Sulphur
31
SULPHUR RECOVERY UNIT REFERENCES OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATE MAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATE COUNTRY CONTRACT TYPE SCOPE OF WORK LOCATION PETROCARABOBO SA BASIC ENGINEERING DESIGN FOR SRU&TGT 3 - 03/10/2012 Tecnimont KT PETROCARABOBO UPGRADER Claus Section - 500 t/d - 03/04/2013 Venezuela LS - Lump Sum BEDP Faja del Orinoco region 2 - Tail Gas Treatment - 1 000 t/d - / Lukoil Neftochim Bourgas NEW SULPHUR RECOVERY UNIT SRU-4 0 - 30/05/2012 Tecnimont KT BURGAS REFINERY NEW H-OIL COMPLEX Claus Section Amine Acid Gas 300 t/d - 30/11/2014 Bulgaria LS - Lump Sum / Bourgas 0 - Tail Gas Treatment Amine Acid Gas 300 t/d - / Raffineria di Milazzo REALIZZAZIONE UNITA' SRU3,OGA2, SWS3 0 - 09/05/2012 Tecnimont KT RAFFINERIA DI MILAZZO Claus Section Amine Acid Gas 110 t/d - 15/05/2015 Italy LS - Lump Sum / Milazzo 0 - Sour Water Treatment - 81 t/d - / Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance Page 1 of 31
Transcript
  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    PETROCARABOBO SA BASIC ENGINEERING DESIGNFOR SRU&TGT

    3 - 03/10/2012

    Tecnimont KT PETROCARABOBOUPGRADER

    Claus Section - 500 t/d - 03/04/2013

    Venezuela LS - Lump Sum BEDPFaja del Orinoco region

    2 -Tail Gas Treatment - 1 000 t/d -/

    Lukoil Neftochim Bourgas NEW SULPHUR RECOVERYUNIT SRU-4

    0 - 30/05/2012

    Tecnimont KT BURGAS REFINERY NEWH-OIL COMPLEX

    Claus Section Amine Acid Gas 300 t/d - 30/11/2014

    Bulgaria LS - Lump Sum /Bourgas

    0 -Tail Gas Treatment Amine Acid Gas 300 t/d -/

    Raffineria di Milazzo REALIZZAZIONE UNITA'SRU3,OGA2, SWS3

    0 - 09/05/2012

    Tecnimont KT RAFFINERIA DI MILAZZO Claus Section Amine Acid Gas 110 t/d - 15/05/2015Italy LS - Lump Sum /Milazzo

    0 -Sour Water Treatment - 81 t/d -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 1 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    TOTAL E&P ITALIA TEMPA ROSSA OIL CENTRE,LPG STORAGE CENTER,WELLSITES AND CORLETO TIEINS

    0 - 05/04/2012

    ATITECNIMONT/TECNIMONTKT

    TEMPAROSSA PROJECT Claus Section Amine Acid Gas 80 t/d - 14/05/2016

    Italy LS - Lump Sum /Corleto Perticara

    0 -Tail Gas Treatment Amine Acid Gas 80 t/d -/

    0 -Incinerator Amine Acid Gas 80 t/d -/

    SAIPEM 150 MBOPD EARLYPRODUCTION FACILITIES FORJURASSIC PRODUCTION

    0 - 05/12/2011

    Tecnimont KT JURASSIC PROJECT Claus Section Physical solvent acid gas 1 100 t/d - 16/04/2012Kuwait LS - Lump Sum BEDPNorth Kuwait

    0 -Tail Gas Treatment Physical solvent acid gas 1 100 t/d -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 2 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    S.C. IPIP SA SUPPLY OF BASIC ANDEXTENDED BASIC DESIGNPACKAGE

    0 - 31/08/2011

    Tecnimont KT BUSHEHR PETROCHEMICALCOMPLEX

    Claus Section - 200 t/d - 30/06/2012

    Iran LS - Lump Sum BEDPBandar Assaluyeh

    0 -Claus Section - 200 t/d -/

    0 -Tail Gas Treatment - 400 t/d -/

    OJSC Khabarovsk Oil Refinery SALES AND PURCHASE OFCLAUS MODULAR PACKAGE

    0 - 06/08/2011

    Tecnimont KT OJSC KHABAROVSK OILREFINERY

    Claus Section Physical solvent acid gas 8 t/d - 15/10/2012

    Russia LS - Lump Sum E PKhabarovsk

    Kuwait National Petroleum Co.(KNPC)

    INCINERATOR PACKAGES 2 - 07/07/2011

    Tecnimont SpA KNPC MAA REFINERY Incinerator - 0.00 - 07/09/2013Kuwait LSTK - Lump Sum TurnKey E PMina Al Ahmadi

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 3 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Petrochina YunnanPetrochemical Co. Ltd.

