AGENDA
2
AGENDA
MARTIFER GROUP- BUSINESS AREAS
MARTIFER CONSTRUCTIONS WORLWIDE
3
MARTIFER LOGISTIC BUILDINGS
PROJECT EXPERIENCE IN ROMANIA
INTERNATIONAL EXPERIENCE
MARTIFER GROUP
4
BUSINESS AREAS
METALLIC CONSTRUCTION SOLAR
OTHERS
5
STEEL STRUCTURESALUMINUM STAINLESS STRUCTURESENGENIERINGWIND INDUSTRY
EPC SOLUTIONSFOTOVOLTAIC SOLUTIONSDISTRIBUITION
MARTIFER GROUP- BUSINESS AREAS
6
MARTIFER GROUP- BUSINESS AREAS
504635 641 700
8841028
1418
1800
2853
3795
0
500
1000
1500
2000
2500
3000
3500
4000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
No. of Workers (annual average)
6,5 7,8 7,7 9,3 11,115,6
28,6
37,0
61,7
66,8
0
10
20
30
40
50
60
70
80
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
EBITDA (M€)
7
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
52 67,7 78,4100,6
125,6148,9
278,7
518,5
635,1606,1
0
100
200
300
400
500
600
700
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Operational Revenues (M€)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
MARTIFER CONSTRUCTIONS
8
WORLWIDE
9Portugal |Spain |Poland |Angola |Romania |Ireland
Martifer was established on 21st February 1990, and still maintains
its head office in the industrial zone of Oliveira de Frades, Portugal,
where is located the main factory of Steel Structures with 30.000
m2.
The factory is supplying the Portuguese, Spanish, Western Europe
and North African Market.
MARTIFER CONSTRUÇÕES
Oliveira de Frades | Portugal
10
During the first quarter of 2002, it began the construction of a new
plant in Benavente, Portugal.
The main goal of this was to engage in the construction of the new
EURO 2004 football stadiums and to supply the Spanish market at
the time.
The area occupied by this factory has a total value of 24.000 m2.
MARTIFER BENAVENTE
Benavente | Portugal
Located in Gliwice, Poland, the production unit of Martifer started
operating in August 2004.
This unit has a nominal annual capacity of 10.000 tons of steel
structure and is possible to per-form shot blasting, painting and
coating. It is equipped with state of the art CNC cut and dril-ling
equipment for plates and profiles, as well as cutting and bending
of thin plate in the fini-shing sector.
MARTIFER POLSKA
Gliwice | Polska
11
Martifer started activity in Romania in 2005, importing the Steel
Structures from Poland and Portugal.
In 2008, the investment in the new Steel Structures Plant, allows
Martifer to have a local capacity of production of 10.000 tons to
supply Romania, Bulgaria, Serbia, Croatia, Turkey and part of the
Middle East Market.
MARTIFER CONSTRUCTII
Calarasi | Romania
Located in Luanda, Angola, the production unit of Martifer
started operating in September 2009.
Projected to supply the Central and South African market the
factory will start production in September 2009 equipped with a
line for cutting and drilling profiles, oxicut machine with plasma,
MARTIFER CONSTRUÇÕES
Luanda | Angola
12
line for cutting and drilling profiles, oxicut machine with plasma,
guillotine, plate bending machine, plate drilling machine and
automatic shoot blasting chamber. Local capacity of production
of 150 tons \week.
PROJECT EXPERIENCE IN ROMANIA
13
IN ROMANIA
Saint Gobain Glass Factory| Romania
The first project of Martifer in Romania was a “turn-key” glass factory for Saint
Gobain Glass, executed from 2005 to 2007 in Calarasi.
14
Henkel Factory | Romania
The scope of works was the supply of steel structures in Cluj with the
quantity of steel reaching 1.400 Tons.
15
Biodiesel Factory| Romania
A turn-key project for Prio, which included the
works of special foundations, land movements,
civil construction, steel structures, cladding and
roofing, finishing, external networks, roads,
railway, etc.
