Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis,...

Date post: 22-Dec-2015
Category:
Upload: magdalene-spencer
View: 246 times
Download: 5 times
Share this document with a friend
Popular Tags:
37
Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-1 © Copyright 2011 John Wiley & Sons, Inc.
Transcript
Page 1: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Systems Analysis and Design5th Edition

Chapter 13. Transition to the New System

Alan Dennis, Barbara Haley Wixom, and Roberta Roth

13-1

Page 2: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Chapter 13 Outline

Making the transition to the new system.

The migration plan.Postimplementation Activities.

13-2

Page 3: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

INTRODUCTION

Managing the change to a new system is one of the most difficult tasks in any organization.

There are business issues, technical issues, and people issues that must be addressed for the transition from the as-is system to the to-be system.

Important support and follow-up activities should be performed following the installation of the new system.

13-3

Page 4: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Making the Transition to the New System

The existing systems or work processes often limit people’s activities and make it difficult for them to change.

Change is a three-step process:– Unfreeze the existing habits and norms;–Move, or transition, from the old system to the

new;– Refreeze the new system as the habitual way of

performing the work processes.13-4

Page 5: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

13-5

Implementing change

Page 6: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

The Migration Plan

The decisions, plans, and procedures that will guide the transition are outlined in the migration plan.

It specifies what activities will be performed when and by whom as the transition is made.

The migration plan includes business contingency plans to ensure that the business can continue its operations even in the event of technical glitches in the new system.

13-6

Page 7: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

Elements of a migration plan

13-7

Page 8: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Selecting the Conversion Strategy

The process by which the new system is introduced into the organization is called the conversion strategy.

Three different aspects of introducing the system: - conversion style – how abruptly the change is

made; - conversion locations – the organizational span of

the introduction; - conversion modules – the extent of the system

that is introduced.13-8

Page 9: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

Conversion strategies

13-9

Page 10: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Conversion Style

Direct conversion– The new system instantly replaces the old

one.Parallel conversion– Both the old and new systems are used

simultaneously for a period of time. The old system is discontinued when the new system is proven fully capable.

13-10

Page 11: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Conversion Location

Pilot conversion

– It selects one or more locations to be converted first as a part of a pilot test. If the pilot test is successful, then the system is installed at the remaining locations.

Phased conversion

– A first set of locations is converted, then a second set, then a third set, and so on, until all locations are converted.

Simultaneous conversion

– All locations are converted at the same time. 13-11

Page 12: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Conversion Modules

Modular conversion–The old system is converted to the new

system one module at a time.Whole-system conversion–The entire new system is installed at

one time.

13-12

Page 13: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Evaluating the Strategy Choices

13-13

Page 14: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

There are three important factors to consider in selecting a conversion strategy

- Risk: The introduction of the new system exposes the organization to risk associated with problems and errors that may impede business operations.

- Cost: The various conversion strategies have different costs.

- Time: Time is needed to convert between the old and new system.

13-14

Page 15: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Preparing a Business Contingency Plan

Keeping small technology glitches in the new system from turning into major business disasters is known as business contingency plan.

Choosing parallel conversion is one approach to contingency planning.

It is important to involve key business managers and users in the plan development.

13-15

Page 16: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Preparing the Technology

There are three major steps involved in preparing the technical aspects of the new system:

- install the hardware, - install the software, and - convert the data.Data conversion is usually the most technically

complicated step in the migration plan.13-16

Page 17: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Preparing People for the New System

The process of helping people adjust to the new system and its new work processes without undue stress is called change management.

There are three key roles in any major organizational changes:

- The sponsor is the person who wants the change. - The change agent is the person(s) leading the change

effort. - The potential adopters are the people who actually

must change. 13-17

Page 18: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

The change management plan has four basic steps:

1. Revising management policies,2. Assessing the costs and benefits models

of potential adopters,3. Motivating adoption, and4. Enabling people to adopt through

training.13-18

Page 19: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Understanding Resistance to Change

People resist change – even change for the better – for very rational reasons.

Every change has a set of costs and benefits associated with it. If the benefits of accepting the change outweigh the costs of the change, then people change.

What is good for the organization is not necessarily good for the people who work there.

