Strengthening of ZeTo Rules Compliance by Petronas Chemical

Date post: 08-May-2015
Category:
Upload: moon-girl
View: 2,188 times
Download: 33 times
Share this document with a friend
13
Strengthening of ZeTo Rules Compliance across Downstream Business Communication Pack © 2012 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. 1 st October 2012 NOTE Where differences exist between the English version and the Malay version, the English version shall be followed.
Transcript
Page 1: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Strengthening of ZeTo Rules Compliance across Downstream Business

Communication Pack

© 2012 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

1st October 2012

NOTE

Where differences exist between the English version and the Malay version, the English version shall be followed.

Page 2: Strengthening of ZeTo Rules Compliance by Petronas Chemical

PETRONAS Management Committee endorsed 10 ZeTo Rules in May 2010

ZeTo stands for Zero Tolerance, a principle to ensure all activities are carried out in a safe manner and any non-compliance is not tolerated.

•aim to ensure all high risk activities are carried out safely.

•must be complied with at all times by all employees and contractors.

•intended to supplement safety rules and regulations imposed by PETRONAS, its Operating Units (OPUs) and Holding Company Units (HCUs) and any laws and regulations applicable at the location where the works are being carried out which must also be observed at all times.

2

INTRODUCTION

Page 3: Strengthening of ZeTo Rules Compliance by Petronas Chemical

PETRONAS Management Committee endorsed 10 ZeTo Rules in May 2010

All PETRONAS employees and contractors’ personnel shall follow ZeTo Rules at all times whenever they are in the company’s premises or when carrying out company business.

For the rule relating to the use of walkie-talkie, mobile phone, seat belts and speed limit, it will be applicable at all time to the employees and contractors operating company’s owned/hired/leased vehicles whether inside or outside the company’s premises. It is also applicable to those who are travelling on business.

Existing safety rules and regulations shall continue to be abided..

3

INTRODUCTION

Page 4: Strengthening of ZeTo Rules Compliance by Petronas Chemical

As stated by GHSED

4

Effective implementation of ZeTo Rules means the rules are understood and abided by all staff and

contractors’ personnel

ACCOUNTABILITY

Page 5: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Ten (10) ZeTo Rules

5

INTRODUCTION

1

2

3

4

5

6

7

8

9

10

TuahZeTo TuahZeTo

TuahZeTo TuahZeToZeTo Video

Page 6: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Concerns with the current practices

Since it was launched in 2010, awareness on the criticality of non-compliance to ZeTo Rules is still low with lack of enforcement.

7

CASE FOR CHANGE

Current Observations

•Consequence Management of ZeTo Rules non-compliance differs from OPU to OPU.

•Most ZeTo Rules violations at OPUs were reported during Plant Turnaround or specific campaign.

•Statistic from January to August 2012 shows there is a lack of reporting from some OPUs.

Page 7: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Strengthening of ZeTo Rule Compliance by the following enhancements.

In May 2012, concern has been raised during DEC meeting, resulting in the formation of a Compliance Management taskforce

8

INTERVENTION

Objectives of Taskforce

Ensure consistency in ZeTo Rules Compliance Management

Clear process flow

Clear responsibility & accountability

Disciplinary action guideline

Applicability of the process flow

Promote ZeTo Rules compliance

All PETRONAS personnel and contractors MUST

COMPLY to the 10 ZeTo Rules

Page 8: Strengthening of ZeTo Rules Compliance by Petronas Chemical

The ZeTo Rules Violation Consequence Management Process will govern both PETRONAS staff and Contract staff.

Action Owners for Consequence Management

ZeTo Rules Violation Consequence Management Process Flow for violation that resulted in incident

9

Staff

Contractors

• Offender is subjected to DAPP and ZeTo Rules Disciplinary Action Guideline by HRM

• Action to be taken by Contract Owner

1. Offender will be banned from entering company facility indefinitely

• Warning letter will be issued to offender’s company and copy to Plant Head, HOD and ZeTo Secretariat

• Non-compliance will be recorded in Main contractor’s HSE performance database

IMPORTANTAll violation to ZeTo Rules observed during Behavioural Safety (BS) observation should not be recorded in the BS observation form, but MUST BE CAPTURED according to the ZeTo Rules Violation Consequence Management Process.

