+ All Categories
Home > Business > Strikemaster final v1 06-30-13

Strikemaster final v1 06-30-13

Date post: 28-Jul-2015
Category:
Upload: anne-frankl
View: 202 times
Download: 9 times
Share this document with a friend
10
Vertical Strikemaster R
Transcript
Page 1: Strikemaster final v1 06-30-13

VerticalStrikemaster R

Page 2: Strikemaster final v1 06-30-13

HighStrikemaster R

Page 3: Strikemaster final v1 06-30-13

MediumStrikemaster R

Page 4: Strikemaster final v1 06-30-13

StrikemasterLow

R

Page 5: Strikemaster final v1 06-30-13

GroundStrikemaster R

Page 6: Strikemaster final v1 06-30-13

Striking Surface

Power Post Attachment

Flex Core Cap

Flex Core

Power Post

Octa-Base assembly

Strikemaster R

Attachment & dampening tape

Cuff tape

Cap attachment

tape

Page 7: Strikemaster final v1 06-30-13

Octa-Base Bottom

Fixture Plate

Power Post Fixture

Foam Safety Ring

Octa-Base Top

Octa- Base assemblyStrikemaster R

Page 8: Strikemaster final v1 06-30-13

Octa- Base assemblyStrikemaster R

Page 9: Strikemaster final v1 06-30-13

StrikemasterAccessories

Power Post Extension

Power Post ExtensionCoupler

Street Elbow

R

Page 10: Strikemaster final v1 06-30-13

StrikemasterAccessories

Octa-Base Handle

Sandbags (4x)

R


Recommended