    SULPHUR RECOVERY UNIT260 KTA CAPACITY

    0 - 23/06/2011

    Tecnimont KT YUNNAN REFINERY PROJECT Amine Regeneration Amine Acid Gas 820 t/d - 23/11/2011China LS - Lump Sum BTianjin

    0 -Claus Section - 875 t/d -/

    0 -Tail Gas Treatment - 875 t/d -/

    0 -Sulphur Degassing - 875 t/d -/

    Bangchak Petroleum PublicCompany Co.

    BASIC ENGINEERINGPACKAGE

    0 - 03/04/2011

    Tecnimont KT LICENSE AND ENGINEERINGAGREEMENT FOR TGT UNIT

    Tail Gas Treatment Amine Acid Gas ,Sour waterstripper

    65 t/d - 31/12/2012

    Thailand LS - Lump Sum BEDPBangkok

    SCOP BASIC ENGINEERING DESIGNPACKAGE FOR HPU/SRU

    0 - 09/03/2011

    Foster Wheeler Energy Ltd NEW NASSIRIYA REFINERYPROJECT

    Claus Section Amine Acid Gas 2 100 t/d - 10/09/2011

    Iraq LS - Lump Sum /Nassiriya

    0 -Tail Gas Treatment - 150 000 Nm3/h -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 4 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Petropars ENGINEERING SERVICES 0 - 15/02/2011Tecnimont SpA SOUTH PARS 12 Claus Section Sour water stripper 10 800 t/d - 31/12/2011Iran R - Reimbursable ESouth ParsKuwait National Petroleum Co.(KNPC)

    ENGINEERING SERVICES ONSULPHUR PACKAGE

    0 - 15/02/2011

    Tecnimont SpA ACID GAS REMOVAL PLANT Claus Section Sour water stripper 9 600 t/d - 31/12/2011Kuwait R - Reimbursable EMina Al Ahmadi

    Raffineria di Milazzo FRONT END UNITA'SRU3-OGA2-SWS3

    0 - 13/09/2010

    Tecnimont KT FEED PER NUOVE UNITA'SRU3-OGA2-SWS3 EINTERCONNECTING

    Claus Section Amine Acid Gas 110 t/d - 01/01/2011

    Italy R - Reimbursable FEEDMilazzo

    0 -Amine Regeneration Amine Acid Gas 160 m3/h -/

    0 -Sour Water Treatment Amine Acid Gas 110 m3/h -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 5 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Nynas AB NYNASHAM REFINERYSR3&TG1 PROJECT

    1 Technip KTI SpA 03/06/2010

    - SULPHUR RECOVERY, TAILGAS TREATMENT &DEGASSING UNIT (SR3&TG1)

    Amine Regeneration Amine Acid Gas ,Sour waterstripper

    48 t/d DIPARAR

    30/09/2012

    Sweden LSTK - Lump Sum TurnKey E P CNynashamn

    1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper24 t/d DIPA

    RAR/

    1 Technip KTI SpAIncinerator Amine Acid Gas ,Sour water

    stripper48 t/d DIPA

    RAR/

    1 Technip KTI SpASulphur Degassing Amine Acid Gas ,Sour water

    stripper30 t/d DIPA

    RAR/

    1 Technip KTI SpATail Gas Treatment Amine Acid Gas ,Sour water

    stripper48 t/d DIPA

    RAR/

    Khuzestan Oil Refining Company KHUZESTAN REFINERYPROJECT

    1 Technip KTI SpA 28/04/2010

    - BEDP FOR SOUR WATERSTRIPPER UNIT WITHAMMONIA RECOVERY

    Sour Water Treatment Sour water stripper 9 216 t/d - 16/11/2011

    Iran LS - Lump Sum BAbadan

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 6 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Ministry of Oil/South OilCompany (SOC)

    BASIC DESIGN &ENGINEERING PACKAGE

    1 Technip KTI SpA 25/02/2010

    Technip KTI SpA KARBALA REFINERYEXPANSION PROJECT

    Amine Regeneration Amine Acid Gas ,Sour waterstripper

    360 t/d - 15/09/2010

    Iraq LS - Lump Sum BEDPKarbala

    1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper180 t/d -

    /1 Technip KTI SpA

    Incinerator Amine Acid Gas ,Sour waterstripper

    360 t/d -

    /1 Technip KTI SpA

    Sulphur Degassing Amine Acid Gas ,Sour waterstripper

    360 t/d -

    /1 Technip KTI SpA

    Sulphur Forming Amine Acid Gas ,Sour waterstripper

    360 t/d -

    /1 Technip KTI SpA

    Tail Gas Treatment Amine Acid Gas ,Sour waterstripper

    360 t/d RAR

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 7 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Socar & Turcas SOCAR & TURCAS RAFINARIA.S.

