Exhibit 4.1 Technical Activities Committee Documents, ANSI Approval Dates, & Published Dates Page Count C. Code Eng. Draft # Document Title PINS Sent Permission to Prepare SC Ballot # Closing Date C Ballot # Closing Date Last C Ballot Closing Date TAC Ballot # Closing Date Last TAC Ballot Closing Date Public Review Expiration Date STANC Ballot # Closing Date BSR 9 Sent A5.8/A5.8M 9/1/92 Extension granted until 8/31/02 REAFFIRMED 1/16/03 25 A5H CLJ WD-6 Specification for Filler Metals for Brazing and Braze Welding 3/5/99 . 4/21/1999 Reaffirm Prev. Pub. WD-304 1/27/00 WD-347 6/15/00 WD-391 12/11/00 WD-409 1/29/01 WD-518 7/18/02 WD-541 1/8/2002 WD-568 4/21/03 CD-414 7/16/01 CD-462 7/18/02 CD-493 1/1/03 CD-593 7/17/03 7/17/03 DS-342 11/10/02 Reaffirm E9-DS1-BT 10/10/03 Reaffirm 10/10/03 Reaffirm 11/25/03 n/a 1/14/2003 Reaffirm A5.11/A5.11M 11/6/97 Extension granted until 11/5/05. 44 A5E RKG Specification for Nickel and Nickel-Alloy Welding Electrodes for Shielded Metal Arc Welding 1/26/01 WD-558 4/4/03 A5.14/A5.14M 12/8/97 Extension granted until 12/7/05. 32 A5E RKG Specification for Nickel and Nickel-Alloy Bare Welding Electrodes and Rods 1/26/01 CLASS INQ-153 4/7/02 WD-559 4/4/03 CLASS INQ-154 4/7/02 Document Status Report 10/3/03 FY-2004 Publish Goals for New and Revised Standards FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 1
Transcript
Page 1: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

A5.8/A5.8M 9/1/92 Extension granted until 8/31/02 REAFFIRMED 1/16/03

25 A5H CLJ WD-6 Specification for Filler Metals for Brazing and Braze Welding

3/5/99 . 4/21/1999 Reaffirm

Prev. Pub. WD-304 1/27/00 WD-347 6/15/00 WD-391 12/11/00 WD-409 1/29/01 WD-518 7/18/02 WD-541 1/8/2002 WD-568 4/21/03

CD-414 7/16/01 CD-462 7/18/02 CD-493 1/1/03 CD-593 7/17/03

7/17/03 DS-342 11/10/02 Reaffirm E9-DS1-BT 10/10/03

Reaffirm 10/10/03

Reaffirm 11/25/03

n/a 1/14/2003 Reaffirm

A5.11/A5.11M 11/6/97 Extension granted until 11/5/05.

44 A5E RKG Specification for Nickel and Nickel-Alloy Welding Electrodes for Shielded Metal Arc Welding

1/26/01 WD-558 4/4/03

A5.14/A5.14M 12/8/97 Extension granted until 12/7/05.

32 A5E RKG Specification for Nickel and Nickel-Alloy Bare Welding Electrodes and Rods

1/26/01 CLASS INQ-153 4/7/02 WD-559 4/4/03

CLASS INQ-154 4/7/02

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 1

Page 2: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

A5.16/ A5.16M REAFFIRMED 4/17/97 Extension granted until 4/17/04

20 A5K RKG Specification for Titanium and Titanium-Alloy Welding Electrodes and Rods

1/26/01 WD-419 2/5/01 WD-457 9/4/01 WD-499 4/6/02 WD-508 6/10/02

CD-481 10/21/02 CD-501 3/5/03

3/5/03 DS-362 8/15/03

8/15/03 10/7/03

A5.24/A5.24M REAFFIRMED 8/11/97 Extension granted until 8/11/04

18 A5K RKG Specification for Zirconium and Zirconium-Alloy Welding Electrodes and Rods

7/9/03 CD-425 9/17/01

9/17/01

A5.28/A5.28M 3/29/96 Extension granted until 4/19/03. Extension granted until 3/28/05.

33 A5O RKG    

WD-1 Specification for Low-Alloy Steel Electrodes and Rods for Gas Shielded Arc Welding

7/8/03 WD-292 12/2/99 WD-463 10/29/01

CD-427 10/29/01

10/29/01

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 2

Page 3: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

B2.1 11/14/00 PUBLISHED 6/11/01

258 B2B LPC DS-2 Specification for Welding Procedure and Performance Qualification

7/11/03 WD-538 12/9/02 B2.1 Mat

CD-485 12/9/02 B2.1 Mat CD-502 3/10/03 CD-558 3/24/03

3/24/03

B2.1-1-232 NEW

LPC Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding root followed by Flux Cored Arc Welding of Carbon Steel (M-1/P-1/S-1 Groups 1 and 2 1/8 through 1-1/2 inch thick, ER70S-3 and E7XT-1, As-Welded or PWHT Condition, Primarily Pipe Applications

WD-594 8/18/03

CD-608 8/18/03

8/18/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 3

Page 4: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

B2.1-1-233 NEW

LPC Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) followed by Gas Metal Arc Welding (Spray Transfer Mode) of Carbon Steel (M-1/P-1/S-1 Groups 1 and 2 1/8 through 1-1/2 inch thick, ER70S-3 and E7XT-1, As-Welded or PWHT Condition, Primarily Pipe Applications

