18
Supplementary operating instructions A2553.8.1E / 5 KRT – Guide Rails Series Size Motor Size Material KRT DN80...DN200 (excludes 200-500,200-501 and 200-631) 82...232 (2 pole) 24...1554 (4 pole) 46...1006 (6 pole) G (Cast Iron) Submersible motor pumps with guide rails These operating instructions contain fundamental information and precautionary notes. It is absolutely necessary to read them thoroughly prior to installation and first commissioning. This manual has to be used together with the operating instructions for the pump at all times
Transcript
Page 1: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

Supplementary operating instructionsA2553.8.1E / 5 KRT – Guide Rails

Series

Size

Motor Size

Material

KRT

DN80...DN200(excludes 200-500,200-501 and200-631)

82...232 (2 pole)24...1554 (4 pole)46...1006 (6 pole)

G(Cast Iron)

Submersible motor pumps with guide rails

These operating instructions contain fundamental information and precautionary notes.It is absolutely necessary to read them thoroughly prior to installation and first commissioning.This manual has to be used together with the operating instructions for the pump at all times

Page 2: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

2

Contents Page

1 Installation / Assembly................................................................................................................................... 32 Wet-well installation – Guide rails.................................................................................................................. 53 Outline Drawings............................................................................................................................................ 64 Exploded View................................................................................................................................................ 18

Page 3: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

3

1 Installation/Assembly

1.1 Safety regulations

Persons are not permitted to enter a confined space withoutspecific precautions taken in accordance with currentstandards.

1.2 Checks prior to installation and firstcommissioning

Construction layout must be in accordance with themeasurements set out in the dimensions table. Determine thecorrect anchorage position of the discharge elbow, 72-1 so theguide rails (not included in the KSB scope of supply) wheninstalled, will run parallel and plumb.The construction of the concrete should be of sufficient strengthto ensure a safe and functional installation. The concretefoundation must have set before installing the discharge elbow,72-1. The surface must be level and even.

1.2.1 Notes

Also take into account the upper guide rail brackets.Dimensions and space requirements are given in the dimensiontable. Fix the upper guide rail bracket by means of stainlesssteel anchor bolts (anchor bolts are not included in the KSBscope of supply) at the edge of the sump opening. Dataconcerning borehole diameters and depth as well as the holepattern of the bracket are to be determined by the contractor.

Never fasten the brackets directly to a curved sump wall.

Dimensions for guide rail installations are given in thedimension table. Additional dimensions can be found in theKRT operating manual.

1.3 Installation of the pump/unit

Inspect the pump and power/control cable for transportdamages prior to installation. Check it as described in thesection “ First Commissioning” of the operating instructions. Aseparate data plate for the pump and motor data is included inthe KSB scope of supply. The extra data plate should be fixedoutside the pump sump (e.g. control cabinet,) so that it isclearly visible.

1.3.1 Assembly of the installation kit

The following installations kits are available for assembly/installation of the KRT pump unit:- Stationary wet-well installation with guide cable

(see operating instructions of the pump)- Portable installation

(see operating instructions of the pump)- Stationary wet-well installation with guide rails

(see present supplementary instructions)

1.4 Stationary wet-well installation with guiderails.

1.4.1 Description

In a stationary wet-well installation, the pump unit can belowered and lifted out of the pump sump by means of guiderails at any liquid level in the sump. Safely guided by 2 verticalguide rails, the pump slides into the sump or tank and attachesitself automatically to the discharge elbow fixed at the bottom.Sealing between the pump and discharge elbow is achieved bythe weight of the pump. A profile gasket between the pump anddischarge elbow assures a water tight leak-proof connection.There is no need to enter the sump for maintenance andinspection of the pump.

1.4.2 Installation of the guide claw

Fit the guide claw to the discharge nozzle of the pump.Do not forget to place the washers 550.35 under the hex nuts920.35. Nuts must be evenly tightened according toinstructions:

Tightening torque:M16 (A4-70) with DN40, 80 and 100 : 111 lbf-ft (150Nm)M20 (A4-70) with DN 150 and 200 : 214 lbf-ft (290Nm)

Sealing between the guide claw 732 and discharge elbow 72-1is accomplished by a profile gasket – 410 (DN 80....150) orround cord – 99-6 (DN 200).

