Team 8: Grand River Rapids
Team 8
Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall
Project Overview Design Norms Major Design Decisions HEC-RAS Modeling Entry and Exit Points Future Work Questions
Outline
Return the Grand River to a more natural state◦ Replace beautification dams with rocks
Eliminate dangerous undertow at 4th street dam
Design entry and exit locations for kayakers
Project Overview
Caring◦ Eliminate dangers associated with dams
Justice◦ Respect rights of fishermen and property owners
Stewardship◦ Naturalize river◦ Improve fish habitat
Design Norms
Flow Rate◦ River used between April and November◦ Low flow = 1,700 cfs◦ High flow = 50,000 cfs (100 year storm)◦ Design flow of 3,200 cfs
Major Design Decisions
Modeling Accuracy◦ Rocks & boulders as series of weirs
Major Design Decisions
Project Location
4th Street Dam Safety Hazard
Design Solution – Stairstep
Entry and Exit Points
Canal Street Park
Fulton Street
Fish Ladder Park
Ford Museum
Continued modeling of rocks
Maintaining water levels
Refine physical model
Future Work
Questions