STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING Senior Honors Project Shane Halverson Mentor: Derek Swanson The overall goal of this project was to obtain a thorough understanding of structural system design and construction. This was accomplished by studying the four phases a structural project goes through; schematic design, design development, construction documents, and construction administration. After gaining a thorough understanding of these four phases the knowledge was applied to design an entire structural system for a four story office building located in Cheyenne, WY. This system was designed in accordance to all applicable codes.
Transcript
Page 1: Structural Design for a Low Rise Office Building

STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING

Senior Honors Project

Shane Halverson

Mentor: Derek Swanson

The overall goal of this project was to obtain a thorough understanding of structural system

design and construction. This was accomplished by studying the four phases a structural project

goes through; schematic design, design development, construction documents, and construction

administration. After gaining a thorough understanding of these four phases the knowledge was

applied to design an entire structural system for a four story office building located in Cheyenne,

WY. This system was designed in accordance to all applicable codes.

Page 2: Structural Design for a Low Rise Office Building

Table of Contents

Introduction…………………………………………………………………………..3

Body of Paper………………………………………………………………………...4

Background…………………………………………………...........................4

Research…………………………………………………………………........5

Engineer’s Timeline…………………………………………………..5

Phases of Typical Building Project…………………………………...6

Design Process………………………………………………………..6

Applying What We Learned………………………………………………….7

Schematic Design…………………………………………………….7

Design Development…………………………………………………8

Construction Documents……………………………………………..9

Construction Administration………………………………………...10

Calculations………………………………………………………….11

Conclusion…………………………………………………………………...11

Appendix A…………………………………………………………………………..13

Appendix B…………………………………………………………………………..18

Appendix C…………………………………………………………………………..25

Appendix D…………………………………………………………………………..32

Appendix E…………………………………………………………………………..35

Page 2

Page 3: Structural Design for a Low Rise Office Building

STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING

Introduction

As society advances, the built environment becomes an ever increasing component of

everyday life. As a result, buildings and their design are becoming a very scientific field. Buildings

can be as simple as four walls and a roof or as complicated as hundred story skyscrapers. Either

way there is an art to the design and construction of buildings.

Typically, people only see the outside of a building, or the “skin.” However, there is much

more to a building then stone and windows. Buildings can be looked at much like living, breathing

human beings. On the outside is a smooth skin, but under that skin are several different systems

working together in perfect harmony to make life possible. The mechanical system of a building

is like the respiratory system in a body. It is responsible for bringing in fresh air, along with

conditioning each space to the right temperature. The electrical system is much like the nervous

system in a body. It “keeps the lights on” and allows the building to function smoothly. The system

this project focuses on is the structural system. The structural system of a building is exactly like

the skeletal system in a body. The structural system is responsible for making the building stand

and stay standing, even in extreme conditions.

Page 3

Page 4: Structural Design for a Low Rise Office Building

STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING

Body of Paper

The overall goal of this project was to obtain a thorough understanding of structural system

design and construction. This was accomplished by studying the four phases a structural project

goes through; schematic design, design development, construction documents, and construction

administration. After gaining a thorough understanding of these four phases the knowledge was

applied to design an entire structural system for a four story office building located in Cheyenne,

WY. This system was designed in accordance to all applicable codes. The project is discussed in

depth within the background, research, applying what we learned and conclusion sections.

Background

This project was conducted in conjunction with the University of Wyoming Architectural

Engineering Capstone class ARE 4720. This class is designed to give students real world

experience in a classroom setting. Students are broken into teams of 2 to 3, and each team is

required to design the entire structural system for a given building. The building for this year’s

capstone class was a new student center for the Laramie County Community College campus

located in Cheyenne, Wyoming. The building will be used for various purposes and will contain

offices, classrooms, and some student services.

The capstone class is designed to be students’ final class prior to graduation. Therefore,

students within the class have a good understanding of various structural systems. Students at this

stage in their education also have a solid understanding of how buildings function, along with how

the various systems within a building interact. The intent of the capstone class is to connect all the

individual items students have learned. It is also designed to give students exposure to how an

Page 4

Page 5: Structural Design for a Low Rise Office Building

actual construction project takes place. Students are not required to design an entire building but

rather a component of that building as they would if they were working for an engineering firm.

The class begins the semester by researching the construction process, where students gain

a better understanding of how a project goes from conception to construction. After the initial

research component, the class is divided into four phases as a real construction project would be,

and each phase had a submittal associated with it. The remainder of this paper will follow the

layout of the class.

Research

This project began with research on the construction process. We looked at how one

person’s idea becomes a finished project, paying special attention to the structural engineer’s role

within the overall project scope. Our findings are summarized in the engineer’s timeline, phases

of typical building project, and design process sections.

Engineer’s Timeline. Although a building may take a few years to complete, the structural

engineer is not involved with the project the entire time. Depending on the complexity of the

structural system, and whether it is a focal point or if it is hidden in the background, the structural

engineer is only “actively” involved in about 25-50% of the entire project. Typically, they are

subcontracted to the architect and do not come into the project until both the owner and the

architect have a good understanding of the overall building design. This means the structural

engineer typically has little say in the overall appearance of the project.

Once the structural system erection is complete, the structural engineer is mostly done with

the project. Occasionally the engineer will receive questions resulting from a design change or a

potential issue, but the majority of the engineer’s responsibility is complete at this point.

Page 5

Page 6: Structural Design for a Low Rise Office Building

Phases of Typical Building Project. Our research revealed that there are four main phases

a typical building project goes through. These phases are as follows: Schematic Design, Design

Development, Construction Documents, and Construction Administration. The first three phases

are all preconstruction. Only the fourth phase directly deals with the actual construction of the

building and specifically the structural system. Each of the first three phases takes the design

progressively more towards the final design. The design is done in a progressive manner so that a

rough idea of the overall project costs can be estimated as early as possible. Other aspects of the

project are continually undergoing revision as well, so it would not make sense to design the entire

structural system at once only to have the building design change, which would require the system

to be completely redesigned.