The entire assembly has been pre-assembled at the factory.

1.4.3 Installation of mounting bracket / discharge elbow/ bottom guide rail bracket

Construction of the concrete foundation has to be of sufficientstrength to ensure safe and functional fixing of the guide railsystem and the discharge elbow

Level and anchor the discharge elbow 72-1. The guide railsmust be installed absolutely parallel and plumb.

KRT 80, 100 and 150’s require 2” diameter guide rails, schedule40 or 80 (supplied by others). KRT 200’s require 3” diameterguide rails, schedule 40 or 80 (supplied by others).

Mount the bottom guide rail brackets 718 on the dischargeelbow 72-1 according to the outline drawing item 3 in such away that dimension “ G “ between the guide rails centerlinesand the centerline of the discharge elbow is complied with.Fix each bottom guide rail bracket 718 with:

• Screw 914.1/.2 (for DN 80....200)Data concerning tightening torques of screw 914.1/.2:M12 (A4-70) for DN80 and DN100: 44 lbf-ft (60Nm)M16 (A4-70) for DN150 and DN200: 111 lbf-ft (150Nm)

The installation of the bottom guide rails bracket ,718, iscompleted after tightening the anchor bolts (not in the KSBscope of supply) for the discharge elbow 72-1.

Continue with the installation and fitting of the discharge pipe tothe discharge elbow.

Install the guide rails (not included in the KSB scope of supply)onto the bottom guide rails brackets 718 at the discharge elbow72-1Cut and fit the guide rails to required lengths.

See the exploded view drawing attached for more details.

Page 4: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

4

CAUTION ! Make sure the guide rails are absolutelyplumb; it is important for thesuspension and guidance of the pumpduring installation!

In case of deeper installations the scope of supply may includeintermediate brackets that will function as spacers between theguide rails. It depends on the construction whether a support atthe discharge pipe or sump wall becomes necessary.

1.4.4 Installation of the Lifting Chain / Lifting Cable orRope on Motor Housing

The chain of all sizes is attached to the top of the motor casingtoward the back and opposite the discharge nozzle using ashackle 59-17. Depending on the motor and hydrauliccombination, the pump will be suspended from this point with aninclination of approx. 5-10 degrees. This guarantees a problem– free lowering of the pump, provided that the suspension pointof the lifting equipment is directly above the pump.

Caution: Skewed lifting is to be avoided as it may causejamming of the pump guide claw to the guide rails.

1.4.5. Installation of the pump

Please check, prior to the installation of the pump, dimension Gand S according to the table provided under “3. OutlineDrawing“ Of utmost importance is the perfectly verticalinstallation of the guide rails. This work has to be done prior tothe introduction of the pumped liquid into the sump to guaranteea smooth lowering and lifting of the pump. Afterwards, correctassembly slips or misalignments if any. Guide the pump fromabove over the bracket, the pump will attach itself automaticallyto the discharge elbow 72-1 and will be connected to thedischarge pipe and ready for operation. Attach the lifting chainto the hook on the upper guide bar bracket or at the edge of thetank in an appropriate manner.

1.4.6 Increaser Installation

For installation of discharge elbow with increasers see downthe drawing for proper dimensioning and placement.

Page 5: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

5

2. Wet-well installation – GUIDE RAILS

Page 6: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

6

3. Outline drawings

Kits Denominations Part nº Part Description Qt

718.1/.2 Bottom guide railbracket 2

914.1/.2 Socket head capscrew 2

72-1 Discharge Elbow 1

Bottom Guide RailBracket Kit

932.1/.2 Circlip 2550.35 Washer 8 5)