WD-595 8/18/03

CD-609 8/18/03

8/18/03

B2.1-1-234 NEW

LPC Standard Welding Procedure Specification (WPS) for Flux Cored Arc Welding of Carbon Steel (M-1/P-1/S-1 Groups 1 and 2 1/8 through 1-1/2 inch thick, E7XT-1, As-Welded or PWHT Condition, Primarily Pipe Applications

WD-596 8/18/03

CD-610 8/18/03

8/18/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 4

Page 5: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

B2.1-1-235 NEW

LPC Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding (Spray Transfer Mode) of Carbon Steel (M-1/P-1/S-1 Groups 1 and 2 1/8 through 1-1/2 inch thick, ER70S-3, As-Welded or PWHT Condition, Primarily Pipe Applications

WD-597 8/18/03

CD-611 8/18/03

8/18/03

B4.2 NEW

Destructive tests on welds in metallic materials - Bend tests (Adoption of ISO 5173:2000)

CD-574 6/4/03

B4.3 NEW

Destructive tests on welds in metallic materials - Bend tests (Adoption of ISO 5173:2000)

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 5

Page 6: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

B5.4 NEW

B5J SPH DS-5 Specification for Qualification of Welder Test Facilities

2/12/98 11/6/97 WD-164 12/12/98 WD-287 11/22/99 WD-339 6/7/00 WD-452 7/23/01 WD-501 5/13/02

CD-211 4/19/99 CD-275 11/22/99 CD-318 6/7/00 CD-420 7/23/01 CD-448 5/13/02

5/13/02 DS-219 6/9/99

6/9/99 9/30/99

C3.7 3/11/99

20 C3 CLJ Specification for Aluminum Brazing

7/27/00 WD-350 7/12/00 WD-570 4/23/03

CD-394 3/5/01

3/5/01

C3.8 REAFFIRMED 5/19/98

10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection of Brazed Joints

6/20/95 7/27/00

Prev. Pub. WD-273 9/29/99 WD-540 12/12/02

CD-571 5/19/03

5/19/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 6

Page 7: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

C4.3 9/23/83

15 C4B HE 14 Recommended Practices for Safe Oxyfuel Gas Heating Torch Operation

8/11/94 SC-97-11 4/19/97 WD-579 6/13/03

C-97-18 4/19/97 CD-585 6/13/03

6/13/03 TAC-97-26 1/12/98

1/12/98 4/30/98

C4.4 NEW

75 C4D HE DS-1 Recommended Practice for Heat Shaping and Straightening

10/22/98 WD-213 5/3/99 WD-321 3/17/00 WD-354 7/24/00 WD-390 11/27/00 WD-591 8/15/03

CD-217 5/3/99 CD-308 3/17/00 CD-331 7/24/00 CD-356 11/27/00 CD-605 8/15/03

8/15/03 DS-240 11/10/99

11/10/99 1/18/00

C5.5/C5.5M 6/4/03

130 C5C PH DS-1 Recommended Practices for Gas Tungsten Arc Welding

2/27/98 Prev. Pub. WD-214 5/6/99 WD-542 1/8/03

CD-218 5/6/99 CD-495 1/8/03

1/8/03 DS-239 11/3/99 DS-355 4/4/03

11/3/1999 4/4/03

1/4/2000 5/27/03

n/a 5/27/03

C5.10/C5.10M 7/29/03

64 C5O PH Recommended Practices for Shielding Gases for Welding and Plasma Arc Cutting

10/22/98 Prev. Pub. WD-385 11/9/00 WD-456 9/11/01 WD-569 4/21/03

CD-445 2/28/02 CD-566 4/21/03

4/21/03 DS-346 12/6/02 DS-357 5/31/03

12/6/2002 5/31/03

2/11/03 7/22/03

n/a 7/22/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 7

Page 8: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

C6.1 REAFFIRMED 11/9/98

35 SPH DS-1 Recommended Practices for Friction Welding

1/8/96 CD-417 8/14/01

8/14/01

C6.2/C6.2M NEW

13 SPH DS-2 Specification for Qualification of Friction Welding

8/31/95 9/14/90 C-96-58 10/11/96 CD-332 5/26/00 CD-404 4/30/01

4/30/01 DS-282 7/23/00

7/23/00 9/26/00

C7.1M/C7.1 8/19/99 PUBLISHED 10/5/99

66 C7B HE DS-1 Recommended Practices for Electron Beam Welding

7/7/03 WD-517 7/17/02

CD-557 3/24/03

3/24/03 DS-363 8/15/03

8/15/03 10/7/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 8

Page 9: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

D1.1/D1.1M 8/31/01 PUBLISHED 11/13/01

542 D1 JLG CD-12 Structural Welding Code — Steel

7/8/03

WD-404 1/8/01 D1.1-2004 WD-431 3/7/01 D1.1-2004 WD-432 3/8/01 D1.1-2004 WD-506 5/27/02 WD-512 7/1/02 WD-531 9/9/02 WD-537 11/29/02 D1.1-2004 WD-548 1/20/03 D1.1-2004 WD-548 1/20/03 D1.1-2004 WD-552 1/27/03 D1.1-2006 WD-584 7/18/03 D1.1-2006 WD-585 7/18/03 D1.1-2006 WD-586 7/18/03 D1.1-2006

CD-455 6/10/02 D1.1-2004 CD-477 9/9/02 CD-478 9/9/02 CD-499 1/20/03 D1.1-2004 CD-503 3/17/03 CD-590 6/30/03 D1.1-2004 CD-596 7/18/03 D1.1-2006 CD-614 9/19/03