    2 Technip KTI SpA 18/02/2010

    Foster Wheeler Italiana SpA CLAUS PROCESS, SULPHURDEGASSING & TAIL GASTREATMENT (TGT)

    Claus Section Amine Acid Gas ,Sour waterstripper

    430 t/d RAR 23/10/2010

    Turkey LS - Lump Sum BIzmit

    0 Technip KTI SpASulphur Degassing Amine Acid Gas ,Sour water

    stripper430 t/d RAR

    /1 Technip KTI SpA

    Tail Gas Treatment Amine Acid Gas ,Sour waterstripper

    463 t/d RAR

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 8 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Gasco HABSHAN 5 - GAS FIELDDEVELOPMENT PROJECT

    4 WorleyParsons 21/11/2009

    MaireTecnimont SpA SULPHUR RECOVERY UNITS &ACID GAS REMOVAL UNITS

    Claus Section Amine Acid Gas 1 300 t/d - 01/08/2011

    UAE CP - Cost Plus E PHabshan

    4 Exxon MobilTail Gas Treatment Amine Acid Gas 1 300 t/d -/

    4 Goar AlllisonSulphur Degassing - 1 300 t/d -/

    4 WorleyParsonsIncinerator - 1 300 t/d -/

    4 -Gas Sweetening - 0.00 t/d -/

    4 -Amine Regeneration - 0.00 -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 9 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Naftan OJSC ENGINEERING AND SUPPLYOF CRITICAL ITEMS

    1 - 25/10/2009

    STSI SULPHUR RECOVERY UNITNAFTAN REFINERYNOVOPOLOTSK

    Claus Section Amine Acid Gas ,Sour waterstripper

    113 t/d RAR

    Belarus LS - Lump Sum B PNovopolotsk

    0 -Tail Gas Treatment Amine Acid Gas ,Sour water

    stripper226 t/d RAR

    /0 -

    Amine Regeneration Amine Acid Gas ,Sour waterstripper

    226 t/d RAR

    /0 -

    Sulphur Degassing Amine Acid Gas ,Sour waterstripper

    226 t/d RAR

    /1 -

    Incinerator Amine Acid Gas ,Sour waterstripper

    226 t/d RAR

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 10 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Egyptian Refining Company SUPPLY OF HYDROGEN &SULPHUR RECOVERY UNITSFOR ERC REFINERY PLANTPROJECT

    1 Technip KTI SpA 23/06/2009

    GS Engineering & Construction SRU+HPU UNITS FOR ERCREFINERY

    Claus Section Amine Acid Gas ,Sour waterstripper

    160 t/d - 23/07/2011

    Egypt LS - Lump Sum /Mostorod

    1 Technip KTI SpATail Gas Treatment - 320 t/d -/

    Saudi Aramco MANIFA GAS FACILITIESPROJECT

    0 Jacobs Netherland BV 19/06/2009

    GS Engineering & Construction SULPHUR RECOVERY UNIT -REACTION FURNACEPACKAGES

    Reaction Furnace & Fuel Skid - 1 000 t/d - 15/10/2010

    Saudi Arabia LS - Lump Sum E PKhursaniyah

    Angarsk Neftechim Company BDEP FOR ANAHITA PROJECT 1 Technip KTI SpA 11/03/2009Sazeh Consultants Engineering &Construction

    NEW REFINERY FOR ANORC Claus Section Amine Acid Gas 190 t/d RAR 08/04/2015

    Iran LS - Lump Sum BAnahita

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 11 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    NIOEC KHUZESTAN REFINERYPROJECT

    0 Technip KTI SpA 29/01/2009

    Energy Industries Engineering &Design Company

    BASIC ENGINEERING DESIGN- PACKAGE FOR SULPHURRECOVERY AND TAIL GASTREATMENT UNITS

    Tail Gas Treatment - 600 t/d RAR 14/05/2009

    Iran LS - Lump Sum BAbadan

    0 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper600 t/d RAR

    /0 Technip KTI SpA

    Sulphur Degassing - 600 t/d RAR/

    Hormuz Oil Refinery Company HORMUZ OIL REFINERYPROJECT

    0 - 28/01/2009

    Sazeh Consultants Engineering &Construction

    BASIC ENGINEERING DESIGN- PACKAGE FOR SULPHURRECOVERY AND TAIL GASTREATMENT UNITS

    Claus Section Amine Acid Gas ,Sour waterstripper

    475 t/d RAR 07/04/2009

    Iran LS - Lump Sum BBandar Abbas

    0 -Tail Gas Treatment - 475 t/d RAR B

    0 -Incinerator - 475 t/d RAR-

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 12 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Polskie Gornictwo Naftowe IGazownctwo SA