Design Process. In addition to the four specific project phases described above, there is

also a design process that is incorporated. The first step is to choose a structural system. This is

perhaps the most important step in the entire process. Building size, use, and desired structural

aesthetics are key factors in deciding which type of structural system to utilize.

Once a structural system is chosen and the project location is known, the next step is to

find all applicable codes. Different regions, states, and municipalities work under different codes.

Following the correct codes is crucial for there are legal consequences if every code is not followed

exactly as written.

The third step is to calculate the loads. Buildings are exposed to two main types of loads,

which are gravity and lateral loads. Gravity loads act in the vertical direction and are the result of

the weight of the building and its contents. Lateral loads act in the horizontal direction and are the

result of wind or seismic factors. During this stage the loads are very roughly calculated as the

Page 6

Page 7: Structural Design for a Low Rise Office Building

actual building material and structural component weights are not yet known. These first three

steps are all incorporated into the schematic design.

Once a rough idea of the loading is known, member sizing can begin. This is typically

contained within the design development phase. The construction document deals with precisely

sizing each and every structural member along with all the connections between members.

Once all the members are properly sized, the actual construction documents can be created.

This is a set of blueprints with all the information required to build and erect the structural system.

At this point the design process is complete. However, there is one more phase in the project. For

the structural engineer, this phase is known as the construction administration phase. During this

portion of the project the engineer is responsible for handling any questions that arise. These

questions may be on constructability of the system or how to solve a problem that has arisen in the

field.

Applying What We Learned

The second half of the class project is to actually apply not only what we learned in the

initial research, but everything we have learned over our entire scholastic career. We applied the

knowledge we have gained to design the entire structural system for the four story building that

was previously mentioned. This process was broken into the four design phases previously

introduced; schematic design, design development, construction documents, and construction

administration, along with a section dedicated to calculations.

Schematic Design. For our schematic design submittal, we were required to provide an

executive summary of our intended structural system, state applicable building codes, give load &

design criteria, and give details on our intended structural system. The first step in accomplishing

these tasks was to select an appropriate structural system. There are countless systems that would

Page 7

Page 8: Structural Design for a Low Rise Office Building

work in this situation, including mass timber, concrete, and reinforced masonry. My partner and I

chose to use a structural system comprised of steel columns, girders, and beams, working in

conjunction with a mixture of concrete shear walls and braced steel frames. This is a very common

system for a building of this scale and usage. It is also a very popular system in this part of

Wyoming. These two factors contribute to reducing the overall construction costs for the project.

The first step was to determine the necessary codes. Since the building is located within

the city limits of Cheyenne, the City Council of Cheyenne is the governing body. Therefore, the

governing building code is the 2015 version of the International Building Code (IBC). ASCE 7-

10 also governs and is closely tied to the IBC.

The next step was to establish our load and design criteria. This includes factors such as

our Flat Roof Snow Load, which we calculated to be 21 psf, our Basic Wind Speed, which was

found to be 115 mph, and our seismic factors, which were found to be Ss = 0.155g and S1 = 0.036g.

The seismic factors were found using the United States Geological Services website.

The final step of the first phase was to discuss the details of the intended structural system.

This included details on the foundation design based on the given geotechnical report, along with

typical framing information. The lateral system and the interaction between its two different parts

were also discussed. All the details of the schematic design submittal are located in Appendix A,

which contains the entire submittal.

Design Development. The second required submittal for this project was the design

development or DD submittal. As discussed earlier, this submittal builds on where the SD

submittal left off. The deliverables were an entire set of plans for the building, including a

foundation plan. Also required were detail drawings showing specific areas of the buildings where

the interaction between components may not have been entirely clear. The first step in

Page 8

Page 9: Structural Design for a Low Rise Office Building

accomplishing the task for this submittal was to lay out the framing. This was challenging because

the building was not square and each level changes slightly. The framing layout was further

complicated by the way the architect laid out each floor. The building contains several slanting

hallways and other challenging aspects that make column layout difficult.

To complete the layout, the structural framing building was drawn in the 3D modeling

program Revit. Gridlines were then added to create rectangular spaces that were easily broken into

framing bays. Columns were then placed at most of the gridline intersection points. Unfortunately,

due to the inconsistency of hallways and rooms from one floor to the next, there are a couple

columns that are not continuous from the foundation to the roof. This resulted in the need for a

transfer beam, a very deep steel member, to transfer the load from the upper column to the lower

columns.

Once a justifiable framing plan was created, rough member sizing could be done. In order

to accomplish this, the tributary area for each member is calculated and the load acting on that area

is found. This gives the total load acting on the member, which can then be used to determine how

big the member needs to be in order to successful carry the load. For additional information on the

contents of the DD submittal, please see appendix B, which contains the entire DD submittal.

Construction Documents. The third phase of this project was creating the construction

documents. This package contains everything necessary to fabricate and construct the structural

system for this building. The first step in this process was reviewing the feedback from the DD

submittal. The feedback implied that some of our detail drawings were not clear enough to be

constructed, so that was remedied. Once we had made the necessary changes to existing plans, we

moved into completing the new tasks.

Page 9

Page 10: Structural Design for a Low Rise Office Building

The biggest challenge with the CD submittal was presenting all of the necessary

information in a clear manner due to the limited amount of space on the plans, and each member

needed to be labeled and dimensioned. In order to clearly present all necessary information, plan

notes were used as much as possible. Each member was labeled as clearly as possible and specific

attention was paid to minimizing the use of leader lines. The CD plans have a much higher level

of detail and are very clearly explained, whereas the DD plans gave a good indication of member

location but were not completely buildable. For your convenience, the complete CD submittal has

been included in Appendix C.

Construction Administration. The fourth phase of the project was the Construction

Administration phase. On a real project this phase is during the actual construction of the building.

During the CA portion of the project the engineer has already completely design all necessary

elements for the structural system to be erected. The engineers job during the time the structural

system is erected is to solve any problems that arise. Perhaps a coordination issue causes a pipe

and a beam to be at the same height. The structural engineer would be responsible for finding a

solution.