9/19/03

DS-364 8/24/03

8/24/03 10/21/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 9

Page 10: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

D1.4 11/6/97 Extension granted until 3/10/04

56 D1 JLG Structural Welding Code — Reinforcing Steel

3/16/01 WD-346 6/9/00

CD-260 10/20/99 CD-304 3/3/00 CD-305 3/3/00 CD-319 6/9/00 CD-467 8/28/02 CD-469 8/28/02 CD-470 8/28/02 CD-556 3/17/03

3/17/03

D3.7 10/27/90 REAFFIRMED 8/9/00 Extension granted until 10/26/01

75 D3A AD Guide for  Aluminum Hull Welding

8/31/95 WD-327 5/12/00

CD-368 1/12/01

1/12/01 DS-328 11/10/01

11/10/01 1/15/02

D14.4 11/14/97

126 D14B PH Classification and Application of Welded Joints for Machinery and Equipment

10/22/98 Prev. Pub. WD-500 4/29/02 WD-572 5/12/03

CD-568 5/12/03

5/12/03

D14.6 1/12/96 Extension granted until 4/19/03.

125 D14G PH Specification for Welding of Rotating Elements of Equipment

10/22/98 Prev. Pub. WD-573 4/21/03

CD-572 5/21/03 04-CD2-BM 10/11/03

10/11/03

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 10

Page 11: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

D16.1M/D16.1 New

D16 PH WD-1 Specification for Robotic Arc Welding Safety

7/3/03 WD-563 4/9/03

CD-591 7/2/03

7/2/03 DS-361 8/2/03

8/2/03 9/30/03

D18.3 NEW

D18 PH Specification for Welding of austenitic Stainless Steel Vessels and Equipment in Sanitary (Hygienic) Applications

11/12/99 10/28/99 WD-478 1/25/02 WD-550 1/23/03 WD-551 1/23/03

CD-500 1/23/03

1/23/03

G1.6 NEW

G1A EFM WD2 Specification for the Qualification of Plastic Welding Inspectors

3/15/99 4/10/99 WD-209 4/23/99 WD-381 10/19/00 WD-504 5/20/02 WD-545 12/26/02 WD-604 10/17/2003

CD-497 1/2/03 CD-615 10/17/03

10/17/03

G2.1M/G2.1 9/9/02 PUBLISHED 2/12/03

56 G2C EFM DS-2 Recommended Practices for the Joining of Wrought Nickel-Base alloys

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 11

Page 12: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Publish Goals for New and Revised Standards

BRH 1991

493 C3 CLJ Brazing Handbook N/A N/A N/A CD-311 5/3/00

5/3/00 N/A N/A N/A N/A N/A

EWH, XII NEW

SPH Effects of Welding on Health, XII

N/A N/A N/A N/A N/A N/A

FY - 2004 Publish Goals for New Revised Standards/Technical Services/10/3/2003 12

Page 13: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

A2.4 11/6/97

109 A2C CLJ N/A Standard Symbols for Welding, Brazing and Nondestructive Examination

3/5/99 Prev. Pub.

A3.0 7/2/01 PUBLISHED 10/8/01

152 A2B CLJ N/A Standard Welding Terms and Definitions

7/21/03 WD-529 9/16/02

A10.1 NEW

40 A10C RKG WD-1 Recommended Practices for Calibration and Performance Testing of Current Sensing Coils and Weld Current Monitors used in Single Phase AC Resistance Welding

3/22/00 WD-351 7/7/00 WD-383 10/23/00 WD-443 7/9/2001 WD-515 7/11/02

B2.2 2/14/91 Extension granted until 2/14/01

53 B2A LPC 1 Specification for Brazing Procedure and Performance Qualification

10/9/96 SC-98-03 2/21/98 WD-313 2/21/00 WD-370 9/18/00

Document Status Report 10/3/03

FY-2004 Main Committee Ballot Goals

FY-2004 Main Committee Ballot Goals/Technical Services/10/3/2003 13

Page 14: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Main Committee Ballot Goals

C5.1 1973

76 C5I PH Recommended Practices for Plasma Arc Welding

10/22/98 Prev. Pub.

FY-2004 Main Committee Ballot Goals/Technical Services/10/3/2003 14

Page 15: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Main Committee Ballot Goals

D1.3 2/5/98 Extension granted until 3/9/05.

76 D1 JLG CD-6 Structural Welding Code — Sheet Steel

3/16/01 IBM8.4 6/23/97 WD-368 WD-1 9/11/00 WD-369 WD-2 9/13/00 WD-402 1/1/01 WD-427 2/15/01 WD-437 5/2/01 WD-439 5/18/01 WD-444 7/5/01 WD-454 8/2/01 WD-462 10/22/01 WD-469 12/7/01 WD-471 12/13/01 WD-482 2/7/02 WD-483 2/11/02 WD-487 2/13/02 WD-488 2/14/02

CD-293 2/7/00 CD-299 2/24/00 CD-346 9/8/00 CD-364 1/3/01 CD-387 2/15/01 CD-401 4/25/01 CD-413 7/5/01 CD-424 8/20/01 CD-431 12/7/01 CD-432 12/13/01 CD-443 2/13/02 CD-453 5/23/02 CD-454 5/27/02 CD-584 6/9/03