    LMG PROJECT 0 Jacobs Netherland BV 11/08/2008

    Consortium - Polskie Gornictwo Naftowe IGazownctwo SA

    WELL SITES AND CENTRALTREATMENT PLANTDEVELOPMENT

    Amine Regeneration Natural gas 30 000 Nm3/h - 02/08/2013

    Poland LS - Lump Sum E P CLubiatow

    0 -Claus Section Amine Acid Gas 60 t/d - B E P C

    Pars Oil & Gas Company South Pars Development Phase15 & 16

    0 - 24/07/2008

    Payandan On Shore Gas TreatmentFacilties

    Tail Gas Treatment Sour water stripper 515 000 Mkcal/h MDEA 24/03/2009

    Iran LS - Lump Sum /Bandar Assaluyeh

    NIOEC Pars Refinery Project 1 Technip KTI SpA 24/07/2008Technip KTI SpA Sulphur Recovery,Tail Gas

    Treatment & Liquid SulphurDegassing Unit

    Claus Section Amine Acid Gas ,Sour waterstripper

    62 t/d - 09/03/2009

    Iran LS - Lump Sum FEEDShiraz

    1 Technip KTI SpATail Gas Treatment - 62 t/d RAR/

    1 Technip KTI SpASulphur Degassing - 62 t/d -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 13 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    NIOEC Tabriz Shariar Refinery Project 2 Technip KTI SpA 21/07/2008Nargan Engineers andConstructors Company

    Sulphur Recovery,Tail GasTreatment & Liquid SulphurDegassing Unit

    Claus Section Amine Acid Gas ,Sour waterstripper

    180 t/d - 15/12/2008

    Iran LS - Lump Sum FEEDTabriz

    1 Technip KTI SpATail Gas Treatment - 360 t/d RAR/

    2 Technip KTI SpASulphur Degassing - 180 t/d -/

    NIOEC Abadan Refinery Project 2 Technip KTI SpA 20/07/2008Namvaran Consulting EngineringCompany

    Sulphur Recovery,Tail GasTreatment & Liquid SulphurDegassing Unit

    Claus Section Amine Acid Gas ,Sour waterstripper

    230 t/d - 15/12/2008

    Iran LS - Lump Sum FEEDAbadan

    1 Technip KTI SpATail Gas Treatment - 460 t/d RAR/

    2 Technip KTI SpASulphur Degassing - 230 t/d -/

    Canadian Natural Resources Ltd HORIZON OIL SANDSPROJECT

    1 Technip KTI SpA 11/07/2008

    Technip Italy SpA SULPHUR RECOVERY UNIT Claus Section Amine Acid Gas ,Sour waterstripper

    600 t/d - 30/08/2011

    Canada LS - Lump Sum E PFort McMurrey

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 14 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Nynas Refinery AB SR-3 AND TG-1 1 Technip KTI SpA 10/07/2008Technip KTI SpA SULPHUR RECOVERY,TAIL

    GAS TREATMENT, & SULPHURDEGASSING UNIT

    Claus Section Amine Acid Gas ,Sour waterstripper

    24 t/d - 31/07/2011

    Sweden TF - Rates /Nynashamn

    1 Technip KTI SpATail Gas Treatment - 48 t/d RAR/

    Ministry of Oil/South OilCompany (SOC)

    Crude Oil Process Plant -Degassing Station

    1 Technip KTI SpA 10/07/2008

    Progetti Europa & Global S.p.A. Sulphur Recovery Unit Claus Section Amine Acid Gas 18 t/d - 10/07/2011Iraq LS - Lump Sum FEEDNahar Bin Ummar

    1 Technip KTI SpASulphur Degassing - 18 t/d -/

    Galp Energia SA Revamp Existing Unit (23 t/d) &New SRU (27 t/d)

    1 Technip KTI SpA 27/03/2008

    Technip KTI SpA Tail Gas Treatment (50 t/d) Claus Section Amine Acid Gas ,Sour waterstripper

    27 t/d - 27/10/2008

    Portugal LS - Lump Sum FEEDPorto

    1 Technip KTI SpATail Gas Treatment - 50 t/d RAR/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 15 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Egyptian Refining Company Egyptian Refinery Project 3 Technip KTI SpA 11/02/2008Consortium - GS Engineering &Construction/Mitsui

    Technology Lisensor forhydrogen and sulphur recovery

    Claus Section Amine Acid Gas ,Sour waterstripper

    160 t/d - 01/06/2008

    Egypt LS - Lump Sum /Mostorod

    1 Technip KTI SpA- Tail Gas Treatment - 320 t/d RAR

    /

    Motor Oil Hellas New CDU Complex 1 Technip KTI SpA 25/01/2008Technip Italy SpA Sulphur Recovery Unit, Tail Gas