13-19

Page 20: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d) Costs and Benefits of Change

13-20

The costs and benefits of change

Page 21: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Revising Management Policies

Management policies provide goals, define how work processes should be performed, and determine how organizational members are rewarded.

No computer system will be successfully adopted unless management policies support its adoption.

Three basic tools for structuring work processes:

– Standard operating procedures (SOPs);

– Measurements and rewards;

– Resource allocation.13-21

Page 22: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Assessing Costs and Benefits

This step in developing a change management plan is to develop two clear and concise lists of costs and benefits provided by the new system, compared with the as-is system.

The first list is developed from the perspective of the organization.

The second list is developed from the viewpoints of the different potential adopters, or stakeholders in the change.

13-22

Page 23: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

13-23

Major factors in successful change

Page 24: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Motivating Adoption

The simple and most important factor in motivating a change is providing clear and convincing evidence of the need for change.

There are two basic strategies to motivating adoption: - An informational strategy is to convince potential

adopters that change is for the better. - A political strategy is to use organizational power to

motivate change. Potential adopters include ready adopters, reluctant

adopters, and resistant adopters.13-24

Page 25: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Enabling Adoption: Training

Potential adopters may want to adopt the change, but unless they are capable of adopting it, they won’t.

Every new system requires new skills.There are three ways to get these new

skills: hiring new employees, outsourcing, and training existing staff.

13-25

Page 26: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

What to Train

Training should focus on helping the users accomplish their jobs, not how to use the system.

- The training must focus on those activities around the system as well as the system itself.

- The training should focus on what the user needs to do, not on what the system can do.

One source of guidance for designing training materials is the use cases and use scenarios.

13-26

Page 27: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

How to Train

There are many ways to deliver training:

- classroom training, - one-on-one training, - computer-based training.

13-27

Page 28: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

POSTIMPLEMENTATION ACTIVITIES

The goal of postimplementation activities is to institutionalize the use of the new system.

Three key postimplementation activities: - support, - maintenance, and - project assessment.

13-28

Page 29: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

System Support

Once the new system has been installed, the system is officially turned over to the operations group.

Providing system support means helping the users to use the system. This type of support can be thought of as on-demand training.

Online support is the most common form of on-demand training.

A help desk provides a place for a user to talk with a person who can answer questions.

13-29

Page 30: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

The goal of most help desks is to have the level 1 support staff resolve 80% of the help requests. If the issue cannot be resolved by level 1 support staff, a problem report is completed and passed to a level 2 support staff member.

13-30

Page 31: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

System Maintenance

System maintenance is the process of refining the system to make sure it continues to meet business needs.

Change requests typically come from five sources: - The most common source is problem reports from

the operations group. - Second: Enhancements to the system from users. - Third: Other system develop project. - Fourth: Underlying software or networks change. - Fifth: Requests from senior management.

13-31

Page 32: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

(cont’d)

13-32

Processing a change request

Page 33: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Project Assessment

The goal of project assessment is to understand what was successful about the system and the project activities, and what needs to be improved.

Project assessment is important component in organizational learning.

It is particularly important for junior staff members.

13-33

Page 34: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Project Team Review

Project team review focuses on the way the project team carried out its activities.

Each member prepares a short document that reports on and analyzes his/her performance.

The focus is on improvement, not penalties.A summary document is prepared by the project

manager and is circulated to help the organization learn more from the project.

13-34

Page 35: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

System Review

The focus of the system review is understanding the extent to which the proposed costs and benefits were actually recognized from the implemented system.

System review helps the organization improve in future projects.

13-35

Page 36: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

SUMMARY

Making the transition to new system - is the technical process of replacing the old system with the new

one. Designers select the method, timing, and location of the conversion process.

The migration plan - is aimed at helping system users to adopt the new system and

use it productively. Postimplementation activities - provide on-going support to users, include training people to use

the system and provide participants in the development process the opportunity to learn and grow from their experiences.

13-36

Page 37: Systems Analysis and Design 5th Edition Chapter 13. Transition to the New System Alan Dennis, Barbara Haley Wixom, and Roberta Roth 13-0© Copyright 2011.

© Copyright 2011 John Wiley & Sons, Inc.

Copyright 2011 John Wiley & Sons, Inc.

All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for redistribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.