    Extradosed Prestressed BridgesSteven L. Stroh, PhD, PE, SE

    Vice President

    Deputy Director of Surface Transportation Major Bridges

    URS Corporation, Tampa, FL

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    2/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    AGENDA

    The Extradosed Bridge Concept

    Representative Extradosed Bridges

    Key Proportioning Parameters and Design

    Considerations

    Case Study

    Concluding Remarks Questions

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    3/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    What is an Extradosed Prestressed Bridge?

    Odawara Port Bridge, Japan (1994)

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    4/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Defining an Extradosed BridgeJacques Mathivat , Journal of FIP, 1988

    Recent Developments in Prestressed

    Concrete Bridges

    Tower height is the defining element

    Cable Stayed 1/5

    Extradosed 1/15

    Extradosed Prestressing

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    5/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Characteristics of an Extradosed Bridge

    Shorter tower than cable stayed

    Shallower girder than a girder bridge, but deeper than a

    cable stayed bridge

    Flatter cables than a cable stayed bridge, and only over

    a portion of the span.

    Cables sized to prestress the deck

    Low fatigue ranges for cables

    Uniform size range for cables

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    6/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Girder Depth to Span

    1:16 to 1:18 (at support)

    Girder Bridge

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    7/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Girder

    depth:

    5 to 6 ft.

    Tower

    height to

    Span:

    1:4

    V

    H

    Cable-Stayed Bridge

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    8/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Girder Depth

    to Span:

    1:30 to 1:35

    Tower Heightto Span:

    1:10 to 1:15

    ExtradosedPrestressed

    Bridge

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    9/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    More than 60 ExtradosedBridges World-wide

    More than 30 in Japan More than 25 countries have at least one

    Currently 3 in the U.S.

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    10/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Progression of Extradosed Bridge Construction

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    11/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Representative

    Extradosed Prestressed

    Bridges

    11

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    12/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Odawara Port Bridge, Japan (1994))

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    13/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Tsukuhara Bridge, Japan

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    14/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Okuyama Bridge, Japan

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    15/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Miykodogawa Bridge, Japan

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    16/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Kiso and Ibi River Bridges, Japan

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    17/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Rittoh Bridge, Japan

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    18/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Sunnibergbrucke, Switzerland

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    19/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Golden Ears Bridge, Vancouver, BC

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    20/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Introduction

    First U.S. Extradosed Bridge

    Pearl Harbor Memorial Bridge, New Haven CT

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    21/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    I-35 bridges over the Brazos River in Waco, Texas

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    22/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Image Courtesy MnDOT

    St Croix River Bridge, Minnesota - Wisconsin

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    23/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Special Case Bridges (Non-Extradosed)

    Barton Creek Fin-Back Bridge Ganter Bridge, Switzerland

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    24/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Key Proportioning Parameters andDesign Considerations

    Span Lengths

    Side Span Ratios Multi Span Bridges

    Tower Height

    Girder Depth/Haunch Bridge Width

    Aesthetic Opportunities

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    25/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Economical Bridge Types

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    26/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Economical Bridge Types

    200 900Extradosed

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    27/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Side Span/Main Span Ratio

    Girder Bridges

    Cast on falsework:

    L1/L = 0.8

    Balanced Cantilever:L1/L = 0.65

    Cable Stayed Bridges

    Steel

    L1/L = 0.35

    Concrete

    L1/L = 0.42

    Extradosed Bridges

    Mean L1/L Ratio = 0.57

    One Std. Deviation = 0.45 to 0.69

    Use L1/L = 0.6

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    28/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Backstay Cable

    Consideration of Multi-Span Cable-Stayed Bridges

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    29/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Multi-Span Cable-Stayed Bridges

    Population of 1200 bridges

    Number of multi-span CS Bridges = 7

    Rion-Antirion Bridge,

    Greece

    Ting Kau Bridge,Hong Kong

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    30/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Multi-Span Extradosed Bridges