16
Grand Arena Berceni| Romania
The scope of works was the supply and assembly of the steel
structure for 9 of the 10 corps of the mall. The connections
between the main elements were welded on site. The quantity
of steel supplied and assembled reaches 4.500 Tons.
17
Glass House| Romania
2 buildings for offices joined by two intermediarycorps.The quantity of steel reaches 1.550 Tons with aexecution period of 12 months including fabricationand erection on site.
18
Eurotower (Cascade) | Romania
A class A office building with 19 floors above ground floor.
Martifer scope is the Design of foundations and superstructure,
fabrication, assembly and supply of the steel structure and
execution of concrete slabs over ground floor. The estimation of
the quantity of steel structure is about 3.500 tons.
Assembly – 5 months
19
Extraction Plant| Romania
A turn-key factory of oil extraction from seeds of sunflower
for Prio comprehending the Design and Build of: crushed
stone pilings, roads, railways, warehouses, silos, tanks, pipe-
racks & catwalks.
Steel Structure: 2.000 tons
Concrete: 15.000 m3
Steel Reinforcement: 1.600 tons
20
Steel Reinforcement: 1.600 tons
Dambovita Center| Romania
For the restructuring of Casa Radio complex Martifer
manufactured 3.200 tons of Steel structure pilings for the
Underground Parking Area. The structure was delivered in
special transports of 25 length and 80 tons.
21
Basarab Bridge| Romania
In the heart of Bucharest this cabled stayed bridge willhave 4.500 tons of metallic deck. The execution periodwill be 9 months for Detail Engineering, Manufacturingand Erection over the railroad access to the city mainstation.
22
Otopeni Bridge| Romania
In the exit of Bucharest to Ploiesti this cabled stayedbridge will have 1.350 tons of metallic deck and 3800m2of steel deck floor. The execution period will be 2 monthsfor Detail Engineering, 3,5 months for Manufacturing and4 month for Erection over the railroad line.
23
Petrom City| Romania
In Bucharest the steel structure for skylights andtechnical floor will have 510 tons and 4000m2 ofglass covering. The execution period will be 3,5months for Detail Engineering, Manufacturing andErection.
24
Polus Center| Romania
In Constanta the steel structure for two buildings ofthe shopping center will have 2000 tons and it iserected on concrete piles. The execution period willbe 2 months for Detail Engineering, Manufacturingand Erection.
25
MARTIFER LOGISTIC
26
BUILDINGS
SWEDWOOD | Paços de Ferreira - Portugal
Covered Area: 120.000 m2 , Turn Key Project
Steel Structure: 3.000 Ton
27
SUNVIAUTO MAROC | Maroc
Area: 4125 m2, Turn Key Project
Steel Structure: 220 Ton
28
PLANT FOR SIMOLDES POLSKA | Poland
The plant for Simoldes is a turnkey project for an industrial hall
with 8500 sqm, including the office and social buildings with an
area of 1240 sqm. 450 tons of steel structures were used during
the 19 months of execution period.