732 Claw 1

914.35 Socket head capscrew 1) 4

902.35 Stud 2) 8 5)

920.35 Nut2) 8 5)

99-6 Round cord 3) 1

Claw Kit

410 Profile Gasket 4) 1

894 Upper Guide RailBracket 2

901.37 Hexagon headbolt 2

920.37 Nut 4

Upper guide railBracket Kit

550.31 Disc 2

Do not groutunder bottomguide pipe

Page 7: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

7

3.1 KRT 80-200 – Dimension Table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

4 6 1/4 7 1/2 9 8 13/16Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)14 19 1/4 18524 19880-200/34

3 19 7/8 19 13/16 13 5/8 15 3/4 3 7/8 23 27 3/4 23209

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 8: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

8

3.2 KRT 80-250, 80-251, 80-315 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

4 6 1/4 7 1/2 9 8 13/16Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)80-250 54 305

74 23 1/2 335114 365164 24 5/8 39046 30566 23 1/2 33096 355

80-250/80-251

126

4

24 5/8

23 15/16 15 18 1/2 3 27 1/8 31 7/8 26 3/8

38582 24 23 1/2 335

122 340172 25 1/4 23 3/4 14 27 31 1/4 26 3/16

39080-315/

232

3 1/8

30 3/4 25 1/8 15 3/4

18 1/4 3 7/16

28 3/8 33 1/8 27 3/8 560

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 9: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

9

3.3 KRT 100-200 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

4 6 1/4 7 1/2 9 8 13/16Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)24 196100-200/ 34 4 3/8 20 5/8 19 11/16 12 5/8 16 1/8 4 7/8 23 3/8 28 3/8 22 9/16 205

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 10: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

10

3.4 KRT 100-250, 100-251 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

4 6 1/4 7 1/2 9 8 13/16Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)54 31074 23 5/8 345

114 375100-250/100-251/

164

424 13/16 400

46 31066 23 5/8 34596 375100-251

126

424 13/16

24 15 1/4 19 1/8 4 7/16 27 3/4 32 11/16 26 7/16

400

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 11: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

11

3.5 KRT 100-316, 100-401 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

4 6 1/4 7 1/2 9 8 13/16Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)114 440164 25 13/16 26 7/16 30 1/8 35 1/16 28 9/16 460234 31 5/16 610100-316

294

4

30 1/8 27 3/416 9/16 21 7/16 4 13/16

31 1/2 36 7/16 29 13/16 650234 36 1/4 840294 35 1/4 32 5/16 35 3/4 40 3/4 875354 1170504 1225654

41 3/4 35 1/16 38 3/4 43 11/161305

804 59 1/4 2065954 2195

100-401

1104

5

67 1/8 32 5/16

23 1/4 24 3/4 4 15/16

35 3/4 40 15/16

43 5/16

2285

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 12: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

12

3.6 KRT 150-251, 150-315 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

6 8 1/2 9 1/2 11 8 7/8Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)46 43066 26 3/4 455150-251

(D) 966

2830 11/16 20 11/16 25 11/16 8 7/16 35 3/4 42 5/16 33 7/16

50046 50066 28 52096 545

126 29 1/8 565206 34 5/8 700

150-315(F, E, K)

266

6

33 1/2

31 11/16 21 1/8 25 5/8 8 1/2 36 1/4 42 3/4 33 15/16

755

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 13: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

13

3.7 KRT 150-315 (D), 150-401 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

6 8 1/2 9 1/2 11 8 7/8Dimensions in inches

Dimensions in inchesKRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)96 695

126 30 5/16 720150-315(D) 206

635 3/4

33 9/16 23 5/8 26 3/4 6 5/16 38 9/16 42 1/16 37 3/8860

504 1370654 45 1/4 37 11/16 7 13/16 42 15/16 49 7/16 1445804 62 3/4 2205954 2340

1104 24251304 29801554

70 11/16 36 1/2 5 1/8 41 9/16 48 7/16

3090206 39 15/16 970266 39 34 15/16 41 9/16 48 1/16 1015326 1305406 1370506

45 1/4 37 11/167 13/16

42 15/16 49 7/161445

606 62 3/4 2985806 2625

150-401(F, E, K)

1006

6

70 11/16 36 1/2

23 3/4 28 15/16

5 1/8 41 9/16 48 7/16

47 1/4

27801) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 14: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