    Population of 63 bridges

    Number of multi-span Extradosed Bridges = 19

    Kiso and Ibi River Bridges, Japan

    Fl id

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    31/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Tower Height Expressed as H/L H = tower height

    L = Main Span Length

    For Cable Stayed:

    H/L 1/4 to 1/5

    For Extradosed:

    H/L 1/10

    Fl id

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    32/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Span/Depth Ratios for Extradosed Bridges

    For Girder Bridges:

    Constant Depth: S/D 22

    For Variable Depth:

    S/D 17 at pier S/D 50 at mid-span

    For Cable Stayed Bridges:

    Range of depth/span

    50-250

    For Extradosed Bridges:

    S/D 30 at pier

    S/D 50 at mid-span

    Fl id

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    33/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Typical Proportioning ParametersExtradosed Bridges

    Applicable Span Range: 200-900 ft.

    Side/Main Span Ratio: 0.6

    Tower Height/Span Ratio: 1:10

    Span/Girder Depth Ratio:

    Midspan 1:50

    At Tower 1:30 Applicable to multi-span bridges

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    34/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Aesthetics General Structural Arrangement

    Single Cable Plane Twin Cable Plane Three Cable Planes

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    35/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Aesthetics Stay Cable Arrangement

    Fan Cable Arrangement Harp Cable Arrangement

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    36/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Aesthetics Towers Arrangement/Shape

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    37/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Case Study

    Pearl Harbor Memorial Bridge, New Haven CT

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    38/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Project Overview

    Pearl Harbor Memorial Bridge (PHMB)

    38

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    39/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Opened - 1958

    Main Span 387 ft.

    Longest Plate Girder Spanin Western Hemisphere

    Existing PHMB

    39

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    40/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    40

    Designed for 40,000 VPD

    Currently over 140,000 VPD

    Functionally and Structurally Deficient

    Existing PHMB

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    41/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    Replacement Bridge

    41

    Increase from 6 lanes to 10 lanes

    Improved Safety

    Improved Navigation

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    42/82

    F D O T D E S I G N T R A I N I N G E X P O

    Florida

    Department of

    Transportation

    42

    Why an Extradosed Bridge for the PHMB? Longer Span Desired for Navigation

    Tower Height Restricted by Tweed Airport

    Girder Depth and Profile Controlled by Adjacent Interchange

    Economical Bridge Desired

    Bridge Worthy of Pearl Harbor Memorial Bridge Designation wasDesired

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    43/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    43

    Side Span / Main Span Ratio

    248.5/515.0/248.5 = 0.48 Ratio

    Recommended Ratio = 0.6Typical Range = 0.45 0.69

    Resulting Uplift = 570 kips (5% of the max. reaction)

    Counterweight Provided

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    44/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    Bridge Deck WidthGirder Cross Section

    Overall Roadway Width Varies 190-215 feet

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    45/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    Deck Depth / Haunch Arrangement

    Recommended Span/Depth

    At Tower = 25-35

    At midspan 50

    Provided Span/Depth At Tower =31.4 (16.4 depth)

    At midspan = 45

    (11.5 depth)

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    46/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    46

    Superstructure Cross-Section

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    47/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    47

    Transverse Post-Tensioning

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    48/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    Tower Height

    Suggested L/H = 10

    Selected 60 ft. tower

    height

    L/H = 8.6

    Wide Heavy Deck

    Limit Fatigue

    Demand on Stays

    Pearl HarborMemorialBridge

    Florida

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    49/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    49

    Tower Elevation

    Florida

    f

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    50/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    50

    Anchor Pier Elevation

    Florida

    D t t f

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    51/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    0.6 (15mm) Grade 270 Strand

    Greased and Individually Sheathed

    Co-extruded PE pipe

    Jacked Strand-by-Strand at tower

    Stay Design Stresses

    - 0.55 fs for AASHTO Group I

    - 0.60 fs other Load Groups

    - 0.60 fs construction or stay replacement

    Stay Cable Design Criteria

    51

    Florida

    D t t f

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    52/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    52