6/9/03

D1.6 3/10/99

224 D1 JLG DS-1 Stainless Steel Welding Code

3/16/01 WD-554 3/17/03

FY-2004 Main Committee Ballot Goals/Technical Services/10/3/2003 15

Page 16: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FY-2004 Main Committee Ballot Goals

D10.8M/D10.8 7/17/96

12 D10I PH WD-1 Recommended Practices for Chromium-Molybdenum Steel Piping and Tubing

7/11/03 WD-438 5/7/01 WD-576 6/5/03 WD-578 6/5/03

CD-576 6/5/03

6/5/03

D10.11M/D10.11 1987 REAFFIRMED 4/21/92 Extension granted until  9/30/00

19 D10S PH DS-2 Recommended Practices for Root Pass Welding of Pipe without Backing

9/10/98 WD-118 8/8/98 04-DS3-BS 9/21/03

CD-170 12/31/98 CD-406 5/7/01 04-DS3-BM 9/21/03

9/21/03 DS-285 9/14/00

9/14/00 11/21/00

D14.1 12/8/97

142 D14A PH Specification for Welding Industrial and Mill Cranes

10/22/98 Prev. Pub. WD-580 6/26/03

CD-589 6/26/03

6/26/03

D14.5 2/21/97

156 D14E PH Specification for Welding of Presses and Press Components

10/22/98 Prev. Pub.

D18.1 4/14/99

18 D18 PH Specification for Welding of Austenitic Stainless Steel Tubing in Sanitary (Hygienic) Applications

1/24/00

FY-2004 Main Committee Ballot Goals/Technical Services/10/3/2003 16

Page 17: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

A1.1 10/1/01 PUBLISHED 12/4/01

40 A1 SPH DS-1 Metric Practice Guide for the Welding Industry

A2.1 1998 PUBLISHED 10/19/99

1 A2 CLJ N/A Welding Symbols Chart N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

A2.4 11/6/97 Refer to the FY-2004 Main Committee Ballot Goals Sheet

A3.0 7/2/01 PUBLISHED 10/8/01 Refer to FY-2004 Main Committee Ballot Goals Sheet

A4.2M/A4.2 11/6/97 Extension granted until 11/5/05.

34 A5D RKG Standard Procedures for Calibrating Magnetic Instruments

A4.3 1993 REAFFIRMED 5/13/97 Extension granted until 5/13/04.

17 A5W RKG Standard Procedures for Determination of Diffusible Hydrogen Content

A4.4M 2/28/01 PUBLISHED 7/9/01

32 A5W RKG Standard Procedures for Determination of Moisture Content of Welding Fluxes and Welding Electrode Flux Coverings

Document Status Report 10/3/03

Document Status Report/Technical Services/10/3/2003 17

Page 18: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.01 12/2/92 REAFFIRMED 12/8/99

10 A5T RKG 1 Filler Metal Procurement Guidelines

4/21/99

Document Status Report/Technical Services/10/3/2003 18

Page 19: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.02 NEW

A5T RKG Specification for the Packaging of Welding Consumables

2/18/98 9/15/95

A5.1/A5.1M 9/5/03

57 A5A RKG CD-2 Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding

4/21/99 WD-485 2/11/02

CD-441 2/11/02

2/11/02 DS-354 2/22/03

2/22/03 4/15/03 FDS-408 7/17/03

8/1/03

A5.2/A5.2M REAFFIRMED 5/13/97 Extension granted until 5/13/04

9 A5A RKG Specification for Carbon and Low Alloy Steel Rods for Oxyfuel Gas Welding

7/8/03 WD-561 4/5/03

A5.3/A5.3M 2/11/99

28 A5C RKG Specification for Aluminum and Aluminum-Alloy Electrodes for Shielded Metal Arc Welding

A5.4/A5.4M 4/29/92 REAFFIRMED 8/9/00

5 A5D RKG CD-1 Specification for Stainless Steel Welding Electrodes for Shielded Metal Arc Welding

4/21/99 WD-533 10/14/02

E9-CD1-BM1 10/12/03

10/12/03

Document Status Report/Technical Services/10/3/2003 19

Page 20: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.5/A5.5M 11/12/96 Extension granted until 2/25/04.

46 A5A RKG Specification for Low-Alloy Steel Electrodes for Shielded Metal Arc Welding

7/8/03 WD-553 1/31/03

CD-612 8/22/03

8/22/03

A5.6 2/17/84 REAFFIRMED 3/10/00

22 A5F RKG 9 Specification for Covered Copper and Copper-Alloy Arc Welding Electrodes

4/21/99 WD-331 6/3/00

CD-316 6/3/00

A5.7 2/24/84 REAFFIRMED 12/19/00

17 A5F RKG 6 Specification for Copper and Copper-Alloy Bare Welding Rods and Electrodes

4/21/99 WD-361 Approval to Publish 8/23/00

A5.8 9/1/92 Extension granted until 8/31/02 REAFFIRMED 1/16/03

Refer to the FY-2004 Publish Goals for New & Revised Standards Sheet

A5.9 12/23/92 REAFFIRMED 12/8/99

24 A5D RKG CD-1 Specification for Bare Stainless Steel Welding Electrodes and Rods

4/21/99

A5.10/A5.10M 11/23/99 PUBLISHED 3/28/00

24 A5C RKG Specification for Bare Aluminum and Aluminum-Alloy Welding Electrodes and Rods

Document Status Report/Technical Services/10/3/2003 20

Page 21: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.11/A5.11M 11/6/97 Extension granted until 11/5/05.