14

3.8 KRT 151-401 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

6 8 1/2 9 1/2 11 8 7/8Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)654 45 1/4 37 11/16 7 13/16 42 15/16 49 7/16 47 1/4 1445804 62 3/4 2205954 2340

1104 70 11/16 24251304 29801554 73 3/4

36 1/2 5 1/8 41 9/16 48 7/16 43 5/16

3090326 1305406 1370506

45 1/4 37 11/16 7 13/16 42 15/16 49 7/16 47 1/41446

606 62 3/4 2985806 2625

151-401(K)

1006

6

70 11/16 36 1/2

23 3/4 28 15/16

5 1/8 41 9/16 48 7/16 43 5/162780

1) Lowest shut-off point for automatic operation

Do not groutunder bottomguide pipe

Page 15: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

15

3.9 KRT 200-280, 200-281, 200-315 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

8 10 9/16 11 5/8 13 3/8 8 1Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)66 28 3/4 70596 730

126 29 7/8 750206 35 1/2 855

200-280/200-281(K)

266

8

34 1/4

37 11/16 23 1/2 30 7/8 7 5/8 42 3/8 49 39 5/8

94596 830

126 32 5/16 830200-315(D) 206

837 3/4

40 13/16 27 9/16 32 13/16 7 1/16 46 5/8 53 3/8 47 1/4985

1) Lowest shut-off point for automatic operation

Page 16: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

16

3.10 KRT 200-330 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

8 10 9/16 11 5/8 13 3/8 8 1Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)504 1535654 42 11/16 41 25 3/16 46 13/16 53 9/16 1610804 60 5/8 2470954 2690

1104 68 1/2 28901304 32451554 71 5/8

39 13/16 24 3/4 45 11/16 52 3/8

3355206 37 3/8 1115266 36 7/16 39 5/8 45 1/2 52 3/16 1170326 1480

200-330(K)

406

10

42 11/16 4125 3/16

32 13/16 10 5/8

46 13/16 53 9/16

47 1/4

1535

1) Lowest shut-off point for automatic operation

Page 17: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

17

3.11 KRT 200-401 – Dimension table

Flange – ANSI B 16.1 Class 125DN3 gf Kf Df zf lf

8 10 9/16 11 5/8 13 3/8 8 1Dimensions in inches

Dimensions in inches

KRT ...-.../... DN1 a1 b1 d e1 h1 k1 l1 N

Weight (lbs)

G (material)804 64 3/16 2580954 2800

1104 72 1/16 30001304 33551554 75 3/16

38 43 11/16 50 3/8

3465266 40 3/16 37 11/16 43 1/2 50 3/16 1115326 1400406 1470506

46 7/16 39 51 9/161545

606 64 3/16 2670806 2890

200-401(K)

1006

8

72 1/16 38

25 3/16 30 13/16 8 11/16

44 13/16

50 3/8

47 1/4

3045

1) Lowest shut-off point for automatic operation

Page 18: Supplementary operating instructions KRT – Guide Rails ...€¦ · KRT 80, 100 and 150’s require 2” diameter guide rails, schedule 40 or 80 (supplied by others). KRT 200’s

KRT – Guide Rails

18

4. Exploded view

Kits Denominations Part no. Part Description Qt718.1 Right Bottom guide rail bracket 1 Notes718.2 Left Bottom guide rail bracket 1 1-) Only applied for sizes 100-200914.1 Socket head cap screw 1 2-) Except for sizes 100-200914.2 Socket head cap screw 1 3-) Only applied for size DN 20072-1 Discharge Elbow 1 4-) Except for size DN 200932.1 Circlip 1 5-) For sizes 80-200, 80-251 and 80-315, 4 pieces

Bottom Guide RailBracket Kit

932.2 Circlip 1 6-) Do not grout under part number 718.1 and 718.2550.35 Washer 8 5 )

732 Claw 1914.35 Socket head cap screw1 ) 4902.35 Stud 2 ) 8 5 )

920.35 Nut 2 ) 8 5 )

99-6 Round cord 3 ) 1

Claw Kit

410 Profile Gasket 4 ) 1


Recommended