    TreatmentClaus Section Sour water stripper 83 t/d - 25/05/2009

    Greece LS - Lump Sum ECorinth

    1 -Tail Gas Treatment - 166 t/d RAR/

    Total Italia SpA Tempa Rossa Project 2 Technip KTI SpA 10/08/2007Technip Italy SpA Sweetering & Sulphur Recovery

    Unit (GRU-SRU)Claus Section - 30 t/d - 15/10/2007

    Italy TF - Rates FEEDCorleto Perticara

    1 -Tail Gas Treatment - 50 t/d RAR Multipurpose/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 16 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Grupa Lotos SA Refinery Residue UpgradeProject

    1 Technip KTI SpA 21/06/2007

    Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment, Amine Regeneration and Sour Water Treatment

    Tail Gas Treatment - 150 t/d RAR 08/10/2009

    Poland LSTK - Lump Sum TurnKey B E P CGdansk

    2 -Claus Section Amine Acid Gas ,Sour water

    stripper75 t/d -

    /Ecopetrol S.A Proyecto Hidrotratamiento de

    Combustibiles Refineria1 - 18/05/2007

    Technip KTI SpA Modular Claus Unit Claus Section Amine Acid Gas ,Sour waterstripper

    55 t/d - 18/02/2008

    Colombia LS - Lump Sum E PBarrancabermeja

    China PetrochemicalInternational Co.Ltd

    Tiajing Petrochemical IntegratedProject

    1 Technip KTI SpA 18/12/2006

    Technip KTI SpA Sulphur Recovery Unit Tail Gas Treatment - 630 t/d RAR 28/05/2007China LS - Lump Sum B FEEDTianjin

    2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper315 t/d -

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 17 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Saudi Aramco Jubail Export Refinery 3 Technip KTI SpA 01/12/2006Technip Italy SpA Sulphur Recovery Unit, Amine,

    Tail Gas Treatment, Sour WaterStripper & Hydrogen Plant

    Claus Section Amine Acid Gas ,Sour waterstripper

    400 t/d - 30/06/2007

    Saudi Arabia R - Reimbursable B FEEDAl Jubail

    3 Technip KTI SpATail Gas Treatment - 400 t/d RAR B FEED

    Dragon Aromatic (Xiamen) Co.Ltd

    Aromatic Plant 2 Technip KTI SpA 13/11/2006

    Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper

    130 t/d - 13/05/2007

    China LS - Lump Sum B FEEDXiamen

    1 Technip KTI SpATail Gas Treatment - 260 t/d RAR/

    Motor Oil Hellas Topping Unit Expansion Project 1 Technip KTI SpA 23/10/2006Technip Italy SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water

    stripper90 t/d - 31/01/2007

    Greece LS - Lump Sum E P CCorinth

    1 Technip KTI SpATail Gas Treatment - 90 t/d -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 18 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Hellenic Petroleum SA Elefsis Refinery Upgrade Project 1 Technip KTI SpA 11/09/2006Technip KTI SpA Sulphur Recovery Unit Tail Gas Treatment - 280 t/d RAR 20/04/2007Greece LS - Lump Sum B FEEDElefsis

    2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper140 t/d -

    /

    Qatar Liquified Gas Company Plateau Maintenance ProjectAGX Project

    2 - 07/07/2006

    Technip Italy SpA FEED Phase of PMP AGX onShore Treatment Facilities SRU,TGT, Liquid Sulphur Storage andHandling

    Claus Section Amine Acid Gas ,Sour waterstripper

    480 t/d - 31/03/2007

    Qatar LS - Lump Sum B FEEDRas Laffan

    2 -Tail Gas Treatment - 480 t/d RAR Multipurpose/

    Grupa Lotos SA Gdansk Refiney ResidueUpgrading Project

    2 Shell 01/07/2006

    Technip Italy SpA Sulphur Recovery Units Claus Section Amine Acid Gas ,Sour waterstripper

    120 t/d SCOT 30/11/2007

    Poland LS - Lump Sum FS FEEDGdansk

    Canadian Natural Resources Ltd Horizon Oil Sands Projects 2 - 21/06/2006Technip KTI SpA EDS for phase III Support Units