Refer to the FY-2004 Publish Goals for New & Revised Standards

A5.12/A5.12M 2/5/98 Extention granted until 3/4/05.

24 A5I RKG Specification for Tungsten and Tungsten-Alloy Electrodes for Arc Welding and Cutting

A5.13 9/7/00 PUBLISHED 4/5/01

36 A5G RKG Specification for Surfacing Electrodes for Shielded Metal Arc Welding

A5.14/A5.14M 12/8/97 Extension granted until 12/7/05.

Refer to the FY-2004 Publish Goals for New & Revised Standards

A5.15 1990 REAFFIRMED 9/25/97 Extension granted until 9/25/04

30 A5J RKG Specification for Welding Electrodes and Rods for Cast Iron

Document Status Report/Technical Services/10/3/2003 21

Page 22: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.16/ A5.16M REAFFIRMED 4/17/97 Extension granted until 4/17/04

Refer to the FY-2004 Publish Goals for New & Revised Standards

A5.17/A5.17M 9/25/97 Extension granted until 9/25/04

40 A5B RKG Specification for Carbon Steel Electrodes and Fluxes for Submerged Arc Welding

A5.18/A5.18M 2/5/01 PUBLISHED 4/26/01

44 A5O RKG 2 Specification for Carbon Steel Electrodes and Rods for Gas Shielded Arc Welding

A5.19 REAFFIRMED 5/13/97 Extension granted until 5/13/04

17 A5L RKG 1 Specification for Magnesium-Alloy Welding Electrodes and Rods

A5.20/A5.20M 8/28/94 Extension granted until 9/25/04

32 A5M RKG 1M Specification for Carbon Steel Electrodes for Flux Cored Arc Welding

1/26/01 WD-547 1/7/03

A5.21 3/1/01 PUBLISHED 5/22/01

40 A5G RKG 17 Specification for Bare Electrodes and Rods for Surfacing

A5.22 12/1/94 Extension granted until 12/1/04

36 A5D RKG 1 Specification for Stainless Steel Electrodes for Flux Cored Arc Welding and Stainless Steel Flux Cored Rods for Gas Tungsten Arc Welding

4/8/94 SC-96-32 6/10/96

Document Status Report/Technical Services/10/3/2003 22

Page 23: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.23/A5.23M 9/25/97 Extension granted until 9/25/04

46 A5B RKG Specification for Low-Alloy Steel Electrodes and Fluxes for Submerged Arc Welding

A5.24 REAFFIRMED 8/11/97

Extension granted until 8/11/04

Refer to the FY-2004 Publish Goals for New & Revised Standards A5.25/A5.25M 12/8/97 REAFFIRMED 2/28/03

34 A5P RKG Specification for Carbon and Low-Alloy Steel Electrodes and Fluxes for Electroslag Welding

WD-522 8/21/02

CD-483 11/22/02

11/22/02 DS-349 1/2/03

1/2/03 2/25/03 n/a 2/27/03

A5.26/A5.26M 9/25/97 REAFFIRMED 2/28/03 Extension granted until 9/25/04

34 A5P RKG Specification for Carbon and Low-Alloy Steel Electrodes for Electrogas Welding

WD-523 8/21/02

CD-484 11/22/02 Approval to Reaffirm

11/22/02 DS-350 1/2/03

1/2/03 2/25/03 n/a 2/27/03

A5.28 3/29/96 Extension granted until 4/19/03. Extension granted until 3/28/05.

Refer to the FY-2004 Publish Goals for New & Revised Standards

Document Status Report/Technical Services/10/3/2003 23

Page 24: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.29/A5.29M 3/19/98 Extension granted until 3/18/05.

48 A5M RKG WD-2 Specification for Low-Alloy Steel Electrodes for Flux Cored Arc Welding

1/26/01 WD-495 2/25/02 WD-546 1/7/03

CD-428 11/1/01

11/1/01

A5.30/A5.30M 8/11/97 Extension granted until 9/12/04

64 A5N RKG Specification for Consumable Inserts

7/8/03 WD-516 7/17/02

CD-491 12/23/02 CD-600 7/28/03

7/28/03

A5.31 4/24/92 REAFFIRMED 2/4/03

11 A5H RKG WD-6 Specification for Fluxes for Brazing and Braze Welding

4/21/99 WD-349 6/29/00 WD-408 2/25/01 WD-490 2/18/02 WD-505 5/20/02 Approval to reaffirm WD-571 5/8/03

CD-452 5/20/02 Approval to Reaffirm

5/20/02 Approval to Reaffirm

DS-345 11/28/02 Approval to Reaffirm

11/28/02 1/28/03 n/a 2/3/03

Document Status Report/Technical Services/10/3/2003 24

Page 25: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A5.32/A5.32M 12/8/97 Extension granted until 12/7/05.

28 A5S RKG Specification for Shielding Gases for Welding

2/18/97 Prev. Pub.

