+ All Categories
Home > Documents > TAC MPRWA Special Meeting Agenda Packet 11-16-15

TAC MPRWA Special Meeting Agenda Packet 11-16-15

Date post: 07-Aug-2018
Category:
Upload: l-a-paterson
View: 215 times
Download: 0 times
Share this document with a friend

of 12

Transcript
  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    1/12

     

    AgendaMonterey Peninsula Regional Water Authority (MPRWA)

    Technical Advisory Committee (TAC)SPECIAL MEETING

    10:30 AM, Monday, November 16, 2015COUNCIL CHAMBER980 PACIFIC STREETMonterey, California

    CALL TO ORDER

    ROLL CALL

    PLEDGE OF ALLEGIANCE

    REPORTS FROM TAC MEMBERS

    PUBLIC COMMENTSPUBLIC COMMENTS allows you, the public, to speak for a maximum of three minutes on anysubject which is within the jurisdiction of the MPRWA TAC and which is not on the agenda. Anyperson or group desiring to bring an item to the attention of the Committee may do so byaddressing the Committee during Public Comments or by addressing a letter of explanation to:MPRWA TAC, Attn: Monterey City Clerk, 580 Pacific St, Monterey, CA 93940. The appropriatestaff person will contact the sender concerning the details.

    APPROVAL OF MINUTES

    1. October 5, 2015, Regular Meeting

     AGENDA ITEMS

    2. Receive, Discuss, and Make Recommendations as Necessary on a CPM Schedule for Permits and Approvals for the Monterey Peninsula Water Supply Project (MPWSP)-Crooks

     3. Receive Report, Discuss, Current Status of the Definitive Agreement and Financing for the 

    Groundwater Replenishment/Pure Water Monterey (GWR/PWM) Project - Stoldt/Sciuto 

    ADJOURNMENT

    The Monterey Peninsula Regional Water Authority is committed to including the disabled in allof its services, programs and activities. In compliance with the Americans with Disabilities Act,if you need special assistance to participate in this meeting, please contact the Monterey CityClerk’s Office at (831) 646-3935. Notification 30 hours prior to the meeting will enable the Cityto make reasonable arrangements to ensure accessibility to this meeting [28 CFR 35.102-35.104 ADA Title II]. Later requests will be accommodated to the extent feasible. Forcommunication-related assistance, dial 711 to use the California Relay Service (CRS) to speak to

    http://../agdocs.aspx?doctype=agenda&itemid=82858http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82911http://../agdocs.aspx?doctype=agenda&itemid=82911http://../agdocs.aspx?doctype=agenda&itemid=82911http://../agdocs.aspx?doctype=agenda&itemid=82911http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82910http://../agdocs.aspx?doctype=agenda&itemid=82858

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    2/12

    Created date 11/13/2015 11:28 AM Monday, November 16, 2015

    2

    City offices. CRS offers free text-to-speech, speech-to-speech, and Spanish-language services 24hours a day, 7 days a week. If you require a hearing amplification device to attend a meeting, dial711 to use CRS to talk to the Monterey City Clerk's Office at (831) 646-3935 to coordinate use of adevice.

    Agenda related writings or documents provided to the MPRWA are available for publicinspection during the meeting or may be requested from the Monterey City Clerk’s Office at 580Pacific St, Room 6, Monterey, CA 93940. This agenda is posted in compliance with CaliforniaGovernment Code Section 54954.2(a) or Section 54956.

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    3/12

     

    M I N U T E SMONTEREY PENINSULA WATER AUTHORITY (MPRWA)

    TECHNICAL ADVISORY COMMITTEE (TAC)Regular Meeting

    10:30 AM, Monday, October 5, 2015COUNCIL CHAMBER

    580 PACIFIC STREETMONTEREY, CALIFORNIA

    Members Present: Narigi, Van Der Maaten, Sciuto, Riedl, CullemMembers Absent: Riley, Huss, Stoldt 

    Staff Present: Legal Counsel

    CALL TO ORDER

    ROLL CALL

    The meeting was called to order at 10:30 AM.

