Syracuse Schools Construction Plans

Date post: 07-Aug-2018
Category:
Upload: the-post-standard
View: 216 times
Download: 0 times
Share this document with a friend
28
Presented by The Facilities Management Group TFMG / TFMG Architecture, PC in conjunction with EMTEC Engineers, LLC
Transcript

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 1/28

Presented by

The Facilities Management Group

TFMG / TFMG Architecture, PC

in conjunction with

EMTEC Engineers, LLC

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 2/28

Why are we here today?

• To solicit public comments to help us create the ComprehensivePlan 

JSCB Phase 2 Comprehensive Plan defines:

• Projects to be constructed in eligible schools

• Scope of renovations and funds allocated to each school

• Financing of projects

• Project schedules

• Development & Diversification Plan for Workforce & Business

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 3/28

Joint Schools Construction Board (JSCB):

• Created by Special Legislation by New York State in 2006

• Legislation is required due to NYS regulations pertaining to

municipal financing and borrowing

• Multiple phases of construction were anticipated to renovate all

schools

• Phase 1 is substantially complete; Phase 2 is in planning stages

• Buffalo and Rochester have similar legislation

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 4/28

JSCB Phase 1:

•$156 million dollars of construction - completed in 2014

• Roof Replacements Clary Bellevue Middle at Shea

• Fowler High School Total renovations / addition

• H.W. Smith K-8 Total renovations / addition

• Institute of Technology Total renovations / addition

• Dr. Weeks Elementary

Total renovations

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 5/28

JSCB Phase 2:

• Legislation enacted in 2014

• Up to $300 million of construction projects

• NYS comptroller to review financial plan and determine the

amount of construction the JSCB can afford

• Projects at up to 15 schools which are defined in the Legislation

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 6/28

1. Bellevue Elementary School

2. Clary Middle School

3. Corcoran High School

4. Danforth Middle School

5. Ed Smith K-8 School

6. Expeditionary Learning

7. Fowler High School

8. Frazer K-8 School

9. Grant Middle School

10. Greystone Building

11. Henninger High School

12. Huntington K-8 School

13. Nottingham High School

14. Shea Building

15. Westside Academy at Blodgett

By legislation, eligible buildings are: 

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 7/28

JSCB Phase 2 Financing:

• NY State Education Department (NYSED) determines a MaximumCost Allowance (MCA) for each building based on a statewide

formula

• MCA is also called building aid

• In many cases, the District’s renovation needs for a particular

building exceeds the MCA

• Challenge is to prioritize renovations to maximize use of MCA and

minimize local taxpayer cost

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 8/28

2011 District Wide Master Plan:

• Significant Findings:

Limited seating capacity in High Schools

Stable enrollment anticipated for 20 years (~21,000 students)

Existing school facilities will be needed for the next 20 years

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 9/28

2014 Annual Visual Inspections (AVI):

• NY State mandated inspection and report

• Documents the conditions of all public K-12 School facilities

in NYS

• $908 million required to repair Syracuse’s facilities  Does not include new programming

Costs will increase in future due to inflation

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 10/28

1. Bellevue ES = $21.5 mil

2. Clary MS = $34.4 mil

3. Corcoran HS = $64.9 mil

4. Danforth = $32.4 mil

5. Ed Smith K-8 = $37.8 mil

6. Expeditionary Learning = $12 mil

7. Fowler High School = $2.5 mil

8. Frazer K-8 School = $7.1

9. Grant Middle School = $51.6 mil

10. Greystone Building = $64.8 mil (est.  )

11. Henninger High School = $62.8 mil

12. Huntington K-8 School = $39.7 mil

13. Nottingham HS = $76.3 mil

14. Shea Building = $36.7 mil

15. Westside Academy at Blodgett = $57 mil

TOTAL : 601.5 million

AVI Needs of Eligible Buildings: 

Building is currently unoccupied and does not have an existing AVI

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 11/28

JSCB Phase 2 Goals:

• Prioritize and complete as many needed renovations as possible

• Implement facilities improvements to enhance instruction

Align with instructional programs in each school

Career Technical Education (CTE) spaces

Project Lead The Way facilities

Technology upgrades

Improve security

• Minimize local taxpayer costs (local share)

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 12/28

BELLEVUE ELEMENTARY SCHOOL

Major Needs: Interior renovations – entire building

Walls

Windows

New roof

New mechanical, electrical and

plumbing systems

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 13/28

CLARY MIDDLE SCHOOL

Major Needs: Window replacements

New fire alarm system

ADA improvements

Interior renovations

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 14/28

CORCORAN HIGH SCHOOL

Major Needs: Replacement of HVAC systems and

related work

Interior renovations

Auditorium

Bridges

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 15/28

DANFORTH MIDDLE SCHOOL

Major Needs: New electrical, mechanical and

plumbing systems

Interior and exterior renovations

Athletic fields

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 16/28

ED SMITH K-8 SCHOOL

Major Needs: New mechanical, electrical and

plumbing systems

New windows

Interior renovations

Site work

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 17/28

EXPEDITIONARY LEARNING

Major Needs: New HVAC system

Structural repairs

Roof replacement

Exterior masonry

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 18/28

FOWLER HIGH SCHOOL

Major Needs: New athletic facilities

Auditorium and locker room renovations

Roofing replacement

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 19/28

FRAZER K-8 SCHOOL

Major Needs: Masonry repairs

Site work

Window replacements

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 20/28

GRANT MIDDLE SCHOOL

Major Needs: Courtyard roofing

Window replacement

Masonry repairs

Stone façade replacement

Pool renovations

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 21/28

GREYSTONE BUILDING

Major Needs: Interior renovations

Masonry renovations

Roofing replacement

New mechanical, electrical and

plumbing systems

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 22/28

HENNINGER HIGH SCHOOL

Major Needs: Mechanical system replacements

Roof replacement

Site work

Interior renovations

Windows

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 23/28

HUNTINGTON K-8 SCHOOL

Major Needs: Window replacements

Site improvements

Mechanical upgrades

Interior and exterior upgrades

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 24/28

NOTTINGHAM HIGH SCHOOL

Major Needs: Asbestos abatement in crawl spaces

New mechanical, electrical and

plumbing systems

New roofing

Pool

Interior renovations

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 25/28

SHEA BUILDING

Major Needs: Window replacements

New mechanical, electrical and

plumbing systems

Interior renovations

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 26/28

WESTSIDE ACADEMY AT BLODGETT

Major Needs: Exterior masonry restoration

Window replacements

Exterior doors

Roofing

Auditorium

Interior renovations including new

mechanical, electrical and plumbing

systems.

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 27/28

JSCB Phase 2 Comprehensive Plan defines:

• Projects to be constructed in eligible schools

• Scope of renovations and funds allocated to each school

• Financing of projects

• Project schedules

• Development & Diversification Plan for Workforce & Business

We are here today to listen to your input on the plan to upgrade

these 15 schools.

8/20/2019 Syracuse Schools Construction Plans

http://slidepdf.com/reader/full/syracuse-schools-construction-plans 28/28

Comments can be emailed to:

 [email protected] 

by August 25, 2014 at 4:30pm