A5.34M NEW

A5E RKG SC-3 Specification for Nickel-Alloy Electrodes for Flux Cored Arc Welding

2/27/90 WD-560 4/4/03

A5.35 NEW

A5E RKG Specification for Cobalt and Cobalt-Alloy Welding Electrodes for Shielded Metal Arc Welding

2/7/97

A5.36 NEW

A5E RKG Specification for Cobalt and Cobalt-Alloy Bare Welding Electrodes and Rods

2/7/97

A5.39/A5.39M NEW

A5Y RKG Classification of Fluxes for Gas Shielded Arc Welding

2/12/98 1/30/98

A9.1 10/12/92 Extension granted until 10/11/01

9 A9C LPC WD-1 Guide for a Data Dictionary for the Electronic Exchange of Arc Welding Information

3/5/99 Prev. Pub. WD-174 1/7/99 WD-305 2/1/00 WD-403 1/8/01

Document Status Report/Technical Services/10/3/2003 25

Page 26: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A9.2 10/12/92 Extension granted until 10/11/01

7 A9C LPC N/A Standard Guide for Recording Arc Weld Material Property and Nondestructive Examination Data in Computerized Data Bases

N/A

Document Status Report/Technical Services/10/3/2003 26

Page 27: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

A9.3 NEW

A9B LPC N/A Specification for the Exchange of Arc Welding Information Between Intelligent Systems

4/14/97 2/7/97

A9.4 NEW

LPC Specification for Data Structures and Protocols for the Exchange of Intra-Cell Welding Information

7/11/03 WD-384 11/12/00 WD-418 2/5/01

A10.1 NEW Refer to the FY-2004 Main Committee Ballot Goals Sheet

A10.2 NEW

20 A10C RKG WD-1 Recommended Practices for Calibration of Devices for Welding Force Measurement

3/22/00

B1.10 10/26/99 PUBLISHED 2/15/00

42 B1 AD Guide for the Nondestructive Inspection of Welds

7/23/03 CD-486 12/18/02 Collect comments for new revision

12/18/02

B1.11 1/7/00 PUBLISHED 4/13/00

37 B1 AD Guide for the Visual Examination of Welds

7/25/03 CD-487 12/18/02 Collect comments for new revision

12/18/02

Document Status Report/Technical Services/10/3/2003 27

Page 28: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B1.12 NEW

B1 AD Standard for Radiographic Inspection Acceptance Criteria

B1-TR1 NEW

B1 AD Welding Procedure and Performance Qualification Testing Requirements Comparison Charts

n/a 4/10/99 n/a n/a n/a n/a n/a

B1-TR2 NEW

B1 AD Weld Acceptance Criteria Comparison Charts

n/a 4/10/99 n/a n/a n/a n/a n/a

B2.1 11/14/00 PUBLISHED 6/11/01 Refer to the FY-2004 Publish Goals for New & Revised Standards

B2.1-001–002 12/18/89 Extension granted until 11/30/00

108 B2 LPC WPSs 10/6/95

Document Status Report/Technical Services/10/3/2003 28

Page 29: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1-003 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) of Galvanized Steel (M-1),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1-004 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) of Carbon Steel (M-1, Group 1),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-8-005 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) of Austenitic Stainless Steel (M-8, P-8, or S-8), 18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

Document Status Report/Technical Services/10/3/2003 29

Page 30: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1/8-006 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Metal Arc Welding of Carbon Steel to Austenitic Stainless Steel(M-1 to M-8, P-8, or S-8), 18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1-007 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Galvanized Steel (M-1),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1-008 6/10/02 PUBLISHED 10/11/02

16 B2 LPC Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Carbon Steel (M-1, P-1, or S-1),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

Document Status Report/Technical Services/10/3/2003 30

Page 31: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-8-009 6/10/02 PUBLISHED 10/11/02

16 B2 LPC Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Austenitic Stainless Steel (M-8, P-8, or S-8),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1/8-010 6/10/02 PUBLISHED 10/11/02

16 B2 LPC Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1, P-1, or S-1 to M-8, P-8, or S-8), 18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1-011 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Galvanized Steel, 10 Gauge through 18 Gauge,in the As-Welded Condition, with or without Backing

Document Status Report/Technical Services/10/3/2003 31

Page 32: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1-012 6/10/02 PUBLISHED 10/11/02

16 B2 LPC Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel, 10 Gauge through 18 Gauge, in theAs-Welded Condition, with or without Backing

B2.1-8-013 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 10 Gauge through 18 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1/8-014 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1 to M-8/P-8/S-8, Group 1), 10 Gauge through 18 Gauge, in the As-Welded Condition, with or without Backing

Document Status Report/Technical Services/10/3/2003 32

Page 33: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-22-015 6/10/02 PUBLISHED 10/11/02

16 B2 LPC DS-1 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Aluminum (M/P/S-22 to M/ P/S-22),18 Gauge through 10 Gauge, in the As-Welded Condition, with or without Backing

B2.1-1-016–022, and 026 4/15/93 Extension granted until 11/30/00 for 016-022 Extension granted until 10/31/00 for 026

132 B2 LPC 11 WPSs

B2.1-1-027 6/24/98

20 B2 LPC 1 WPS

B2.1-1-201–209 87 B2 LPC 9 WPSs

Document Status Report/Technical Services/10/3/2003 33

Page 34: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1-210 10/31/01 PUBLISHED 1/21/02

17 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 through 1-1/2 inch Thick, INMs-1 and ER70S-2, As Welded or PWHT Condition, Primarily Pipe Applications

B2.1-1-211 10/31/01 PUBLISHED 1/21/02

17 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root followed by Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 through 1-1/2 inch Thick, INMs-1, ER70S-2, and E7018, As-Welded or PWHT Condition, Primarily Pipe Applications

Document Status Report/Technical Services/10/3/2003 34

Page 35: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-8-212 10/31/01 PUBLISHED 1/21/02

