Steve Rawlings3 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS2-T1 Deliverables: T0=July2006 Line HI Surveys – Oxford, Groningen, Swinburne, (UCL) Danail Obreshkow, Francois Levrier & Hans-Rainer Klöckner (Oxford); simulation deliverable T0+12. DELIVERED (PUBS IN PREP). ALMA: Ian Heywood (Oxford). Filipe Abdalla (UCL) & Chris Blake (Swinburne). PAPERS PUBLISHED. Rense Boomsa (Groningen); High-res HI module. DELIVERED (PUBS IN PREP).
11
Steve Rawlings 1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Science Simulations (DS2-T1) Overview Overview With thanks to Hans-Rainer Klöckner who manages this (complicated, multi-site) activity from Oxford
Transcript
Page 1: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 1DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

Science Simulations (DS2-T1) OverviewScience Simulations (DS2-T1) Overview

With thanks to Hans-Rainer Klöckner who manages this (complicated, multi-site) activity from Oxford

Page 2: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 2DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006 • Continuum Surveys – Oxford, Leiden, (Herts)

Richard Wilman, Matt Jarvis + Tom Mauch (Oxford); continuum simulation deliverable T0+18. DELIVERED and

PUBLISHED. Additional (“Herschel”) work soon underway at Swinburne.

Ilse van Bemmel (Leiden) has been working on a MeqTree Ionosphere module.

Page 3: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 3DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006

• Line HI Surveys – Oxford, Groningen, Swinburne, (UCL)

Danail Obreshkow, Francois Levrier & Hans-Rainer Klöckner (Oxford);

simulation deliverable T0+12. DELIVERED (PUBS IN PREP). ALMA: Ian

Heywood (Oxford). Filipe Abdalla (UCL) & Chris Blake (Swinburne). PAPERS

PUBLISHED. Rense Boomsa (Groningen); High-res HI module. DELIVERED

(PUBS IN PREP).

Page 4: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 4DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006

• Magnetism – Cambridge, Bonn

Martin Krause and Joen Geisbuesch (Cambridge); simulation deliverable T0+18. PARTIALLY DELIVERED (PUBS IN PREP); see POSTER.

Tigran Arshakian (Bonn); High-resolution B module. SEE TALK.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 5: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 5DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006

• Pulsar Surveys – Manchester (see Talk)

Roy Smits (Manchester), simulation deliverable T0+15

Aris Karastergiou (Oxford)

Page 6: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 6DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006

• Pulsar Surveys – Manchester (see Talk)

Roy Smits (Manchester), simulation deliverable T0+15

Aris Karastergiou (Oxford)

Page 7: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 7DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Deliverables: T0=July2006DS2-T1 Deliverables: T0=July2006

• EOR – Paris, Lisbon

Paola Di Matteo (Paris), simulation deliverable T0+21

SEE TALK BY MARIO SANTOS

Page 8: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 8DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

DS2-T1 Final DeliverableDS2-T1 Final Deliverable

• Year in Life

• Will build on SKADS Virtual Telescope (SVT) Exercise, but now with sky simulation tools fullly in place

• What data simulation tools will be in place (see DS2-T2 talks)?

• Relation to SPDO’s Science Reference Mission and similar exercise by E-ELT

Page 9: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 9DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

The FutureThe Future

Path2SKA: Marie Curie ITN submitted Sep 2008. ~30 early-stage researchers with a significant sky simulation component. If funded will maintain European lead in global sky simulation effort.

Whether, or not, funded, ESKAC will continue to develop European SKA science community.

Will exploit modern simulations, continue to utilize data constraints, and will increase synergies with SKA pathfinders and experiments at other wavebands.

Page 10: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 10DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

Introduction

21 cm simulated maps:exemples of recent results

Mellema et al. (2006)Valdés et al. (2006)

Beam=3.0 arcmin Bandwidth=0.13 MHz

20 Mpc/h

z=9.9

z=9.26

z=10.6 Box size is crucial

Currently from ~ 1 Mpc to ~ 100 Mpc.

- Small boxes: statistics issues

- Large boxes: bad resolution (use of a clumping factor) faster reionization.

In all case:

Lyman-alpha flux not simulated !

(assumed uniform)

Page 11: Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.

Steve Rawlings 11DS2-T1 Overview4th SKADS Workshop, Lisbon, 2-3 October 2008

• Pulsar Surveys – Manchester

Roy Smits (Manchester), simulation deliverable T0+15

•EOR – Paris, Lisbon

Paola Di Matteo (Paris), simulation deliverable T0+21