29
OBI - OGROD | Poland
Obi is focused on the trade of bricolage, decoration and gardening. It is located in Lubin in Poland. 160 tons of steel structures and 6700 sqm of cladding for the roof were used. The execution period started in October 2004 and ended in January 2005. Turn Key Project
30
CONTINENTE VALONGO | Portugal
Building site area: 60.000 m2 , Turn Key Project
Construction Steel: 3.300 Ton
Concrete Quantity: 35:000
Steel Structure: 1000 Ton
31
BIERDRONKA, JERÓNIMO MARTINS | Poland
Area: 22.000 m2, Turn Key Project
Steel Structure: 800 Ton
32
ARCEN| Poland
Area: 2000 m2, Turn Key Project
Steel Structure: 160 Ton
33
SAINT GOBAIN | Poland
Area: 12000 m2, Turn Key Project
Steel Structure: 700 Ton
34
O2A| Poland
Area: 5000 m2, Turn Key Project
Steel Structure: 160 Ton
35
UGINE ALZ, ARCELOR MITAL| Poland
Area: 5300 m2, Turn Key Project
Steel Structure: 580 Ton
36
VOLVO| Poland
Area: 3000 m2, Turn Key Project
Steel Structure: 150 Ton
37
CARREFOUR| Poland
Area: 5000 m2, Turn Key Project
Steel Structure: 150 Ton
38
DANA FLUID PRODUCTS| Slovakia
Area: 3100 m2, Turn Key Project
Steel Structure: 200 Ton
39
FOCUS PARK BYDGOSZCZ| Poland
Area: 27648 m2, Turn Key Project
Steel Structure: 190 Ton
40
MAKRO SZCZAWNO ZDRÓJ| Poland
Area: 12000 m2, Turn Key Project
Steel Structure: 520 Ton
41
MAKRO, RZGÓW| Poland
Area: 10000 m2, Turn Key Project
Steel Structure: 520 Ton
42
MAKRO, RZGÓW| Poland
Area: 10000 m2, Turn Key Project
Steel Structure: 520 Ton
43
SHOPPING IKEA | Matosinhos - Portugal
2800 tons of steel in the roof
1000 tons of steel for support of production
42.000sqm application of polycarbonate
Assembly: 7 months
44
SHOPPING IKEA | Lisboa - Portugal
From the bold architecture we highlight the strenght that the solutiongives us by using a diferent volume, both formal and aesthetically. MartiferAlumínios took part in the project not only in the façade solutions but alsoin the facing of this volume in Alucobond.
45
INTERNATIONAL EXPERIENCE
INTERNATIONALEXPERIENCE
46
EXPERIENCE
Dragão Stadium| Oporto
2800 tons of steel in the roof; 1000 tons of steel for support of
production. 42.000sqm application of polycarbonate.
Assembly: 7 months
47
Benfica Stadium| Lisbon
The structure is composed by 4 tube arcs with 2000x40mm, main
trusses with girders and tubular sections, struts/ties that connect
the tubes and trusses, that sustain the roof purlins. Assembly: 8
months
48
Alvalade Stadium| Lisbon
Roof constituted by a three-dimensional truss sustained on 16
ties connected to 4 masts. The main girders are perpendicular to
the interior ring and are sustained on it. Assembly: 8 months.
49
Sacyr Tower | Spain
A 240m height tower with 59 floors and a construction site of
115.000m2. Manufacturing and assembly of the auditorium
covering, 170Ton; composite pier’s steel mass and tower’s edge
beams 5.000Ton; plates 60.000sqm.
50
Colombo Tower| Portugal
Steel Structure: 1.400 Ton
12 floors
21.000m2 of Plate
51
CAJA MAGICA | Spain
Steel coverage: 4.250 Ton divided by three stadiums
The stadium has a movable coverage.
52
City of Communication| Madrid
12 buildings for offices and two for commercial areas, all joined
by a common roof. This structure is composed by 3 m high
beams and flanges with 65 mm thickness, which form a square
of 8,1 m by 8,1 m. The quantity of steel reaches 9.000 tons.
Assembly – 18 months.
53
Bridge over Tâmega River | Basto
The project requires 2.900 tons on two steel decks with 390m,
with spans of 60m.
54
Bascule Bridge | Leixões
The 4th largest bascule bridge in the World with 92 meters length
and 11 large, was executed during 10 months in 2007 with 1300
tons of Steel:
55
Francisco Sá Carneiro Airport| Oporto
A reference work not only for the figures involved but also for the
complexity. 13.000 ton of steel structures manufactured and
assembled in 12 months. The main structure of this project is
constituted by arcs with 80m length, weighing 100 tons each.
56
Dublin Airport| Ireland
Steel structure: 1.000 Ton
20.000m2 kalzip and alucobond coverage area
57
Martifer Constructii S.R.L.
Office:
Str. Stelea Spataru , nr. 12Sector 3, 030213 Bucuresti, Romania Phone: + 4 0314 056 863Fax: + 4 0213 106 864
Factory:
58
Factory:
Str. Prelungirea Bucuresti nr. 166910513 Calarasi, RomaniaPhone: +4 037 271 53 09Fax: +4 037 371 06 71
www.martifer.com
Markets
Romania| Bulgaria | Turkey | Croatia | Serbia | Greece| Middle East