    PLEDGE OF ALLEGIANCE

    REPORTS FROM TAC MEMBERS

    Executive Director Cullem indicated the community is at a critical point regarding the requestedextension for the Cease and Desist Order (CDO). There is an ongoing discussion to find asolution regarding what is an acceptable extension. The extension request should be before theAuthority at the next meeting for support and possibly co-apply.

    PUBLIC COMMENTS

    Executive Director Cullem invited comments from the public.

    Bill Caruthers spoke to the formation of the Sustainable Groundwater Group announcing theirmoderator, Gina Burnett from the Consensus Building Institute. The first meeting of this groupwill be in January and he encouraged consideration of the TAC members to participate. Hespoke to the intent of the group.

    APPROVAL OF MINUTES

    1. August 3, 2015 Regular Meeting

    The TAC requested a notation included that Member Riley requested a report regarding theSand City Desalination facility well production.

    Action: Approved as amended. M/S/C Narigi/Sciuto (5-0-3)

    AGENDA ITEMS

    2. Receive Report, Discuss, and Provide Staff Direction on the Impact of the Delay in Completingthe Definitive Agreement on the Approval Schedule and Financing for the GroundwaterReplenishment/Pure Water Monterey (GWR/PWM) Project - Stoldt/Sciuto

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    4/12

    MPRWA TAC Minutes Monday, October 5, 2015

    2

    Member Sciuto reported on the item. The two elements discussed included the schedule of thedefinitive agreements and the financing of the project. The PCA is pursuing an SRF Loan whichis a 1% loan for 30 year, yet there is a restricted amount of funds available. The State hassuggested applying as soon as possible as there are a number of competitive projects for thisloan cycle. If this rate is not accepted, then the project would receive a 1.6% loan rate. Thepreliminary estimate of the cost of the GWR project is $100 million. Mr. Sciuto discussed the

    costs of the project as compared to that of the projected desal facility projects costs.

    Mr. Sciuto then discussed the externality study being conducted by HDR. A final meeting isbeing set up and the Consultant’s final report should be completed by the end of 2015. The costcomparison study is on the same schedule. Mr. Sciuto then spoke to the status of theoutstanding definitive agreements. Member Narigi requested clarification that the agreementsdo not require peninsula residents to be subsidizing the water that will be sold to other regionsor customers. Mr. Sciuto indicated that if a future discussion is to take place on costs, it wouldbe prudent to include a discussion of where all of the costs are allocated. The TAC questionedthe different agreements, the issues of each, the timing of approval and the impacts of thenegotiating factors of each of the interest groups.

    Mr. Sciuto also reported that the certification of the Final EIR is agendized. Member Narigiquestioned the ability to certify the EIR with outstanding questions with regard to costs andsource water agreements to which Mr. Sciuto responded that EIR only pertains to environmentalimpacts not feasibility. Member Narigi thanked Member Sciuto for his candid comments andcompetency.

    Member Riley arrived at 11:37 AM. Executive Director Cullem invited comments from the publicand had no requests to speak.

    Mr. Sciuto finished the time by going over the schedule including permits, design andconstruction with an estimated project completion of November 2016.

    3. Receive Report, Discuss, and Make Recommendations to the Water Authority Board on theCal Am Request for Proposal and Contract for the MPWSP DESAL Conveyance Facilities -Cullem

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    5/12

    MPRWA TAC Minutes Monday, October 5, 2015

    3

    Executive Director Cullem introduced the item specifying that this item is being facilitated by theGovernance Committee. However the City of Monterey has submitted a letter requesting analternate route option for the Monterey portion of pipeline consideration be incorporated into theDEIR. Mr. Cullem indicated the intent of the item is to determine if the TAC would support theCity of Monterey request for inclusion of the longer, more potentially more expensive route andrequest Cal Am to incorporate into the pipeline contract that it consider “alternate routes”.

    Mr. Narig indicated he does not support it because of the late hour and the extra costs it willincur onto the project. Cal Am correctly worked with all cites in advance, and has determined anefficient, cost effective path and it shouldn’t be changed. He did not oppose incorporatingconsideration language but expressed concern if it would increase project costs.

