STREAM CROSSING RULES STREAM CROSSING RULES Env Env - - Wt Part 900 Wt Part 900 Application from the Application from the DOT Perspective DOT Perspective NHPWA Annual Meeting NHPWA Annual Meeting November 16, 2011 November 16, 2011
Transcript
Page 1: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

STREAM CROSSING RULES STREAM CROSSING RULES EnvEnv--Wt Part 900Wt Part 900

Application from theApplication from the DOT PerspectiveDOT Perspective

NHPWA Annual MeetingNHPWA Annual Meeting November 16, 2011November 16, 2011

Page 2: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bureau of Environment Stream Team

Kevin Nyhan, Senior Environmental [email protected]

Matt Urban, Environmental [email protected]

Christine Perron, Senior Environmental [email protected]

(603) 271-1553

Page 3: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Presentation Outline

1. Origin of the Rules and Introduction

2. Specifics on the Stream Crossing Rules

3. DOT Implementation

4. Sample DOT Projects

5. Questions

Page 4: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Origin of the Rules and Introduction

Page 5: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

History

Process began in 2006

Army Corps of Engineers directive

NH Stream Crossing Guidelines

Rules Workgroup

Rules effective May 12, 2010

Page 6: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design
Page 7: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Why Stream Crossing Rules?

Nationwide movement

Rivers move water, sediment, debris and are home to aquatic organisms

Move from hydraulic-only designs to designs that accommodate sediment transport

Estimated 17,000 culverts in NH (3,000 active dams (approx.))

Page 8: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Enhance public safety by establishing standards to:

Lessen the risk of blockages/flooding/wash-outs

Preserve the functions and values of existing streams

Restore stream channels to a more natural state

Improve aquatic organism (AO) passage

Purpose of Rules

Page 9: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

From Top-of-Bank to Top-of-Bank and everything in between

DES Jurisdiction (No Change)

Ordinary High Water

Top-of-Bank

Page 10: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

“The bankfull stage corresponds to the discharge at which channel maintenance is the most effective, that is, the discharge at which moving sediment, forming or removing bars, forming or changing bends and meanders, and generally doing work that results in the average morphologic characteristics of channels.” (Dunne & Leopold 1978)

The incipient elevation where flooding into a floodplain begins.

Bankfull Stage

Page 11: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bankfull Stage

Page 12: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bankfull Stage

Rivers form their banks and channel at the bankfull stage about every 1.5 years

Page 13: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bankfull Stage

Bankfull

Page 14: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bankfull Stage

Bankfull

Top-of-Bank

Ordinary High Water

Page 15: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Bankfull Stage

Normal Flow Bankfull Flow

Page 16: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Specifics of the Stream Crossing Rules

Page 17: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

A ‘watercourse’ is a surface water that:

Develops and maintains a defined channel, with evidence of sediment transport, and

Is greater than 75’ in length, or is any length and connected to a wetland or other surface water at either end

Rules apply to “watercourses”

Page 18: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

The crossing is located in a drainage swale, or ephemeral stream (only wet when it rains)

Rules do NOT apply, if…

The crossing qualifies for Routine Roadway Maintenance

Page 19: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Rules do NOT apply, if…

Page 20: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

SB21 amended RSA 482-A:3,IV(b) so that… Man-made nontidal drainage ditches roadside and railroad ditches detention basins ponds and wetlands constructed to convey,

treat, or control stormwater and runoff erosional features caused by human activity

…may be maintained, repaired, replaced, or modified as necessary without a permit from DES.

You cannot impact any other jurisdictional area

As a matter of fact…

Page 21: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

How do the stream rules apply?

Page 22: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

General Design Considerations

All stream crossings shall:

Allow the movement of sediment & AO

Not increase freq. of flooding;

Maintain existing low flows;

Preserve/ restore watercourse connectivity;

Not cause water quality degradation

Not cause scour or aggradation

Page 23: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tiers Based System: Contributing Watershed

Page 24: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

USGS StreamStats

http://water.usgs.gov/osw/streamstats/new_hampshire.html

Page 25: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1

Contributing watershed less than 201 acres

Meet general design considerations

Accommodate 50-yr storm or other applicable reg.

