    Thatta Cement Company Limited

    Main Burner Unitherm M.A.S.Alignment27 – June - 20!

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    2/13

    Thatta Cement Company Limited

    ≈200 mm.

    ≈  2 0 0  m m .

    Main Burner Unitherm M.A.S.

    inserted ≈ 200 mm.

    To avoid flame distortion from secondary air 

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    3/13

    Thatta Cement Company Limited

    Main burner end tip with a hole a

    the middle of oil channel

    aser device placed at the bac!

    of the main burner "centred#

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    4/13

    Thatta Cement Company Limited

    aser ray passin$ the hole "oil

    channel#

    %iln A&is

    'st

     (eference at '2 meter 

    aser beam out of the centre at

    initial ali$nment

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    5/13

    Thatta Cement Company Limited

    T)) *ersonnel started movin$

    burner for ali$nment

    aser beam startin$ ali$nment to

    !iln a&is *hoto '

    'st (eference at '2 meter 

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    6/13

    Thatta Cement Company Limited

    %iln A&is

    Burner ali$nment in process

    *hoto 2

    'st (eference at '2 meter 

    %iln A&is

    Burner ali$nment in process

    *hoto +

    'st (eference at '2 meter 

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    7/13

    Thatta Cement Company Limited

    %iln A&is

    Burner ali$nment in process

    *hoto ,

    'st (eference at '2 meter 

    %iln A&is

    Burner ali$nment in process

    *hoto -

    'st (eference at '2 meter 

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    8/13

    Thatta Cement Company Limited

    %iln A&is

    Burner ali$ned down - mm. ".-

    cm# from %iln A&is at '2 meters

    %iln A&is

    Burner ali$nment final step

    "ma&imum reached in the trolley#

    *hoto

    'st (eference at '2 meter 

    - mm.

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    9/13

    Thatta Cement Company Limited

    The first reference was removed to identify the leaser beam at the

    middle of the !iln len$th "+0 meter#

    %iln A&is

    aser beam final set

    2nd reference at +0 meters'0 mm.

    '00 mm. )oal mill side

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    10/13

    Thatta Cement Company Limited

    aser beam is now

    /touchin$ the !iln shelf 

    After the 2nd reference was measured1 we loo! at the end of the !iln to

    /see the laser ray where was placed

    Measurments at !iln feed shelf was made by T)) *rocess 3n$ineers

    '040 mm.

       '   4   +   0  m  m .

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    11/13

    Thatta Cement Company Limited

    T)) *rocess 3n$ineer performed a measurement in the 0.0

    meter of !iln "!iln dischar$e to )ross Bar )ooler#

    '5'0 mm.

       '   5   '   0  m  m .

       '   4   5   0  m  m .

    '450 mm.)oal mill side.))( Side

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    12/13

    Thatta Cement Company Limited

    T)) 6 7S *erformed measurements at 0.0 m. "point 0#1 '2.0 m. "point '# 6 +0.0 m. "point 2#

    0 ' 2

  • 8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment

    13/13

    Thatta Cement Company Limited

    T"A#$ %&U