For our CA submittal we were required to solve a theoretical problem. The problem was

that one of the shear tabs, the component that connects the girder to the column was installed 1”

too low. As a result, the bolt holes did not line up on the girder. Students were required to respond

to the Request For Information sent out about the problem with a reasonable solution. The solution

my team came up with was welding the shear tab to the girder. A 12” long, 3/16” weld was strong

enough to withstand the loading. For corresponding calculations and a detailed drawing solution

please the RFI and our solution in Appendix D.

Page 10

Page 11: Structural Design for a Low Rise Office Building

Calculations. The final submittal of our project was the calculations submittal. On a real project

the calculations would have needed to be done prior to the construction document phase. Although

these calculations are typically never “submitted” because contractors only need the results, within

the scope of the classroom setting submitting calculations was critical. Our calculations package

included all of the math required to size the structural components for the building. Both hand

calculations along with computer calculations were utilized. All computer calculations were

performed in Microsoft Excel. Excel enabled us to make adjustments without having to redo all of

our equations, however each formula in excel had to be created and programed by us.

Not every member and connection in the entire building was included within our

calculations submittal. The submittal includes one of each typical component. This includes one

column, beam, girder, connection, interior footing, and column base plate. Also required in the

calculations submittal was all the applicable loading condition calculations for factors such as

snow, wind and snow. Altogether the calculations package is roughly 27 pages. There are a few

discrepancies between the construction documents submittal member sizes and the calculations

submittal member sizes. This is due to the calculations not being entirely done when the CD

submittal was due. In a real world setting the calculations would have to be completed and then

the results are ‘published’ in the CD submittal. The calculations submittal has included in

Appendix E for your convenience.

Conclusion

Structural design is not an easy process. It is very complicated due to the numerous

factors that contribute to the various loads. However, it is a process that can be broken down into

a few, very systematic steps. Overall structural design is truly an art; an art which requires both

analytical and creative inputs. There are several considerations that go into designing structural

Page 11

Page 12: Structural Design for a Low Rise Office Building

systems. The ultimate goal of the structure is to keep the building standing and preserve life

safety. Keeping this goal in mind, the structural system is designed to meet all aesthetic and

architectural requirements.

An engineer’s true job is problem solving. They are responsible for coming up with a

solution to the problem the architect and the owner have created. A successful solution will meet

all design requirements as well as all code requirements. This project has given students a

preview of just how challenging it is to create a viable solution.

Page 12

Page 13: Structural Design for a Low Rise Office Building

APPENDIX A

Schematic Design Submittal

Page 13

Page 14: Structural Design for a Low Rise Office Building

STRUCTURAL

SCHEMATIC DESIGN

LARAMIE COMMUNITY COLLEGE WELCOME CENTER CAPSTONE ARE 4720 GROUP 7 Josh Knutson Shane Halverson

Page 14

Page 15: Structural Design for a Low Rise Office Building

Structural System Narrative 1. Executive Summary

A. The primary gravity structure for the LCCC Welcome Center Project will be a combination of structural steel columns, beams, and joists. Lateral loads will be supported using braced steel frames. The roof structure will consist of metal deck roof diaphragm supported by open web steel joists. The floor structure will consist of composite floor deck supported by steel beams. Roof joists and floor beams will bear on steel beams supported by steel columns. It is anticipated the building will be founded on a conventional spread footing and stem wall foundation system.

2. Building Code A. The governing building code for the project will be 2015 IBC. The fundamental design criteria are

anticipated to be as follows: 1) 2015 International Building Code 2) ASCE 7-10

3. Loading & Design Criteria A. Roof Snow Loads:

1) Design Roof Snow Load = 21 psf 2) Flat Roof Snow Load = 21 psf 3) Snow Exposure Factor (Ce) = 1.0 4) Importance Factor (I) = 1.0 5) Thermal Factor (Ct) = 1.0 6) Ground Snow Load (Pg) = 30 psf 7) Rain on Snow Surcharge = 0 psf 8) Sloped Roof Factor (Cs) = 1.00

B. Wind Design Data 1) Basic Wind Speed = 115 mph 2) Mean Roof Height = ± 60 ft 3) Risk Category = II 4) Exposure Category = C 5) Enclosure Classification = Enclosed building 6) Internal Pressure Coeff. = 0.18 7) Directionality (Kd) = 0.85 8) Topographical Factor (Kzt) = 1

C. Earthquake Design Data 1) Risk Category = II 2) Importance Factor (I) = 1.0 3) Mapped Spectral Response Accelerations:

a) Ss = 0.155g b) S1 = 0.054g

4) Site Class = B 5) Spectral Response Coef.:

a) Sds = 0.103g b) Sd1 = 0.036g

6) Seismic Design Category = A 7) Basic Structural System = Building Frame Systems

Page 15

Page 16: Structural Design for a Low Rise Office Building

8) Seismic Resisting System = Steel braced frames not specifically detailed for seismic resistance

9) Design Base Shear V = Cs*W 10) Seismic Response Coef. (Cs) = 0.034 11) Response Mod. Factor (R) = 3 12) Analysis Procedure = Equivalent Lateral Force Analysis

D. Design Loads: 1) Dead Load = weight of structure + 10psf lighting, ceiling, mech. & plumb. 2) Live Load at Elevated Floors = 80 psf 3) Mechanical Loads = weight of equipment, but not less than 125 psf

4. New Structure A. The proposed structural systems described below are a representation of group 7’s initial

analysis and design. B. Structural Systems for Proposed Welcome Center. C. Foundation:

1) Based on the Geotechnical Report, the following is anticipated for this project. a) The foundation will be constructed of conventional continuous strip footings

(supporting walls) and individual shallow spread footings (supporting columns or other isolated loads) placed on over-excavated and re-compacted subgrade, or engineered aggregate piers per the Geotechnical Report. 1) Assumed allowable bearing pressure of 3,000 psf. 2) Strip footings will be a minimum of 18”w x 12”t with 36”d exterior stem walls (total

of 48” deep). 3) Spread footings will be a minimum of 24” square. Size and reinforcing will vary by

location in an effort to balance footing pressures and minimize differential settlement.