Any type of structure (culvert/bridge);

Construct during low flow

Use BMPs during construction

Page 26: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1

Repair/rehabilitation available (explained later)

Compensatory mitigation not required, unless the general design considerations cannot be met, pursuant to the repair/rehabilitation section

Page 27: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2Contributing watershed from 201 ac - 639 ac

Specific design criteria (explained later)

Span structure (bridge), embedded pipe arch. open bottom culvert, embedded closed culvert

Stream simulation

Page 28: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2

In-kind replacement available (explained later)

Alternative design available (explained later)

Repair/rehabilitation available (explained later)

Plans stamped by a Professional Engineer

Construct during low flow

Use BMPs

Page 29: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2

Compensatory mitigation not required for:

Crossings that meet specific design criteria Repair/rehabilitated In-kind replacements

Page 30: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 3

Contributing watershed greater than 639 ac

Designated river corridor (1/4 mile)

Impairments Benthic macroinvertebrate index Fish assemblage index Habitat assessments Stream channel stability

Page 31: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 3100-year floodplain

Natural Heritage Bureau (NHB) record

Prime wetland or buffer

*Tier 3 Kick out (impairments, NHB record or 100-year floodplain)

Page 32: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 3

Span structure (bridge), or open bottom culvert

Stream simulation

Alternative design available

Plans stamped by a Professional Engineer

Construct during low flow

Use BMPs

Page 33: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 3

Compensatory mitigation not required for

Self-mitigating crossing Conforms to NH Stream Crossing Guidelines

Page 34: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2 & Tier 3 Design Criteria

NH Stream Crossing Guidelines

Water depth and flow in crossing same as natural channel

Vegetated banks on both sides of the watercourse for wildlife passage

Preserve natural alignment and grade of stream for natural flow and access to floodplain

Page 35: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2 & Tier 3 Design CriteriaAccommodate 100-year flood so that:

No increase in flood stages for abutters Sediment transport not negatively affected

Simulate a natural stream channel

Page 36: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1 & Tier 2 Repair/Rehabilitation

Can only be repaired/rehabilitated if the crossing does not have a history of causing or contributing to flooding

Concrete repair, slip lining, cured-in-place lining, concrete invert lining

Slipline shall only occur once

Page 37: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1 & Tier 2 In-Kind Replacement

Can only be repaired/rehabilitated if the crossing does not have a history of causing or contributing to flooding

Replacement is same size as existing or an upgrade (closed bottom culvert to an open bottom culvert)

Meet general design considerations

Not diminish hydraulic capacity

Not diminish aquatic organism passage, OR

Page 38: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1 & Tier 2 In-Kind Replacement

Replacement does not adversely affect stream channel, or stream bank stability; and

Not cause an increase in flooding or overtopping of banks

Could require compensatory mitigation

Page 39: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Replacing Tier 3 Crossings

Comply with design criteria for Tier 2 & Tier 3 crossings

Alternative design allowed

Page 40: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Alternative Designs If installing the structure required by rule is not “practicable,” propose an alternative

Written request accompanied by a “technical report”

Page 41: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Alternative Designs New/replacement Tier 2 & Tier 3 Crossings

Technical report demonstrates that adhering to the rules is not practicable

Meets specific design criteria to “maximum extent practicable”

Meets general design considerations

Page 42: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Alternative Designs

New/replacement Tier 1 Crossing

Technical report demonstrates that adhering to the rules is not practicable

Meets general design considerations to “maximum extent practicable”

Page 43: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Practicable

“Practicable means available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes.” (Env-Wt 101.73)

Page 44: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

DOT Implementation

Page 45: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design
Page 46: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Information at Crossing

Page 47: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Estimating Bankfull Conditions Flow Area Width Depth

2005 Regional Hydraulic Geometry Curves (provisional)

Page 48: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Reference Reach Bankfull width & bankfull depth

Entrenchment ratio

Sinuosity

Floodprone width

Longitudinal profile

Cross sections

Pebble count

Page 49: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Reference Reach

Page 50: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Fluvial Geomorphic Report

Page 51: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Engineering / Hydraulics

Drainage calculations Drainage area Soil type 25-year, 50-year, 100-year flows

Hydraulic calculations Headwater Outlet water velocity

Page 52: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

When is a Fluvial Geomorphic Assessment Required?