    Executive Director Cullem invited comments from the public and had no requests to speak.

    On motion by Member Narigi by member Riley and passed by the following vote the TACrequested that Cal Am use consideration when reviewing the responses to the RFP and whenexecuting the consultant contract to consider alternative pipeline routes while managing thepotential increase of costs. (M/S/C Narigi/Riley 5-0-3 Approved)

    4. Receive Report, Discuss, and Make Recommendations to the Water Authority Board on theCal Am Draft Request for Proposal for the MPWSP Source Water Slant Wells - Cullem

    Item 4 was discussed first. Mr. Cullem reported that as it stands, there are two RFP’s theGovernance Committee has been processing. The first is the pipeline and conveyance system,and the second is water supply for source water slant wells. The TAC discussed the draft RFPfor the Source Water Slant wells, the schedule for the contract, and possible consideration toincorporate sustainability opportunities, the need for a third party peer review, quality controland the slant well schedule.

    Mr. Cullem invited comments from the Public and had no requests to speak.

    Mr. Crooks indicated that the value engineering panel included discussion of the Envisioncertification and it can be considered for the conveyance facilities. Regarding the source wellsand pipeline projects, he was not clear of the value of incorporating sustainable opportunities.He indicated there is no external value engineering planned for the pipeline project.

    On motion by Member Riedl and seconded by Member Narigi and passed by the following votethe TAC requested Cal AM consider incorporating an Envision evaluation, not actualcertification, during the VE phase of the project for the conveyance system.

    Mr. Cullem invited comments from the public again.

    Bill Caruthers spoke to the level of unanticipated work needed on the Sand City Desal projectand requested Cal Am to discuss their experience and if they feel confident about the newproject.

    Member Scuito indicated that during a previous Authority meeting, Cal Am responded to thissame question which could be reviewed via video. The TAC discussed the purpose and needfor Cal Am choosing the slant wells versus the vertical wells.

    ADJOURNMENT

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    6/12

    MPRWA TAC Minutes Monday, October 5, 2015

    4

    Having no further business to discuss, the meeting was adjourned at 12:02 PM.

    Respectfully Submitted, Approved,

    Lesley Milton-Rerig, Committee Clerk Jim Cullem, Executive Director/Chair

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    7/12

    Monterey Peninsula Regional Water AuthorityAgenda Report

    Date: November 16, 2015

    Item No: 2.

    №06/12

    FROM: Executive Director Cullem

    SUBJECT:Receive, Discuss, and Make Recommendations as Necessaryon a CPM Schedule for Permits and Approvals for the MontereyPeninsula Water Supply Project (MPWSP)

    RECOMMENDATION: 

    It is recommended that the TAC receive and discuss Cal Am's schedule for

    the required permits and approvals for the MPWSP, identify the permitsand approvals critical path to project completion, and make appropriaterecommendations to the Water Authority Board if needed.

    DISCUSSION:

    The Coastal Commission's recent reissuance of the CDP for the test slantwell was critical to the MPWSP schedule and test well restart is now inprogress. However, an estimated additional fifty (50) or more permit andapprovals remain to be obtained before the desal plant can be completed

    and placed in operation in 2020.

    Accordingly, the TAC has been tasked by the Water Authority Board toclosely examine Cal Am's latest "detailed" permits and approvals schedule,including identification of the "permit critical path" in an effort to identifypotential future delays or approval challenges that might require WaterAuthority attention.

    ATTACHMENTS:

    A-Current Cal Am critical path schedule for Permits and Approvals

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    8/12

     

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    9/12

    Monterey Peninsula Regional Water AuthorityAgenda Report

    Date: November 16, 2015

    Item No: 3.

    №06/12

    FROM: Executive Director Cullem

    SUBJECT: Receive Report, Discuss, Current Status of the DefinitiveAgreement and Financing for the Groundwater Replenishment/Pure Water Monterey (GWR/PWM) Project 

    RECOMMENDATION:

    It is recommended that the TAC receive an update on the current status onthe bi-lateral agreements necessary to secure a Definitive Agreement forsource and product water for the Ground Water Replenishment(GWR)/Pure Water Monterey (PWM) project.