4) Bottom of exterior foundation walls + footings shall have a minimum depth of 42” below finish exterior grade for requirements for frost protection. Interior footings within heated areas of the building may be placed at a minimum of 12” below finished grade.

D. Lateral System: 1) Steel braced frames will provide the lateral resistance. The lateral resisting members will be

positioned to minimize the architectural impact and/or enhance the architectural features. 2) Load bearing reinforced masonry walls will provide lateral resistance where possible.

Specific locations and design parameters will be developed to provide as many ‘dual use’ structural systems as possible.

3) In all locations, the metal roof and floor decks will be used as horizontal diaphragms to distribute the lateral loads to the bracing and interior or exterior shear walls.

E. Roof Framing 1) The typical roof, covering the majority of the building, shall be constructed of open-web

steel joist framing as follows: a) 24” to 30” deep standard open web steel joists bearing on a steel beam and column

structure. b) Wide flange steel beams are estimated to be 16” to 24” deep. c) 1 ½” Type B metal roof deck (assume 20 gage).

Page 16

Page 17: Structural Design for a Low Rise Office Building

d) The deck will be used as a diaphragm for lateral load transfer to the bracing and/or shear walls.

e) Acoustical deck F. Floor Framing

1) The typical floor shall be constructed of composite slab-steel deck floor system. a) 1.5 VLI to 3 VLI composite steel deck. b) 4” to 7” normal weight concrete slab.

G. Wall Framing 1) The typical exterior wall construction will be either masonry or cold formed metal studs with

sheathing. The exposed finishes are expected to be a masonry veneer or metal panel.

Metal Stud Wall Information Unsupported Stud Height

Wall Finish Stud Size, Gage, and Spacing

18’ Metal panel , gypsum, or stucco 600S162-97 @ 16” 18’ Masonry veneer (CMU, stone, brick, etc.) 800S162-97 @12” 16’ Metal panel , gypsum, or stucco 600S162-68 @ 16” 16’ Masonry veneer (CMU, stone, brick, etc.) 800S162-68 @ 12” 14’ Metal panel , gypsum, or stucco 600S162-43 @ 16” 14’ Masonry veneer (CMU, stone, brick, etc.) 800S162-54 @ 16”

2) The interior walls will be primarily metal studs and drywall, that may be reinforced with

sheathing or strapping to resist lateral loads as needed. H. Slab-on-grade:

1) 4” normal weight 3500 psi reinforced concrete.

Page 17

Page 18: Structural Design for a Low Rise Office Building

APPENDIX B

Design Development Submittal

Page 18

Page 19: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

5' - 6"1' - 7"1' - 7"

2' - 7"

24' - 4" 23' - 10" 25' - 6" 24' - 6"

1' - 8"

3' - 2" 1' - 9"

7' - 8" 21' - 11" 3' - 9" 24' - 8" 17' - 6" 21' - 4"

33' -

11"

10' -

7"

30' -

6"

6' -

3"14

' - 8

"

1' - 5"

1' - 6"

1' - 7"

2' -

0"6'

- 2"

1' - 4"

2' - 9"

1' -

7"20

' - 5

"

16' -

3"

4' -

10"

3' -

10"

10' -

4"

11

1' -

8"

18' - 6"

1' - 0" TYP.

3' - 0" TYP. UNO

10' -

9"

3' -

0"

1' - 7"

C

3' -

5"

4

S.6

13

18' - 4"

7 14

13' - 9"

27' -

4"

9' - 1"

1' - 0" 0' - 8"

13' -

10"

35' - 0"0' - 8"

0' - 8"

1' - 0"

1' - 0"1' - 0"

1' - 0"

1' - 0"

1' - 0" TYP.

3' - 0" TYP.

Typ. Spread Footing5' x 5' x 1' Thick

Typ. Spread Footing5' x 5' x 1' Thick

2' -

0"

Typ. Perimeter SpreadFooting

Extends fromFoundation wall 2'

5' - 0"

11' -

6"

1' - 10"

1' - 4"

1' - 4"

1' - 4"

1' - 7"

1' - 7"1' - 7"

1' - 7"

14' - 4"

2' -

8"

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

12:5

9 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

FOU

ND

ATIO

N P

LAN

S.1

1/8" = 1'-0"1 FOUNDATION PLAN

NOTES:1. SLAB-ON-GRADE:

1A. TOP OF SLAB-ON-GRADE ELEVATION=100'-0" UNLESS NOTED OTHERWISE1B. TYPICAL SLAB-ON-GRADE IS 4" THICK WITH #4 REINF. AT 18" O.C., E.W.1C. FOR EXTENTS OF SLAB-ON-GRADE DEPRESSIONS, SLOPES, STEPS, OPENINGS, SEE ARCH DRAWINGS

2. STEM WALLS:2A. TOP OF STEM WALL = 100'-0" UNLESS NOTED OTHERWISE2B. BOTTOM OF STEM WALL = TOP OF FOOTING

3. FOOTINGS:3A. TOP OF INTERIOR FOOTINGS = 99'-0" UNLESS NOTED OTHERWISE3B. TOP OF EXTERIOR FOOTINGS = 96'-6"3C. CENTER SPREAD FOOTINGS ON COLUMNS UNLESS DIMENSIONED OTHERWISE3D. CENTER STRIP FOOTINGS UNDER STEM WALLS UNLESS DIMENSIONED OTHERWISE3E. TOP OF INTERIOR PILASTERS = 100'-0" UNLESS NOTED OTHERWISE3F. TOP OF EXTERIOR PILASTERS = 100'-0" UNLESS NOTED OTHERWISE

4. COLUMNS4A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE

Page 19

Page 20: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

11

C

137 14

6' - 0"

24' - 8" 36' - 0" 21' - 4"

33' -

11"

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W16X77

W16X77

W16

X77

W12X58 W12X58

W12X58 W12X58

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

1' - 7"

4' -

4" 3' - 4"

3' - 6"

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

12:5

9 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

2ND

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

2

1/8" = 1'-0"1 2ND LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 2ND LEVEL TOP OF SLAB-ON-DECK ELEVATION = 116'-0"

