page 23: Stelkraft Pte Ltd

Hydraulic Power Pack

Page 24: Stelkraft Pte Ltd

Hydraulic Power Pack

Page 25: Stelkraft Pte Ltd

Telescopic Spooler Frame

Page 26: Stelkraft Pte Ltd

Telescopic Spooler Frame

Page 27: Stelkraft Pte Ltd

Telescopic Spooler Frame

Page 28: Stelkraft Pte Ltd

Coil Tubing Power Reel

Page 29: Stelkraft Pte Ltd

Coil Tubing Power Reel

Page 30: Stelkraft Pte Ltd

Stelkraft Pte Ltd

Address: 9A Benoi Sector, Singapore 629862 Tel: +65-62680188 Fax: +65-62682893 Website: www.stelkraft.com


Recommended