    DISCUSSION:

    At its meeting of December 1, 2014, the TAC received and discussed the"Roadmap for a Definitive Agreement on Source Waters and WaterRecycling". Progress was last discussed at the TAC meeting of October 5,

    2015. More agreement details are at attachment A.

    ATTACHMENTS: 

    A- MCWRA Briefing Report dated July 31, 2015 (2 sheets)

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    10/12

     

    M

    CW

    RA

     B ri

    efin

    g R

    epor

    t

    S

    OUR

    CE

     WA

    TER

     PU

    RE

     WA

    TER

     MO

    NT

    ERE

    Y

    J

    uly 

    31, 2

    015 

    Subj

    ect

    o

    urce

     Wa

    ter/P

    ure

     Wat

    er M

    onte

    rey

    Cu

    rren

    t Sta

    tus 

    Th

    e pro

    pose

    d W

    ater

    Recy

    clin

    g Ag

    reem

    ent,

     and

     com

    pani

    on a

    greem

    ent

    s, pr

    ovid

    e,

    i

    nt r

     

    alia 

    fo

    r ne

    w so

    urce

     wat

    er to

     sup

    port

    4,40

    0 ac

    re-fe

    et/ye

    ar o

    f wa

    ter to

     CS

    IP an

    d 4,

    300

    acr

    e-fee

    t/yea

    r for

     the 

    Pure

     Wat

    er M

    onte

    rey P

    rojec

    t.

    Th

    e Re

    gion

    al W

    ater

     Qua

    lity C

    ont

    rol B

    oard

     has

    been

     con

    sulte

    d an

    d is a

     pro

    pone

    nt of

     the

    S

    ourc

    e W

    ater/P

    ure

    Wate

    r Mo

    nter

    ey Pr

    ojec

    t.

    The

     Pro

    pose

    d Wa

    ter R

    ecyc

    ling

     Agre

    eme

    nt is

     subs

    tanti

    ally 

    comp

    lete.

     

    o

     

    M

    eld

    s or

    igina

    l ag

    reem

    ent/

    three

      3)

     ame

    ndm

    ents

    /SR

    DF a

    nd O

    cto

    ber 8

    , 20

    15

    M

    OU

     

    o

    Co

    vers

    New

     Sou

    rce W

    ate

    rs (B

    lanco

    , Re

    c Di

    tch, S

    alin

    as W

    astew

    ater

    )

    o

    4,32

    0 acr

    e-fee

    t/ye

    ar fo

    r PW

    M 4

    9.6

    4,3

    81 a

    cre-f

    eet/y

    ear f

    or C

    SIP 5

    0.4 

    o

    New

     Sou

    rce F

    acil

    ities 

    capit

    al (4

    4 W

    RA

    , 56 

    PC

    A) 

    o  G

    row

    ers h

    ave m

    inim

    um

     of a

    ll wa

    ste w

    ater

     goi

    ng to

     plan

    t, (e

    xcep

    t MC

    WD

     flow

    s

    o

    f 650

     acr

    e-fee

    t tha

    t go t

    o PC

    A) 

    PC

    A ha

    s fir

    st 4,3

    20 a

    cre-f

    eet/y

    ear o

    f Ne

    w S

    ource

     Wa

    ters 

    o R

    equ

    ires a

     revi

    sed a

    ccou

    ntin

    g pro

    toco

    l at P

    CA 

    o

      30

     yea

    r term

     wit

    h au

    toma

    tic e

    xtens

    ions

     

    o P

    ro vi

    sions

     for P

    hase

     II —

     4  6

    65 a

    cre-fe

    et /y

    ear fo

    r CS

    IP

    H

    istor

    Five 

    (5) P

    arty 

    MOU

     de

    velop

    ed b

    y Sta

    keho

    lder

     Com

    mitt

    ee on

     Oc

    tober

     8,2

    014.

    It w

    as d

    ecide

    d to 

    sepa

    rate t

    he D

    efini

    tive 

    Agre

    eme

    nt in

    to fiv

    e sep

    arat

    e agr

    eem

    ents.