Diagonal Bracing

Dia

gona

l Bra

cing

Dia

gona

l Bra

cing

Diagonal Bracing

Page 20

Page 21: Structural Design for a Low Rise Office Building

South

G

H

E

D

3 4 6 10 12951 2 15

B

A

11

C

137 14

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W16X77

W16X77

W16

X77

W12X58 W12X58

W12X58 W12X58

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"7' - 3"

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

12:5

9 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

3RD

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

3

1/8" = 1'-0"1 3RD LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 3RD LEVEL TOP OF SLAB-ON-DECK ELEVATION = 130'-0"

Diagonal Bracing

Dia

gona

l Bra

cing

Dia

gona

l Bra

cing

Diagonal Bracing

Page 21

Page 22: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 129530

' - 6

"10

' - 7

"33

' - 1

1"

1 2 15

B

A

11

C

137 14

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W16X77

W16X77

W16

X77

W12X58 W12X58

W12X58 W12X58

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"3' - 6"29' - 7" 7' - 3"

3' -

5"6'

- 3"

14' -

8"

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

13:0

0 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

4TH

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

4

1/8" = 1'-0"1 4TH LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 4TH LEVEL TOP OF SLAB-ON-DECK ELEVATION = 144'-0"

Diagonal Bracing

Dia

gona

l Bra

cing

Dia

gona

l Bra

cing

Diagonal Bracing

Page 22

Page 23: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

11

C

13

24' - 4" 23' - 10" 25' - 6" 24' - 6" 36' - 10" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 18' - 4"

7 14

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

13:0

0 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

RO

OF

FRAM

ING

PLA

NS.

5

1/8" = 1'-0"1 ROOF FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. ROOF TOP OF SLAB-ON-DECK ELEVATION = 158'-0"

Page 23

Page 24: Structural Design for a Low Rise Office Building

12"

24"

(2) #4 BARS CONTINUOUS

#4 BARS AT 18" O.C.EACH WAY

#4 BARS AT 18" O.C.BEND INTO FOOTING LEGSALTERNATE SIDES

4" CONCRETE ON6" GRAVEL BASE

6"36

"

3"CLR

0' -

4"

W14 x 30

0' -

2"

2" MetalDeck with4" Cover

Typ 8" x 2" 20g Metal Stud

Angle BracketBolted to Edge

Girder

6" Floor Slab

Arc

hite

ctur

e E

ngin

eerin

g P

lann

ing

Inte

riors

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

PAPP

A S &

PAP

PAS

ARCH

I TEC

TS, P

C

3/31

/201

6 5:

13:0

4 PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

Proje

ct St

atus

LATE

RAL

SYS

TEM

AN

D S

TRU

CTU

RAL

DET

AILS

S.6

1 3D for Lateral Systems

LATERAL SYSTEM NOTES:1. OVERVIEW:

1A.THE LATERAL FORCE RESISTING SYSTEM IS COMPRISED OF TWO MAIN COMPONENTS: BRACED STEEL FRAMES AND CONCRETE SHEAR WALLS.

2. BRACED FRAMES:2A. THE BRACED FRAMES WILL BE CREATED THROUGH THE UTILIZATION OF DIAGONAL HSS MEMBERS.2B. BRACE LOCATIONS ARE DISTRIBUTED THROUGHOUT THE BUILDING. EACH WALL HAS ONE CONTINOUS BRACED FRAME. LOCATIONS ARE NOTED ON EACH PLAN.

3. SHEAR WALLS3A. SHEAR WALLS ARE CONSTRUCTED AROUND THE TWO MAIN STAIRWELLS ALONG WITH THE ELEVATOR SHAFT.3B. SHEAR WALLS WILL BE CONSTRUCTED FROM 12" THICK CONCRETE ADEQUATELY REINFORCED WITH REBAR.

Diagonal HSSFrame Bracing

ConcreteShearWalls

1 1/2" = 1'-0"2 TYP. STEEL DECK DETAIL

1 1/2" = 1'-0"3 METAL STUD DETAIL

1 1/2" = 1'-0"4 FOUNDATION WALL SECTION

Page 24

Page 25: Structural Design for a Low Rise Office Building

APPENDIX C

Construction Documents Submittal

Page 25

Page 26: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

5' - 6"

1' - 7"1' - 7"

2' - 7"

24' - 4" 23' - 10" 25' - 6" 24' - 6"

1' - 8"

3' - 2" 1' - 9"

7' - 8" 21' - 11" 3' - 9" 24' - 8" 17' - 6" 21' - 4"

33' -

11"

10' -

7"

30' -

6"

6' -

3"14

' - 8

"

1' - 5"

1' - 6"

1' - 7"

2' -

0"

6' -

2"

1' - 4"

2' - 9"

1' -

7"20

' - 5

"

12' -

3"

4' -

10"

3' -

10"

10' -

4"

11

1' -

8"

18' - 6"

1' - 0" TYP.

2' - 0" TYP. UNO

10' -

9"

3' -

0"

1' - 7"

C

3' -

5"

4S.6

13

18' - 4"

7 14

27' -

4"

9' - 1"

1' - 0" 0' - 8"

13' -

10"

26' - 7"

0' - 8"

0' - 8"

1' - 0"

1' - 0"1' - 0"

1' - 0"

1' - 0"

1' - 0" TYP.