    Sulphur RecoveryClaus Section Amine Acid Gas ,Sour water

    stripper600 t/d - 31/12/2006

    Canada R - Reimbursable B FEEDFort McMurrey

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 19 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    NIOEC Esfahan Refinery 2 Technip KTI SpA 01/06/2006Technip Italy SpA Engineering Design for Amine

    and Sour Water Systems UnitClaus Section Amine Acid Gas ,Sour water

    stripper300 t/d - 31/10/2006

    Iran LS - Lump Sum B FEEDEsfahan

    1 Technip KTI SpATail Gas Treatment - 600 t/d RAR/

    Okta AD Skopje Okta Refinery Project 1 - 22/05/2006Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas 14 t/d - 25/10/2007Macedonia LS - Lump Sum B E P CSkopje

    INA Industrija Nafte D.D. Sisak Refinery 2 Technip KTI SpA 22/12/2005Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water

    stripper65 t/d - 22/07/2007

    Croatia LSTK - Lump Sum TurnKey B E P CSisak

    2 Technip KTI SpATail Gas Treatment - 65 t/d RAR/

    NIOEC Bandar Abbas CondensateRefinery

    2 Technip KTI SpA 25/11/2005

    Technip Italy SpA Sulphur Recovery Unit for GasCondensate Recovery

    Claus Section Amine Acid Gas ,Sour waterstripper

    85 t/d - 30/05/2006

    Iran LS - Lump Sum B FEEDBandar Abbas

    1 Technip KTI SpATail Gas Treatment - 170 t/d RAR/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 20 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Saudi Aramco Khursanya Gas Plant (KGP)Project

    2 - 27/09/2005

    Bechtel Technip Joint Venture(BTJV)

    Sulphur Recovery UnitEquipment

    Claus Section Amine Acid Gas 900 t/d - 02/03/2006

    Saudi Arabia LS - Lump Sum B E PKhursaniyah

    3 -Tail Gas Treatment - 1 000 t/d Superclaus/

    Mazeikiu Nafte AB Modernization Program 0 - 28/08/2005Technip KTI SpA New Crude Oil and Preflash Fired

    HeatersTail Gas Treatment Amine Acid Gas ,Sour water

    stripper0.00 t/d RAR 15/05/2006

    Lithuania LS - Lump Sum B PMazeikiai

    0 -Tail Gas Treatment Amine Acid Gas ,Sour water

    stripper226 t/d RAR

    B P

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 21 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    NIOEC Esfahan Refinery upgrading ofSulphur Recovery Unit

    1 Technip KTI SpA 17/07/2005

    Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment

    Claus Section Amine Acid Gas ,Sour waterstripper

    600 t/d - 17/03/2006

    Iran LS - Lump Sum BEsfahan

    1 Technip KTI SpATail Gas Treatment - 600 t/d RAR/

    1 -Claus Section Amine Acid Gas ,Physical

    solvent acid gas100 t/d -

    /1 Technip KTI SpA

    Tail Gas Treatment - 100 t/d RAR/

    Total South Pars Oil Development Project 2 - 20/05/2005Technip KTI SpA Sulphur Recovery Unit, Tail Gas

    Treatment and DSO Recoveryand Hydrogen Plant

    Tail Gas Treatment - 330 t/d RAR Multipurpose 20/05/2006

    Iran LS - Lump Sum B FEED151

    2 -Claus Section Amine Acid Gas ,Off-gas 330 t/d - B FEED

    Bangchak Petroleum PublicCompany Co.

    Bangchak Refinery 1 - 12/05/2005

    Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper

    50 t/d - 30/10/2005

    Thailand LS - Lump Sum B FEEDBangkok

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 22 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Sinopec Qingdao Refining &Chemical Co.

    Sinopec Qingdao SulphurRecovery Unit

    2 Technip KTI SpA 10/03/2005

    Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper

    375 t/d - 10/03/2006

    China LS - Lump Sum B FEEDQingdao

    1 Technip KTI SpATail Gas Treatment - 757 t/d RAR/

    OC Alliance Sulphur Recovery Facilities 2 Technip KTI SpA 17/01/2005Technip KTI SpA Sulphur Recovery Unit, Tail Gas

    Treatment, RAR, ARUClaus Section Amine Acid Gas ,Sour water

    stripper20 t/d - 15/08/2005

    Russia LS - Lump Sum B FEEDKhabarovsk

    1 Technip KTI SpATail Gas Treatment - 40 t/d RAR/

    Enoc Processing Company L.L.C Jebel Ali Refinery 2 Technip KTI SpA 22/12/2004Technip KTI SpA Sulphur Recovery Unit, Tail Gas

    Treatment UnitClaus Section Amine Acid Gas ,Sour water

    stripper26 t/d - 22/12/2005

    UAE LS - Lump Sum B FEEDJebel Ali

    1 Technip KTI SpATail Gas Treatment - 35 t/d RAR/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 23 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Hindustan Petroleum CorporationLtd