15 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/16 through 1-1/2 inch Thick, ER3XX, As-Welded Condition, Primarily Pipe Applications

B2.1-8-213 3/20/97

24 B2 LPC WPSs

B2.1-8-214 10/31/01 PUBLISHED 1/21/02

16 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding followed by Shielded Metal Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/8 through 1-1/2 inch Thick, ER3XX and E3XX-XX As-Welded Condition, Primarily Pipe Applications

Document Status Report/Technical Services/10/3/2003 35

Page 36: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-8-215 10/31/01

18 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/8 through 1-1/2 inch Thick, IN3XX and ER3XX, As-Welded Condition, Primarily Pipe Applications

4/27/01 DS-308 6/30/01

6/30/01 8/28/01 n/a 10/29/01

B2.1-8-216 10/31/01 PUBLISHED 1/21/02

18 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root followed by Shielded Metal Arc Welding of Austentic Stainless Steel (M-8/P-8/S-8, Group 1), 1/8 through 1-1/2 inch Thick, IN3XX, ER3XX, and E3XX-XX, As-Welded Condition, Primarily Pipe Applications

Document Status Report/Technical Services/10/3/2003 36

Page 37: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-4-217 12/8/99

20 B2 LPC DS-1 WPSs

B2.1-4-218 12/8/99

16 B2 LPC DS-1 WPSs

B2.1-4-219 12/8/99

20 B2 LPC DS-1 WPSs

B2.1-4-220-221 12/8/99

220-24 221-22

B2 LPC DS-1 WPSs

B2.1-5A-222-226 12/8/99

222-20 223-16 224-20 225-22 226-22

B2 LPC DS-1 WPSs

Document Status Report/Technical Services/10/3/2003 37

Page 38: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1/8-227 8/28/02 PUBLISHED 11/8/02

16 B2 LPC CD-1 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1/P-1/S-1 Groups 1 and 2 Welded to M-8/P-8/S-8, Group 1) 1/16 through 1-1/2 inch thick, ER309, As-Welded Condition, Primarily Pipe Applications

B2.1-1/8-228 8/28/02 PUBLISHED 11/8/02

16 B2 LPC CD-1 Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1/P-1/S-1 Groups 1 and 2 Welded to M-8/P-8/S-8, Group 1) 1/8 through 1-1/2 inch thick, E309-15, 16, or, 17, As-Welded Condition, Primarily Pipe Applications

Document Status Report/Technical Services/10/3/2003 38

Page 39: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1/8-229 8/28/02 PUBLISHED 11/8/02

20 B2 LPC CD-1 Standard Welding Procedure Specification (WPS) for Gas tungsten Arc Welding Followed By Carbon Steel to Austenitic Stainless Steel (M-1/P-1/S-1 Groups 1 and 2 Welded to M-8/P-8/S-8, Group 1) 1/8 through 1-1/2 inch thick, ER309 and E309-15, 16, or 17, As-Welded Condition, Primarily Pipe Applications

B2.1-1/8-230 8/28/02 PUBLISHED 11/8/02

18 B2 LPC CD-1 Standard Welding Procedure (WPS) for Gas Tungsten Arc Welding, with Consumable Insert Root, of Carbon Steel to Austenitic Stainless Steel (M-1/P-1/S-1, Groups 1 and 2 Welded to M-8/P-8/S-8, Group 1) 1/16 through 1-1/2 inch thick, IN309, and ER309 As-Welded Condition, Primarily Pipe Applications

Document Status Report/Technical Services/10/3/2003 39

Page 40: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1/8-231 8/28/02 PUBLISHED 11/8/02

18 B2 LPC CD-1 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root, Followed by Shielded Metal Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1/P-1/S-1, Groups 1 and 2 welded to M-8/P-8/S-8, Group 1) 1/8 through 1-1/2 inch thick, IN309, ER309 and E309-15, 16, or 17, As-Welded Condition, Primarily Pipe Applications

B2.1-1-232 NEW Refer to the FY-2004 Publish Goals for New & Revised Standards

B2.1-1-233 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

Document Status Report/Technical Services/10/3/2003 40

Page 41: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-1-234 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

B2.1-1-235 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

B2.1-8-023 B2 LPC WPS

B2.1-8-024 10/31/01 Extension granted until 11/30/00

PUBLISHED 1/21/02

19 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/16 through 1-1/2 inch Thick, ER3XX, As Welded Condition, Primarily Plate and Structural Applications

Document Status Report/Technical Services/10/3/2003 41

Page 42: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B2.1-8-025 10/31/01 Extension granted until 11/30/00 PUBLISHED 1/21/02

19 B2 LPC DS-2 Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding followed by Shielded Metal Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/8 through 1-1/2 inch Thick, ER3XX and E3XX-XX, As Welded Condition, Primarily Plate and Structural Applications

B2.2 2/14/91 Extension granted until 2/14/01

Refer to the FY-2004 Main Committee Ballot Goals Sheet

B4.0 12/30/97

108 B4 AD Standard Methods for Mechanical Testing of Welds

10/19/99 WD-378 9/7/00

B4.0M 7/25/00 PUBLISHED 10/18/00

114 B4 AD WD-1 Standard Methods for Mechanical Testing of Welds

B4.1 NEW

AD Destructive tests on welds in metallic materials - Transverse tensile test

Document Status Report/Technical Services/10/3/2003 42

Page 43: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B4.2 NEW Refer to the FY-2004 Publish Goals for New & Revised Standards