11' -

6"

1' - 10"

1' - 4"

1' - 4"

1' - 4"

1' - 7"

1' - 7"1' - 7"

1' - 7"

14' - 4"

2' -

8"

F6x6F10x10 F10x10 F10x10

F10x10

F10x10 F10x10 F10x10

F10x10

F10x10

F10x10 F10x10

F10x10 F10x10

F10x10

F10x10

F5x5 F5x5F4x4

F5x5 F5x5

F10x10 F10x10

F6x6

F10x10

F6x6

F10x10F10x10

F5x5

F10x10

F10x10

F10x10

F10x10 F10x10

F4x4

F10x10

F6x6

F10x10

F4x4

F5x5

F6x6

F2x2F2x2

F10x10

4' - 0"

5' -

0"5'

- 0"

4' - 0"11' - 9"

W12X58 W12X58 W12X58 W12X58

W12X58

W12X58 W12X58

W12X58

W12X58 W12X58 W12X58

W12X58

W12X58

W12X58 W12X58

W12X58 W12X58

W12X58

W12X58

W12X58

W12X58

W12X58

W12X58W12X58

W12X58

W12X58

W12X58

W12X58

W12X58W12X58W12X58

W12X58W12X58

W12X58

W12X58 W12X58 W12X58 W12X58 W12X58 W12X58

W12X58

W12X58

W12X58 W12X58

4' -

0"

4' - 0" 5' - 10" 4' - 0"

4' -

0"

4' -

0"

4' - 0" 4' - 0"

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:17

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

FOU

ND

ATIO

N P

LAN

S.1

1/8" = 1'-0"1 FOUNDATION PLAN

NOTES:1. SLAB-ON-GRADE:

1A. TOP OF SLAB-ON-GRADE ELEVATION=100'-0" U.N.O.1B. TYPICAL SLAB-ON-GRADE IS 4" THICK WITH #4 REINF. AT 18" O.C., E.W.1C. FOR EXTENTS OF SLAB-ON-GRADE DEPRESSIONS, SLOPES, STEPS, OPENINGS, SEE ARCH DRAWINGS

2. FOUNDATION WALLS:2A. TOP OF FOUNDATION WALL (T.O.W.) = 100'-0" TYP U.N.O.2B. BOTTOM OF FOUNDATION WALL = TOP OF FOOTING2C. TOP OF PILASTERS (T.O.C.) = 99'-4" TYP U.N.O.

3. FOOTINGS:3A. TOP OF INTERIOR FOOTINGS = 99'-4" TYP U.N.O.3B. TOP OF EXTERIOR FOOTINGS = 97'-0" TYP U.N.O.3C. CENTER SPREAD FOOTINGS ON COLUMNS UNLESS DIMENSIONED OTHERWISE3D. CENTER STRIP FOOTINGS UNDER STEM WALLS UNLESS DIMENSIONED OTHERWISE

4. COLUMNS4A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE

Page 26

Page 27: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

11

C

137 14

6' - 0"

24' - 8" 36' - 0" 21' - 4"

33' -

11"

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

1' - 7"

4' -

4" 3' - 4"

3' - 6"

W12X58

W12X58

W12X58

W12X58

W16X77

W12

X26

W16X77

W16

X77

W16

X77

W16X77

W16X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W18X106

W18X106

W16X77

W16

X77

W16

X77

W16X77

W16X77

W16X77

W16

X77

W12

X26

W18X106

W18X106

W16X77

W16X77

W16X77

W16X77

W16X77

W16

X77

W16X77

W16

X77

W16X77

W16

X77

W16

X77

W16

X77

W12

X26

W16X77

W16

X77

W16X77 W16X77

W16X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W16X77

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W12X26

12K3

12K3

12K3

12K3

12K3

12K3

12K3

W16X77

W16X77

HSS6X6X1/2

W16

X77

HSS

6X6X

1/2

HSS

6X6X

1/2

W16

X77

W16X77

W12X26 W12X26 W12X26

W16X77 W16X77 W16X77

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W16

X77

W12

X26

W12

X26

W12

X26

W12

X26

W16

X77

Dia

gona

l Bra

cing

Diagonal Bracing

Dia

gona

l Bra

cing

Diagonal BracingHSS6X6X1/2

W16X77 W16X77W16X77 W16X77 W16X77 W16X77

3' - 6 1/8" 4' - 2 3/8"

W12X58

W12X58

W12X58

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:18

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

2ND

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

2

1/8" = 1'-0"1 2ND LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 2ND LEVEL TOP OF SLAB-ON-DECK ELEVATION = 16'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED

Page 27

Page 28: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 10 12951 2 15

B

A

11

C

137 14

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"7' - 3"

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

W16X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16X77

W12

X26

W16

X77

W16X77

W14

X30

W16

X77

W16

X77

W16

X77

12K3

W16

X77

W16X77 W16X77

W16X77

W16

X77

W16

X77

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W16

X77

W14

X30

W14

X30

W14

X30

W16X77

W16X77W16X77W16X77

W16X77 W16X77

W16

X77

W16X77

W16X77W16X77W16X77W16X77

W16

X77

W16X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16

X77

W16X77 W16X77 W16X77

W16X77W16X77W16X77 W16X77 W16X77 W16X77

W16X77 W16X77

W16X77

W16X77

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16X77

W14

X30

W16X77

W16

X77

W16X77

W16

X77

W16X77W12X26W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26

W16X77

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W12

X26

W14

X30

W14

X30

W14

X30

12K3

12K3

W16X77

116' - 0"129' - 6"

HSS6X6X1/2

130' - 0"143' - 6"

W16X77

W16

X77

W16

X77

HSS

6X6X

1/2

W16

X77

W16

X77

HSS

6X6X

1/2

HSS6X6X1/2

W16X77

W16

X77

W12X26

Dia

gona

l Bra

cing

Diagonal Bracing

Dia

gona

l Bra

cing

Diagonal Bracing

W12X58 W12X58

W12X58 W12X58

W12X58

W12X58

W12X58 W12X58

W12X58

W12X58W12X58

W12X58

W12X58 W12X58

W12X58 W12X58 W12X58 W12X58 W12X58

W12X58W10X49 W12X58 W12X58

W12X58

W12X58W12X58 W12X58 W12X58

W12X58

W12X58

W12X58

W12X58

W12X58

W12X58W12X58W12X58

W12X58

W12X58

W12X58

W12X58

W12X58 W12X58

2' - 6 1/8"

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:19

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

3RD

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

3

1/8" = 1'-0"1 3RD LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 3RD LEVEL TOP OF SLAB-ON-DECK ELEVATION = 30'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED

Page 28

Page 29: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 1295

30' -

6"

10' -

7"

33' -

11"

1 2 15

B

A

11

C

137 14

24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"3' - 6"29' - 7" 7' - 3"