New Tier 2 Crossings

Tier 2 repair/rehabilitation where there is a flooding history

Tier 2 replacement where there is a flooding history

All new/replacement Tier 3 Crossings

Page 53: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Rehabilitation/Modification of Tier 2 & Tier 3 Crossings

Rules are silent on rehabilitation of Tier 3 crossings and modifications to Tiers 1, 2 & 3 crossings

Repair/rehabilitation of Tier 3 crossings need to comply with the General Design Considerations insofar as possible

Modifications use Alternative Design process

Page 54: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Rehabilitation/Modification of Tier 2 & Tier 3 Crossings

Redefine “replacement” or add a definition for “upgrade or improvement”

Define “modification”

Adopt rules for “modification of existing crossings,” and “rehabilitation of Tier 3 crossings.”

Page 55: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Information Required for Stream Crossing Application

Dewatering system Flow estimates Diversion dam and sump locations Backwater prevention methods Sediment treatment plan

Erosion and pollution controls

Construction Sequence

*Not available at the time of application

Page 56: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Information Required for Stream Crossing Application

Contractor-prepared and –submitted SWPPP

Conditioned permits subject to review and approval by DES

DOT working toward supplying this information in advance for project development

Page 57: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Conditions

Personnel

Detail of data

How Long Does It Take?

Page 58: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

For an average wadable Tier 2/3 stream…

3 hrs. to complete pre-survey review 24 hrs. to survey crossing & reference reach 10 hrs. to crunch & input data into CAD/D 3 hrs. to generate a report for Design Does not include hydraulic/drainage calculations

How Long Does It Take?

Page 59: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Nothing from NH Stream Crossing Guidelines

Wolman Pebble Count

Cross Section Analysis

Wetted Perimeter Cross-Section Analysis

Pebble Counts

Page 60: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pebble Counts

Page 61: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 1 stream crossing shall accommodate the greater of the 50-year frequency flood or other applicable standard

Tier 2/3 stream crossing shall accommodate the 100-year frequency flood

Accommodate does NOT mean “pass through the structure without headwater conditions.”

What Does “Accommodate” Mean?

Page 62: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

It means you know where the flood water will go, and your design has taken it into consideration…

Roadside ditches Backwater onto adjacent land Over the road (which has been hardened) Overflow culvert Floodplain culvert Under or through the structure

What Does Accommodate Mean?

Page 63: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

What Does Accommodate Mean?

Page 64: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2 & 3 crossings shall provide… “a vegetated bank on both sides of the watercourse to allow for wildlife passage.”

Vegetated Banks

Page 65: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Tier 2 & 3 crossings shall provide… “a vegetated bank on both sides of the watercourse to allow for wildlife passage.”

Vegetated Banks

Page 66: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Academic community, Dr. Ballestero, UNH, indicated rules for freshwater only

DES applies rules to saltwater systems

Saltwater Systems

Page 67: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

DOT Stream Crossing Projects

Page 68: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Swanzey Bridge 150/056 (Tier 3 Modification)

Page 69: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Existing Tier 3 concrete slab bridge, 25’ wide

Watershed: 5,500 ac (8.6 sm)

Project to widen bridge to facilitate rehabilitation (traffic control)

Swanzey Bridge 150/056

Page 70: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Swanzey Bridge 150/056

Page 71: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Specifics (reference reach):

Field Collected Calculated (for info.) Wbf = 26.0’ Wbf = 35.7’ Dmaxbf = 2.4’ Dmaxbf = 2.3’

Technical report (qualitative), no fluvial geomorphic assessment required

Alternative design

Swanzey Bridge 150/056

Page 72: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Wakefield, Farnham Brook (Flooding History vs. No Flooding History)

Page 73: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Existing Tier 2 concrete box culvert 3’ H x 6’ W

