1. Secure instruments needed. 2. Project 1 to 4 meters from the edge of the building and mark starting point.
Transcript
Page 1: Surveying procedures.docx

1. Secure instruments needed.

2. Project 1 to 4 meters from the edge of the building and mark starting point.

3. Have one observer hold the compass and stand at the starting point. Turn body around so that the needle in the compass points North while still standing at the starting point.

Page 2: Surveying procedures.docx

4. Let one of the rodmen stand

Page 3: Surveying procedures.docx