3' -

5"6'

- 3"

14' -

8"

Dia

gona

l Bra

cing

Diagonal Bracing

Dia

gona

l Bra

cing

Diagonal Bracing

7' - 2 7/8" 7' - 2 7/8"

W16

X77

W12

X26

W12

X26

W16

X77

W14

X30

W16

X77

W16X77

W14

X30

W12

X26

W16

X77

W16

X77

W16

X77

W16

X77

W16X77

W16X77

W16

X77

W16

X77

W16

X77

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W16

X77

W16

X77

W16X77

W16X77

W16

X77

W14

X30

W16

X77

W16

X77

W16X77

W16

X77

W16X77 W16X77

W16X77W16X77W16X77

W16

X77

W16

X77

W16X77 W16X77

W16

X77

W16X77W16X77W16X77W16X77W16X77 W16X77 W18X106

W16

X77

W16X77 W16X77 W16X77

W16

X77

W16X77 W16X77W16X77

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W12

X26

W14

X30

W14

X30

W12

X26

W14

X30

W14

X30

W16X77 W16X77

W16X77

HSS6X6X1/2

W16

X77

HSS

6X6X

1/2

W16

X77

HSS

6X6X

1/2

W16X77

HSS6X6X1/2

W14

X30

W16X77

W14

X30

W14

X30

W14

X30

W12X26

W14X30 W14X30 W16X774'

- 2

1/8"

3' - 4"

W12X26 W12X26 W12X26

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:19

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

4TH

LEV

EL F

LOO

R F

RAM

ING

PLA

NS.

4

1/8" = 1'-0"1 4TH LEVEL FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. 4TH LEVEL TOP OF SLAB-ON-DECK ELEVATION = 44'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED

Page 29

Page 30: Structural Design for a Low Rise Office Building

G

H

E

D

3 4 6 8 10 12951 2 15

B

A

11

C

13

24' - 4" 23' - 10" 25' - 6" 24' - 6" 29' - 7" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 18' - 4"

7 14

33' -

11"

10' -

7"

30' -

6"

3' -

5"6'

- 3"

14' -

8"

W16X26W16X26 W16X26 W16X26 W16X26

W14X30 W14X30 W14X30 W14X30

W14

X30

W16X26

W14X30

W14

X30

12K3

12K3

12K3

W14

X30

W14

X30

W14

X30

W14

X30

W14X30 W14X30 W14X30 W14X30 W14X30 W14X30 W16X26 W16X77

W16

X26

W16X77

W16X26

W16X77

W16

X26

W16X26W16X26W16X26

W14X30

W14

X30

W12

X26

W12

X26

W14

X30

W12X26

W12X26

W14

X30

W14X30

W14

X30

W14X30 W14X30 W12X26

W12X26

W12

X26

W12

X26

W12

X26

W12X26

W12X26

W14X30

W12

X26

W12X26

W12X26

W14

X30

W12X26

W12X26

W12X26

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W14

X30

W12

X26

W21

X44

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W14X30

12K3

12K3 12

K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3 12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

W8X10 W8X10 W8X10

W14

X30

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

12K3

W21

X44

W18

X106

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

12K3

12K3

12K3

12K312K3

12K3

12K3

W12X26

W12X26

W12X26

W12X26

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

W8X

10

12K3

W21X44

W16X26

W8X

10

W16X26

W14

X30

W12X26W12X26

L6X6X5/16 L6X6

X5/16

L6X6X5/16L6X6X

5/16

7' - 3"

W14X30

W14

X30

W16X77

W12X26

W12X26

W12X26

W12X26

W12X26

3' - 9 7/8"

W12X26

12' -

0 1

/4"

5' -

2"

10.00°

100.00°

12' -

3 1

/4"

17' -

4 1

/4"

80.00°

95.00°

4' - 1"

H

1 2

12K1

12K1

12K1

12K1

12K1

33' - 0"

11' -

10"

D

8 109

B

A

C

7

W14

X30

W14

X30

W14

X30

W14

X30

W14X30

W14X30

HSS4X4X1/421' - 8 3/4"

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:20

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

RO

OF

FRAM

ING

PLA

NS.

5

1/8" = 1'-0"1 ROOF FRAMING PLAN

NOTES:1. COLUMNS:

1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:

2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE

3. SLAB-ON-DECK3A. ROOF TOP OF SLAB-ON-DECK ELEVATION = 58'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED

1/8" = 1'-0"2 HIGH ROOF FRAMING PLAN

1/8" = 1'-0"3 HIGH ROOF FRAMING PLAN B

Page 30

Page 31: Structural Design for a Low Rise Office Building

0' -

4"

W14 x 30

0' -

2"

2" MetalDeck with4" Cover

Typ 6" x 2" 20g Metal Stud

Angle BracketBolted to Edge

Girder

6" Floor Slab

4" CONCRETE ON6" GRAVEL BASE

(3) #4 BARSCONT, EQ SPA

#4 BARS AT 18" O.C.BEND INTO FOOTINGALTERNATE SIDES

1' -

0"

2' - 0"

(3) #4 BARSCONTINUOUS

3" CLR

0' -

8"

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

Wyo

min

g co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LPO

S

Revis

ions

P AP P

A S &

PA P

P AS

A RC H

ITEC

TS, P

C

5/5/

2016

2:3

9:27

PM

\\stu

dent

files

.uw

yo.e

du\s

tora

ge$\

Des

ktop

\AR

E 47

20\R

evit

Proj

ect\S

truct

ural

Cen

tral G

roup

7_j

knut

so4.

rvt

Proj

ect N

umbe

rIs

sue

Dat

eLA

RAM

IE C

OU

NTY

CO

MM

UN

ITY

CO

LLEG

EW

ELC

OM

E C

ENTE

R

GROU

P 7

LATE

RAL

SYS

TEM

AN

D S

TRU

CTU

RAL

DET

AILS

S.6

1 3D for Lateral Systems

LATERAL SYSTEM NOTES:1. OVERVIEW:

1A.THE LATERAL FORCE RESISTING SYSTEM IS COMPRISED OF TWO MAIN COMPONENTS: BRACED STEEL FRAMES AND CONCRETE SHEAR WALLS.