Project proposed to replace the culvert

No flooding history

Wakefield, Farnham Brook

Page 74: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Wakefield, Farnham Brook

Page 75: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

At Crossing:

Field Collected Wbf = 16.2’ Dmaxbf = 3.3’

Reference reach:

Field Collected Calculated (for info.) Wbf = 8.9’ Wbf = 12.4’ Dmaxbf = 0.7’ Dmaxbf = 1.3’

Wakefield, Farnham Brook

Page 76: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

“In-kind replacement or upgrade” Proposed 3’ X 8’ box (embedded 1’)

However, if there were a flooding history: Stream Crossing Design Guidelines

Span: 1.2 X Wbf + 2’ or 14-foot span, or open bottomed or embedded culvert based on reference reach…essentially A BRIDGE

Wakefield, Farnham Brook

Page 77: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Stratham, Jewell Hill Brook (Saltwater Stream Crossing)

Page 78: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Existing 42’L x 66” dia. Tier 3 pipe arch

Tidal river

Stratham, Jewell Hill Brook

Page 79: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Crossing outlet: Field Collected

Wbf = 24.8’ Dmaxbf = 4.0’

Reference reach: Field Collected Calculated (for info.)

Wbf = 25.4’ Wbf = 14.2’ Dmaxbf = 6.8’ Dmaxbf = 1.4’

Stratham, Jewell Hill Brook

Page 80: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Proposed 40’ L X 8’ dia. plastic pipe embedded 18”

Waiver of stream crossing rules included NH Coastal Program (DES) suggested that rules should not apply to tidal streams

Alternative Design

Stratham, Jewell Hill Brook

Page 81: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis River (Watershed Size Estimate)

Page 82: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis RiverExisting 16.8’ span Tier 2 bridge

No flooding history

Page 83: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis River

Page 84: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Crossing outlet: Field Collected

Wbf = 14.7’ Dmaxbf = 1.8’

Reference reach Field Collected Calculated (for info.)

Wbf = 23.9’ Wbf = 10.4’ Dmaxbf = 2.2’ Dmaxbf = 1.2’

Pinkham’s Grant, Ellis River

Page 85: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis River

Page 86: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis RiverProposed 20’ span bridge

Replacement / upgrade of existing Tier 2

Fully compliant with rules

Courtesy of AEWC

Page 87: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Pinkham’s Grant, Ellis RiverUnder construction now

Courtesy of AEWC

Page 88: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

North Hampton, Winnicut River (Wide Channel w/ Vegetation)

Page 89: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

North Hampton, Winnicut RiverEmergent wetland adjacent to flowing water

Elevation of ground surface at the boundary between the wetland and the open water

Grasses mark decrease in flow velocity of moving water

- Shane Csiki, DES

Page 90: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

North Hampton, Winnicut River

Page 91: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows Brook (Alternative Reference Reach)

Page 92: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows BrookExisting 5’ corrugated metal pipe arch, Tier 3

8 square mile watershed

Calculated Wbf = 36’

Page 93: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows BrookConvergence of two streams (Kelsey Brook andNarrows Brook

Page 94: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows BrookUpstream reference reach was vastly differentthan stream at crossing

Page 95: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows BrookKelsey Brook reference reach

CollectedReference Reach

Crossing

Page 96: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

Northwood, Narrows Brook

Similar watershed area

Similar geographic location

Similar topographic location

Similar substrate material

Similar vegetative conditions

Similar stream gradient

Page 97: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design

To Date…

2-Tier 3 Replacement 2-Tier 3 Repair / modification 3-Tier 2 In-kind replacement / upgrade 1-Tier 1 Repair / rehabilitation 3-Tier 1 In-kind replacement / upgrade 1-Tier 1 Repair / modification

16 Assessments in 2010 13 Assessments in 2011

Page 98: STREAM CROSSING RULES Env-Wt Part 900 - NH.gov · STREAM CROSSING RULES Env-Wt Part 900 . ... Replacing Tier 3 Crossings . Comply with design ... 3 hrs. to generate a report for Design