    Visakh Refinery- 2nd Train 1 BP Amoco 09/12/2004

    Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper

    65 t/d - 26/05/2005

    India LS - Lump Sum B FEED PVisakhpatman

    1 BP AmocoTail Gas Treatment - 65 t/d CBA/

    FPCL (SaudiAramco+Exxon+Sinopec JV)

    Fujian Petrochemical IntegratedProject

    1 Technip KTI SpA 12/11/2004

    Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment, RAR 744

    Tail Gas Treatment - 744 t/d RAR 26/04/2005

    China LS - Lump Sum B FEEDFujian

    2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper372 t/d -

    /

    NIOEC Arak Refinery Expansion &Products Upgrading Project

    2 Technip KTI SpA 21/10/2004

    JGC Corp Amine Units and AmineRegeneration Units

    Claus Section Amine Acid Gas ,Sour waterstripper

    320 t/d - 14/03/2005

    Iran LS - Lump Sum B FEEDArak

    1 Technip KTI SpATail Gas Treatment - 640 t/d RAR/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 24 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    ERG Raffinerie Mediterranee Srl (Ergmed)

    Northern Refinery 1 Technip KTI SpA 01/06/2004

    Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment

    Tail Gas Treatment - 150 t/d RAR 15/05/2006

    Italy LS - Lump Sum B E P CPriolo

    2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper75 t/d -

    /

    Petrochina Co. DalianPetrochemical Co.

    Sulphur Recovery Unit Facility 3 Technip KTI SpA 09/03/2004

    Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment

    Claus Section Amine Acid Gas ,Sour waterstripper

    260 t/d - 30/12/2004

    China LS - Lump Sum B FEEDDalian

    2 Sirtec NigiTail Gas Treatment - 390 t/d RAR/

    Motor Oil Hellas Refinery Expansion 2005 1 Technip KTI SpA 01/01/2004Technip Italy SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water

    stripper70 t/d - 31/12/2005

    Greece LS - Lump Sum FS E P CCorinth

    1 Technip KTI SpATail Gas Treatment - 70 t/d RAR/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 25 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    IES (Italiana Energia e ServiziSpA)

    Sulphur Recovery Facilities 1 WorleyParsons 05/12/2003

    Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper

    62 t/d - 03/08/2005

    Italy LS - Lump Sum B E P CMantova

    Saudi Aramco Riyadh Refinery 1 - 23/10/2003Technip Italy SpA Sulphur Recovery Unit & Sulphur

    Degassing 3rd TrainClaus Section Amine Acid Gas ,Sour water

    stripper70 t/d - 31/10/2005

    Saudi Arabia LS - Lump Sum E P CSRiyadh

    1 Goar AlllisonSulphur Degassing - 70 t/d -/

    Turkmenneftegas New Diesel Hydrotreater Project 1 - 23/06/2003Technip Germany Sulphur Recovery Unit, RAR

    MultipurposeTail Gas Treatment - 23 t/d RAR Multipurpose 31/12/2005

    Turkmenistan LS - Lump Sum B E PTurkmenbashi

    1 -Claus Section Amine Acid Gas ,Sour water

    stripper23 t/d -

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 26 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    NIOEC Teheran Refinery 2 Technip KTI SpA 27/05/2003Technip KTI SpA New Sulphur Recovery Unit

    (110t/d) Revamp (102 t/d) &TailGas Treatment (212 t/d)

    Claus Section Amine Acid Gas ,Sour waterstripper

    110 t/d - 27/11/2007

    Iran LS - Lump Sum B FEEDTehran

    1 Technip KTI SpATail Gas Treatment - 212 t/d RAR/

    Sinopec International JinlingCompany

    Sulphur Recovery Plant 1 - 22/05/2003

    Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment

    Tail Gas Treatment - 300 t/d RAR 30/06/2005

    China LS - Lump Sum B FEED PNanjing

    1 -Claus Section Amine Acid Gas ,Sour water

    stripper300 t/d -

    /

    Sinopec International Company Sulphur Recovery Plant 1 Technip KTI SpA 21/05/2003Technip KTI SpA Sulphur Recovery Unit, Tail Gas

    TreatmentClaus Section Amine Acid Gas 160 t/d - 30/12/2004

    China LS - Lump Sum B FEED P SUNanjing

    1 Technip KTI SpATail Gas Treatment - 160 t/d -/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 27 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    IES (Italiana Energia e ServiziSpA)

    Sulphur Recovery Facilities 0 WorleyParsons 13/05/2003

    Technip KTI SpA Revamping Sulphur Recoverywith Oxygen Enrichment

    Claus Section Amine Acid Gas ,Sour waterstripper

    62 t/d - 30/10/2003

    Italy LS - Lump Sum FEEDMantova

    Takreer Unleaded Gasoline Low SulphurGas Oil Project

    1 - 04/09/2002

    Technip Italy SpA Sulphur Recovery Unit 406 Tail Gas Treatment - 50 t/d CBA 30/11/2004UAE LS - Lump Sum B FEED PRuwais