    The proposed Wate

    r R

    ecyc

    ling

     Agr

    eem

    ent

    is no

    w c

    omp

    lem

    ente

    d by

     fou

    r ot

    her

    a

    greem

    ent

    s. Be

    low

    is the

     stat

    us of

     all a

    gree

    men

    ts. 

    Ag

    reem

    ent

    P

    artie

    s

    S

    ta tu

    s

    Wat

    er R

    ecyc

    ling

    Agre

    emen

    t

    MC

    WRA

    , M

    RWP

    CA

    I

    n Pr

    ogres

    s - I

    ntern

    al D

    raft R

    evie

    w

    W

    ater P

    urch

    ase 

    Agre

    emen

    t

    Cal

    Am,

     MPW

    MD

    , M

    RWP

    CA

      I

    n Pr

    ogres

    s - R

    evie

    wing

     5t

    draf

    t

    W

    ate

    r Rig

    hts

    — A

    gricu

    ltura

    l

    Was

    h W

    ater 

    C

    ity o

    f Sa

    linas

    , MR

    WP

    CA 

    In P

    rogre

    ss - 

    Inter

    nal D

    raft

    Revi

    ew

    Ope

    ratio

    n

    n

    dustr

    ial

    W

    aste

    wate

    r Pon

    ds

    Ci

    ty of

     Salin

    as, M

    RW

    PCA

     

    I

    n Pro

    gres

    s - In

    itial

    discu

    ssio

    ns an

    d

    deve

    lopi

    ng de

    al po

    ints

     

    Marina Coast Water District

     R U

    W AP

     Pip

    eline

     

    M

    CWD

    , M

    RWP

    CA

    In Progress — Negotiation Parties 

    are m

    eeti

    ng

    Um

    brell

    a Ag

    reem

    ent

    MC

    WR

    A, M

    RW

    PCA

    , C

    ity o

    f

    S

    alin

    as, M

    CW

    D, M

    PWM

    Dra

    ft in

     Prog

    ress

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    11/12

    M

    C

    W

    RA

     B

    rie

    fin

    g R

    ep

    ort

     

    SO

    U

    RC

    E W

    A

    TE

    R P

    UR

    E

    WA

    TE

    R

    MO

    N

    TER

    EY

     

    Ju

    ly 3

    1, 2

    015

     

    Ne

    xt S

    tep

    s:

     

    Ag

    enc

    y B

    oa

    rd o

    f D

    ire

    ctor

    s  a

    nd

    PC

    A B

    oa

    rd o

    f D

    irec

    tor

    s  a

    ppr

    ova

    l o

    n Se

    pte

    mb

    er

    28,

    2 15

     

    P

    CA

     Bo

    ard

     of 

    Dire

    cto

    r's C

    er

    tific

    atio

    n o

    f th

    e E

    IR o

    n S

    ept

    emb

    er 

    28, 

    201

    5

    • Ag

    enc

    y B

    oar

    d o

    f Su

    per

    viso

    r's

     app

    rov

    al o

    n O

    cto

    ber

     6,

    201

    5

    C

    om

    ple t

    io n

     wil

    l re

    qui

    re  

    Sa

    tisf

    acti

    on o

    f c

    ond

    itio

    ns p

    rec

    ede

    nt f

    or N

    ew

     So

    urc

    e W

    ate

    r Fa

    cili

    ties

     

    Sup

    ply

     

    Wa

    ter 

    Rig

    hts 

    to B

    lan

    co 

    Dra

    in

    R

    ec. 

    Ditc

    h f

    rom

     SW

    QC

     

    T

    hird

     pa

    rty r

    evi

    ew 

    of c

    api

    tal

    o

    pera

    tin

    g co

    sts

     app

    rov

    ed 

    by B

    OD

     an

    d B

    OS

     

    Su

    cce

    ssf

    ul 2

    18 v

    ote

     

  • 8/20/2019 TAC MPRWA Special Meeting Agenda Packet 11-16-15

    12/12

     


Recommended