2. BRACED FRAMES:2A. THE BRACED FRAMES WILL BE CREATED THROUGH THE UTILIZATION OF DIAGONAL HSS MEMBERS.2B. BRACE LOCATIONS ARE DISTRIBUTED THROUGHOUT THE BUILDING. EACH WALL HAS ONE CONTINOUS BRACED FRAME. LOCATIONS ARE NOTED ON EACH PLAN.

3. SHEAR WALLS3A. SHEAR WALLS ARE CONSTRUCTED AROUND THE TWO MAIN STAIRWELLS ALONG WITH THE ELEVATOR SHAFT.3B. SHEAR WALLS WILL BE CONSTRUCTED FROM 12" THICK CONCRETE ADEQUATELY REINFORCED WITH REBAR.

Diagonal HSSFrame Bracing

ConcreteShearWalls

1 1/2" = 1'-0"2 TYP. STEEL DECK DETAIL

1 1/2" = 1'-0"3 METAL STUD DETAIL 1 1/2" = 1'-0"4 FOUNDATION WALL SECTION

Page 31

Page 32: Structural Design for a Low Rise Office Building

APPENDIX D

Construction Administration Submittal

Page 32

Page 33: Structural Design for a Low Rise Office Building

Request For Information (RFI) 001

Subject: Structural Steel

Project: LCCC Student Services

To: ARE 4720 Design Team

From: Bob the Builder

Date requested by: May 13, 2016 5:00 p.m.

Request: A single shear tab connection with (4) bolts on a W18x35 beam was installed 1” too

low. The required capacity is Ru= 45 kips. Please provide field fix for connection. You can

provide a verbal or drawing response. Verbal responses shall include enough information that

it is contructable.

Answer:

In response to RFI 001 we have come up with the following solution. Please raise the beam to the original specified installed height then field weld the beam to the shear tab. No bolts are required. A single 12” long, 3/16” fillet weld down the long side of the shear tab will provide a connection of adequate strength. Please see attached drawing and calculations for more detail along with capacity verification. If you have any questions or concerns regarding this solution please do not hesitate to contact me.

Page 33

Page 34: Structural Design for a Low Rise Office Building

Page 34

Page 35: Structural Design for a Low Rise Office Building

APPENDIX E

Structural Calculations Package

Page 35

Page 36: Structural Design for a Low Rise Office Building

Laramie County Community College 

Welcome Center Structural Calculation Package 

ARE 4720 STRUCTURAL SYSTEMS DESIGN GROUP 7 

SHANE HALVESON & JOSH KNUTSON 

University of Wyoming Laramie, WY 

May 11, 2016 

Page 36

Page 37: Structural Design for a Low Rise Office Building

TABLE OF CONTENTS

1 General Site Information…...………………………………..……3

1.1 Design Criteria……………………...……………………….…..3

2 Vertical (Gravity Loads)……………………………………….….4

2.1 Dead Loads………………………………………………….…..4

2.2 Live Loads………………………………………………………5

2.3 Snow Loads……………………………………………………..5

3 Lateral Loads………………………………………………………7

3.1 Wind Loads…………………………………………………......7

3.2 Seismic Loads…………………………………………………..8

4 Gravity System Design……………………………………………16

4.1 Composite Beam Design……………………………………….16

4.2 Composite Girder Design………………………………………18

4.3 Open Web Steel Joist Design…………………………………..20

4.4 Column Design…………………………………………………22

4.5 Column Base Plate Design……………………………………..23

4.6 Interior Column Footing Design……………………………….24

4.7 Beam to Girder Connection…………………………………….25

Page 372 of 27

Page 38: Structural Design for a Low Rise Office Building

1. GENERAL INFORMATION

1.1 Design Criteria

Page 383 of 27

Page 39: Structural Design for a Low Rise Office Building

2. VERTICAL (GRAVITY LOADS)

2.1 Dead Loads

Page 394 of 27

Page 40: Structural Design for a Low Rise Office Building

2.2 Live Loads

2.3 Snow Loads

Page 405 of 27

Page 41: Structural Design for a Low Rise Office Building

Page 416 of 27

Page 42: Structural Design for a Low Rise Office Building

3. LATERAL LOADS

3.1 Wind Loads

Page 427 of 27

Page 43: Structural Design for a Low Rise Office Building

3.2 Seismic Loads

Page 438 of 27

Page 44: Structural Design for a Low Rise Office Building

Page 449 of 27

Page 45: Structural Design for a Low Rise Office Building

Page 4510 of 27

Page 46: Structural Design for a Low Rise Office Building

Page 4611 of 27

Page 47: Structural Design for a Low Rise Office Building

Page 4712 of 27

Page 48: Structural Design for a Low Rise Office Building

Page 4813 of 27

Page 49: Structural Design for a Low Rise Office Building

Page 4914 of 27

Page 50: Structural Design for a Low Rise Office Building

Page 5015 of 27

Page 51: Structural Design for a Low Rise Office Building

4. GRAVITY SYSTEM DESIGN

4.1 Composite Beam Design

Page 5116 of 27

Page 52: Structural Design for a Low Rise Office Building

Page 5217 of 27

Page 53: Structural Design for a Low Rise Office Building

4.2 Composite Girder Design

Page 5318 of 27

Page 54: Structural Design for a Low Rise Office Building

Page 5419 of 27

Page 55: Structural Design for a Low Rise Office Building

4.3 Open Web Steel Joist Design

Page 5520 of 27

Page 56: Structural Design for a Low Rise Office Building

Page 5621 of 27

Page 57: Structural Design for a Low Rise Office Building

4.4 Column Design

Page 5722 of 27

Page 58: Structural Design for a Low Rise Office Building

4.5 Column Base Plate Design

Page 5823 of 27

Page 59: Structural Design for a Low Rise Office Building

4.6 Interior Column Footing Design

Page 5924 of 27

Page 60: Structural Design for a Low Rise Office Building

4.7 Beam to Girder Connection

Page 6025 of 27