UITP, CH Brussels, 10-12-09 1/4 Support and User Group -Kick-off-meeting- Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name Initials Organisation Participant Name Initials UITP Caroline Hoogendoorn CH Q’Straint, Europe Alexander Roth AR UITP Yves Amsler YA Metro Lisboa Luis Arega Lopes LL TRIT Florian Steiner FS Ferrocarrils de la Generalitat Francisco Tomás Gómez FG TRIT Peter Wigger PW Ferrocarrils de la Generalitat Juan José Gimeno JG INRETS Vincent Benard VB De Lijn Paul Arends PA INRETS Latifa Furlan LF RATP Jean-Paul Richard JR RATP Daniel Coineau DC TUD Jörg Schütte JS TUD Astrid Schindelhauer AS BME Sághi Balázs SB Bus & Rail Hartmut Schmidt HS UNIFE Bernard von Wullerstorff BW TelSys Dr. Sven Scholz SS Metro de Madrid S.A. María Adela Matamoros Arroyo AM
Transcript
Page 1: Support and User Group -Kick-off-meeting-€¦ · -Kick-off-meeting-Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name Initials Organisation

UITP, CH Brussels, 10-12-09

1/4

Support and User Group

-Kick-off-meeting-

Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name

Initials Organisation Participant Name

Initials

UITP Caroline Hoogendoorn CH Q’Straint, Europe Alexander Roth

AR

UITP Yves Amsler YA Metro Lisboa Luis Arega Lopes

LL

TRIT Florian Steiner FS Ferrocarrils de la Generalitat

Francisco Tomás Gómez

FG

TRIT Peter Wigger PW Ferrocarrils de la Generalitat Juan José Gimeno

JG

INRETS Vincent Benard VB De Lijn Paul Arends

PA

INRETS Latifa Furlan LF

RATP Jean-Paul Richard JR

RATP Daniel Coineau DC

TUD Jörg Schütte JS

TUD Astrid Schindelhauer AS

BME Sághi Balázs SB

Bus & Rail Hartmut Schmidt HS

UNIFE Bernard von Wullerstorff BW

TelSys Dr. Sven Scholz SS

Metro de

Madrid S.A.

María Adela Matamoros

Arroyo

AM

Page 2: Support and User Group -Kick-off-meeting-€¦ · -Kick-off-meeting-Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name Initials Organisation

UITP, CH Brussels, 10-12-09

2/4

PRESENTATIONS OF CONSORTIUM PARTNERS

ITEM TITLE PARTNER

1.

2. Presentation MODsafe project and project structure http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_generaloverview.pdf

TRIT

3. WP01 - Description of the State of the Art http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp1.pdf

INRETS

4. WP02 - MODSAFE Hazard and Risk Analysis http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp2.pdf

TUD

5. WP03 - Hazard Control and Safety Measures Analysis http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp3.pdf

Bombardier

6. WP04 - Common Safety Requirements http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp4.pdf

Telsys

7. WP05 - Functional and Object oriented Safety Model http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp5.pdf

TUD

8. WP06 - Safety Life Cycle Responsibilities http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp6.pdf

TRIT

9. WP07 - Acceptance, Approval, Certification http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp7.pdf

BME

10. WP08 - Level of sophistication and relevant technology of security surveillance systems http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp8.pdf

UITP

11. WP09 - Global approach for Integrated security needs http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp9.pdf

UITP

12. WP12 – Dissemination and Exploitation http://ftp.uitp.org/ftproot/euroteam/modsafe_sug_wp12.pdf

UITP

Page 3: Support and User Group -Kick-off-meeting-€¦ · -Kick-off-meeting-Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name Initials Organisation

UITP, CH Brussels, 10-12-09

3/4

Time Item Comments 11:10

– 11:25

Welcome and Presentation of attendees

Brigitte Ollier (UITP, Director EU Projects Unit) opened the meeting and welcomed all the participants. Subsequently, all participants introduced themselves. Caroline Hoogendoorn is replacing Sebastian Emig as European Projects Manager and namely concerning MODsafe. Minor changes in the sequence of the presentation were introduced and WP3 was not going to be presented.

11:25 –

11:40

Presentation of the MODsafe project and project structure

TRIT presented the idea behind MODsafe, explained why the project was needed and what the expected project results were. He also provided an overview of project size, structure, and participating partners.

11:40 –

16:00

Presentation of the MODsafe Work Packages (WP) by the WP leaders

Nine WP leaders presented the WP managed by them, as follows:

- WP1 Description of the State of the Art (INRETS)

- WP2 MODSafe Hazards and Risks Analysis (TUD)

- WP4 Common Safety Requirements (TelSys)

- WP5 Functional and Object oriented Safety Model (TUD)

- WP6 Safety Life Cycle Responsibilities (TRIT)

- WP7 Acceptance, Approval, Certification (BME)

- WP8 Level of sophistication and relevant technology of security surveillance systems (UITP)

- WP9 Global approach for Integrated security needs (UITP)

- WP12 Dissemination and Exploitation (UITP)

The presentations included the objectives and tasks of each WP, timescale and key deliverables.

16:00 –

16:15

Concluding remarks YA informed the operators that: - their feedback was welcome on different documents

(to start, DC has send them the draft deliverable D6.1. for comments – deadline: January 8th – comments to be sent directly to RATP and TRIT)

- they can participate in different working groups (if they wish to do so, they must contact CH)

- CH was their contact point if they had any questions ([email protected])

The next network of operators will be held in Brussels (UITP premises) on May 27th.

Page 4: Support and User Group -Kick-off-meeting-€¦ · -Kick-off-meeting-Time: 10.12.2009 11:00h – 16:30h Place: UITP, Brussels Participants: Organisation Participant Name Initials Organisation

UITP, CH Brussels, 10-12-09

4/4


Recommended