    1 -Claus Section Amine Acid Gas ,Sour water

    stripper50 t/d -

    /

    Dolphin Energy Ltd Dolphin Project Upstream andCompression Facilities

    2 Technip KTI SpA 01/08/2002

    Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment, RAR Multipurpose

    Claus Section Amine Acid Gas ,Off-gas 585 t/d - 28/02/2003

    Qatar LS - Lump Sum B FEEDRas Laffan

    2 Technip KTI SpATail Gas Treatment - 585 t/d RAR Multipurpose/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 28 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Hellenic Petroleum SA HAR Modernization Project 2 BP Amoco 30/05/2002Technip Italy SpA Revamping Sulphur Recovery

    Unit and Amine Unit, CBATail Gas Treatment Amine Acid Gas ,Sour water

    stripper100 t/d CBA 30/09/2002

    Greece LS - Lump Sum B FEEDCorinth

    2 BP AmocoClaus Section Amine Acid Gas ,Sour water

    stripper100 t/d -

    /

    Saudi Aramco BERRI FACILITIES GAS PLANT 2 Technip KTI SpA 14/05/2002Technip Italy SpA AIR PREHEATER FURNACE &

    SULPHUR RECOVERY UNITClaus Section Amine Acid Gas 900 t/d Superclaus 30/09/2003

    Saudi Arabia LS - Lump Sum /Qatif

    1 Technip KTI SpAClaus Section Amine Acid Gas 850 t/d Superclaus/

    1 Technip KTI SpAClaus Section Amine Acid Gas 750 t/d Superclaus/

    2 -Tail Gas Treatment - 900 t/d Superclaus/

    Tamoil SA TRC 2000 Project 1 Technip KTI SpA 25/01/2002Technip KTI SpA Sulphur Recovery Unit, RAR Tail Gas Treatment - 25 t/d RAR 31/12/2003Switzerland LS - Lump Sum B E P C SUCollombey

    1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper25 t/d -

    /

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 29 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Saudi Aramco RIYADH REFINERY 2 - 01/01/2002Technip Abu Dhabi SULPHUR RECOVERY UNITS &

    SULPHUR DEGASSING1ST&2ND TRAIN

    Claus Section Amine Acid Gas ,Sour waterstripper

    70 t/d - 31/12/2004

    Saudi Arabia LS - Lump Sum E PRiyadh

    2 Goar AlllisonSulphur Degassing - 70 t/d -/

    Motor Oil Hellas New Sulphur Recovery Unit 1 Technip KTI SpA 15/10/2001Technip Italy SpA Sulphur Recovery Unit, Tail

    GasTreatment, RARTail Gas Treatment - 110 t/d RAR 30/12/2002

    Greece LS - Lump Sum B E P CCorinth

    0 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water

    stripper0.00 -

    /

    Kazakhoil Atyrau Refinery 1 BP Amoco 01/01/2001Technip KTI SpA Sulphur Recovery Unit, Tail Gas

    Treatment, CBATail Gas Treatment - 25 t/d CBA 31/12/2001

    Kazakhistan LS - Lump Sum B FEED P SUAtyrau

    1 BP AmocoClaus Section Amine Acid Gas ,Sour water

    stripper25 t/d -

    /

    Indian Oil Corp Ltd. (IOCL) Mathura Refinery 1 Technip KTI SpA 01/01/2001Technip KTI SpA Sulphur Recovery Unit 180

    t/d,Tail Gas Treatment, RARTail Gas Treatment - 214 t/d RAR 31/12/2002

    India LS - Lump Sum B FEED P SUMathura

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 30 of 31

  • SULPHUR RECOVERY UNIT REFERENCES

    OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION

    Q-CHEM Q-Chem Petrochemical Complex 2 Technip KTI SpA 12/12/2000Technip USA Sulphur Recovery Unit, Tail Gas

    TreatmentClaus Section Amine Acid Gas 93 t/d - 30/04/2001

    Qatar LS - Lump Sum B E P SUMesaieed

    1 Technip KTI SpATail Gas Treatment - 186 t/d RAR/

    Qatar Liquified Gas Company Sulphur Recovery ExpansionProject

    2 Jacobs Netherland BV 02/09/2000

    Technip Italy SpA Reject Gas Incinerator Package Claus Section Amine Acid Gas ,Sour waterstripper

    244 t/d - 30/03/2002

    Qatar LS - Lump Sum E PRas Laffan

    2 Jacobs Netherland BVTail Gas Treatment - 244 t/d Superclaus/

    Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance

    Page 31 of 31