ZeTo RULES COMPLIANCE MANAGEMENT

Page 9: Strengthening of ZeTo Rules Compliance by Petronas Chemical

ZeTo Rules Violation Consequence Management Process Flow for Contractors

Observe contractor

breach ZeTo Rules

Observe contractor

breach ZeTo Rules

Approach and tell Contractor to stop work/act

Approach and tell Contractor to stop work/act

Stop work/act and comply to ZeTo

Rules

Stop work/act and comply to ZeTo

Rules

Fill in UA/UC (or equivalent) form and submit / copy to

HSE Manager

Fill in UA/UC (or equivalent) form and submit / copy to

HSE Manager

Verify the violation and

coach offender

and ensure offender sign the relevant

form.

Verify the violation and

coach offender

and ensure offender sign the relevant

form.

Action by Contract OwnerTo ban the Offender from entering company facility min. one(1) mth

Action by Contract OwnerTo ban the Offender from entering company facility min. one(1) mth

Action by Contract Owner1.To ban the Offender from entering company facility indefinitely2.To issue warning letter to offender’s company and copy to Plant Head, HOD and ZeTo Secretariat3.To record the non-compliance in Main contractor’s HSE performance database

Action by Contract Owner1.To ban the Offender from entering company facility indefinitely2.To issue warning letter to offender’s company and copy to Plant Head, HOD and ZeTo Secretariat3.To record the non-compliance in Main contractor’s HSE performance database

YES

No

Submitcompleted

form to Contract Owner

and copy to Plant Head, HOD and

ZeTo secretariat

Submitcompleted

form to Contract Owner

and copy to Plant Head, HOD and

ZeTo secretariat

Observer

Contractor

HSE Manager

Submitcompleted form

to Contract Owner and

ZeTo secretariat

Submitcompleted form

to Contract Owner and

ZeTo secretariat1st

offence?

Repeated offence

Repeated offence

1 2

3

4

5

6

8

10

7

9

TIMELINESteps 1-9 must be completed within 24 hours.

ZeTo RULES COMPLIANCE MANAGEMENT

Page 10: Strengthening of ZeTo Rules Compliance by Petronas Chemical

ZeTo Rule Violation Consequence Management Work Process

The ZeTo Rules consequence management work process is applicable to all PETRONAS employees and contractor ’personnel who violate any of the ten (10) ZeTo Rules at any times whenever they are in the company’s premises and subjected to ZeTo Rules disciplinary action guideline.

SUMMARY:

•ZeTo Rule #1 to #8 violations within company premises shall be subjected to ZeTo Rules disciplinary action guideline.

•ZeTo Rule #9 and #10 violations in the process area shall be subjected to ZeTo Rules disciplinary action guideline. Process area as per OPU definition.

EFFECTIVE date of implementation: 1st January 2013

11

APPLICABILITY

NOTE:

1.The offender of ZeTo Rule #9 - outside of process area shall follow the existing OPU consequence management.

2.The offender for of ZeTo Rule #10 - outside process area and outside company premises during business travel shall follow the existing OPU consequence management.

3.The offender for other safety rules and regulation shall follow the existing OPU consequence management.

Page 11: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Activities to be carried out by Hauliers to ensure consistency in implementation

12

PROMOTING COMPLIANCE

Communication • Cascading the communication pack

o DOD OPU MC staff, security & contractors subcontractors

• Ensure attendance is recorded and copied to CLD dept.

• To be incorporated in the driver’s safety briefing.

11

Page 12: Strengthening of ZeTo Rules Compliance by Petronas Chemical

Thank you.

- End of Presentation -