    Erection

    Florida

    D t t f

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    53/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    Form Traveler Construction

    53

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    54/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    54

    Main Span Construction Sequence

    54

    Stage 1 - Construction of Substructures and Pier Tables

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    55/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    55

    Main Span Construction Sequence

    55

    Stage 2 - Assembly of Traveling Forms

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    56/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    56

    Main Span Construction Sequence

    56

    Stage 3 - Balanced Cantilever Construction and Cable Installation

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    57/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    57

    Main Span Construction Sequence

    57

    Stage 4 - Continuation - Cantilever Construction

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    58/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    58

    Main Span Construction Sequence

    58

    Stage 5 - Closure at Side Span

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    59/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    59

    Main Span Construction Sequence

    59

    Stage 6 - Closure at Main Span

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    60/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    60

    Main Span Construction Sequence

    60

    Stage 7 - Finishing Works

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    61/82

    F D O T D E S I G N T R A I N I N G E X P O

    Department of

    Transportation

    Aesthetics

    61

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    62/82

    F D O T D E S I G N T R A I N I N G E X P O

    p

    Transportation

    62

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    63/82

    F D O T D E S I G N T R A I N I N G E X P O

    p

    Transportation

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    64/82

    F D O T D E S I G N T R A I N I N G E X P O

    p

    Transportation

    64

    Superstructure weight (ea. deck)= 54.2 klf

    Equivalent concrete depth for girder = 3.4

    Longitudinal Post-Tensioning= 11 psf

    Transverse Post-Tensioning= 0.9 psf

    Weight of stay cables= 3.5 psf

    KEY BRIDGE PARAMETERS AND QUANTITIES

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    65/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Contract B1

    Contract Award: April 2008

    Owner:

    ConnDOT

    Contractor:

    Cianbro/Middlesex JV III

    Designer:

    URS

    Program Manager:

    Parsons Brinckerhoff

    CE&I:

    Prime: Lochner

    Sub: FIGG

    Original Contract Value: $137,494,973

    Final Contract Value:

    $136,385,903

    Final Completion Date

    August 18, 2011

    34 days early

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    66/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Contract B

    Contract Award:

    July 2009

    Owner:

    ConnDOT

    Contractor:

    Walsh/PCL JV II

    Designer: URS

    Program Manager:

    Parsons Brinckerhoff

    CE&I:

    Prime: Lochner

    Sub: FIGG

    Original Contract Value:

    $416,691,984

    Current Contract Value:

    $416,805,470

    Current Completion Date

    June 30, 2015

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    67/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    67

    Tower Foundations: Drilled Shafts

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    68/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Tower Foundations

    Florida

    Department of

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    69/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Tower Construction

    Florida

    Department of

    T t ti

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    70/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Bridge Bearings

    Florida

    Department of

    T t ti

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    71/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Tower: Stay Anchor Box

    Florida

    Department of

    T t ti

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    72/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Pier Table Construction

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    73/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Pier Table Construction

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    74/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Out-of-Balance Supports

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    75/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Balanced Cantilever Construction with Form Traveler

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    76/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Balanced Cantilever Construction

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    77/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Side Span - Main Span Closure

    77

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    78/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Main Span Closure

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    79/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Northbound Bridge Opened 22June 2012

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    80/82

    F D O T D E S I G N T R A I N I N G E X P O

    Transportation

    Existing Bridge removed Southbound Bridge

    Scheduled for June 2015 Completion

    Florida

    Department of

    Transportation

  • 7/25/2019 Steven Stroh Extra Dosed Bridges

    81/82

    F D O T D E S I G N T R A I N I N G E X P O

    a spo tat o

    Concluding Remarks

    Extradosed Bridges

    Extradosed Bridges are an Emerging Technology

    Their practicality has been proven by numerous

    prototype bridges constructed in more than 25countries

    Economical in the 200-900 foot span range

    Advantageous for Multi-span Bridges

    Basic Proportioning Well Understood Stay Criteria Included in Latest PTI Specifications

    Have Opportunities for Unique Visual Presentations81