B4.3 NEW Refer to the FY-2004 Publish Goals for New & Revised Standards

B5.1 4/29//03 PUBLISHED 6/19/03

20 B5A SPH WD-4 Specification for the  Qualification of Welding Inspectors

B5.2 5/11/01 PUBLISHED 7/24/01

20 B5B SPH FDS-1 Specification for the Qualification of Welding Inspector Specialists and Welding Inspector Assistants

B5.4 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

B5.5 7/25/00 PUBLISHED 10/11/00

26 B5E SPH Specification for the Qualification  of Welding Educators

Document Status Report/Technical Services/10/3/2003 43

Page 44: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B5.6 NEW

SPH Specification for the Qualification of Welding Technicians

5/17/02

B5.8 NEW

B5H SPH WD-3 Specification for the  Qualification of Underwater Welding Inspectors

5/20/02 WD-470 12/13/01 WD-507 6/6/02

B5.9 4/13/00 PUBLISHED 6/14/00

14 B5I SPH Specification for the qualification of Welding Supervisors

B5.13 NEW

B5E SPH WD-4 Specification for the Qualification of Facilities Delivering National Skills Standard Curriculum

3/2/98 WD-406 1/15/01 WD-450 7/19/01

CD-418 7/19/01

7/19/01

B5.14 7/12/02 PUBLISHED 10/8/02

12 B5N SPH WD-4 Guide for the Qualification of Welding Sales Representative

B5.15 3/20/03 PUBLISHED 10/8/02

16 B5K SPH WD-6 Specification for the Qualification of Radiographic Interpreters

B5.16 7/26/01 PUBLISHED 10/18/00

18 B5C SPH FDS-1 Specification for the Qualification of  Welding Engineers

Document Status Report/Technical Services/10/3/2003 44

Page 45: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

B5.17 7/11/00

14 B5G SPH Specification for the Qualification of Welding Fabricators

5/20/02 WD-503 5/17/02 WD-566 4/7/03 WD-583 7/17/03

CD-451 5/17/02 CD-482 10/30/02 CD-563 4/7/03 CD-595 7/17/03

7/17/03 DS-365 10/11/03

10/11/03 12/2/03

C1.1M/C1.1 1/31/00 PUBLISHED 4/17/00

122 C1 HE DS-2 Recommended Practices for Resistance Welding

C1.4 8/31/99 PUBLISHED 11/15/99

28 C1 HE DS-1 Specification for Resistance Welding of Uncoated Carbon and Low-Alloy Steels

C2.1 1973

29 C2 EFM Recommended Safe practices for Thermal Spraying

C2.14 1974

36 C2 EFM Corrosion Test of Flame-Sprayed Coated Steel 19-Year Report

C2.16/C2.16M 7/23/02 PUBLISHED 11/18/02

86 C2F EFM WD-2 Guide for Thermal Spray Operator Qualification

Document Status Report/Technical Services/10/3/2003 45

Page 46: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C2.18 4/22/93 REAFFIRMED 1/17/01 Extension granted until 6/30/02

30 C2B EFM WD-3 Guide for the Protection of Steel with Thermal Sprayed Coatings of Aluminum and Zinc and Their Alloys and Composites

3/29/99 10/20/99

WD-285 11/17/99

CD-264R 11/4/99

11/4/99 DS-269 5/19/00

5/19/00 7/18/00 n/a 1/10/01

C2.19 NEW

C2A EFM 1 Machine Element Repair 6/24/96 3/5/93 CD-312 C2A 5/10/00 WD-544 1/27/03

C2.20/C2.20M 12/16/02 PUBLISHED 3/6/03

40 C2C EFM CD-2 Specification for Thermal Spraying Zinc Anodes on

C2.21M/C2.21 NEW

C2G EFM DS-1 Thermal Spray Equipment Acceptance Inspection

8/11/94 2/24/94 WD-528 9/11/02

CD-146 11/7/98 CD-476 9/11/02

9/11/02 DS-133 1/22/99 DS-352 1/9/03

1/22/1999 1/9/03

4/30/1999 3/12/03

n/a 9/26/03

C2.22 NEW

C2H EFM 1 Guide for Metallographic Sample Preparation and Evaluation of Thermal Spray Coatings

C2.23M/C2.23, NACE No. 12, SSPC-CS 23.00 3/17/03 PUBLISHED 8/26/03

48 C2B EFM WD-2 Specification for the Application of Thermal Spray Coatings of Aluminum, Zinc, & Their alloys & Composites (Metallizing) for the Corrosion protection of Steel

Document Status Report/Technical Services/10/3/2003 46

Page 47: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C2.24 NEW

C2I EFM Modified Layer Removal Method Procedure for Evaluating Residual Stresses in Thermal Spray Coatings

11/3/00

Document Status Report/Technical Services/10/3/2003 47

Page 48: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C2.25/C2.25M 4/23/02 PUBLISHED 7/12/02

26 C2J EFM Specification for Thermal Spray Feedstock-Solid and Composite Wire and Ceramic Rods

C3.2M/C3.2 12/17/01 PUBLISHED 4/22/02

30 C3 CLJ WD-7 Standard Method For Evaluating the Strength of Brazed Joints

C3.3 6/10/02 PUBLISHED 8/13/02

32 C3 CLJ WD-3 Recommended Practices for the Design, Manufacture, and Inspection of Critical Brazed Components

C3.4 3/11/99

18 C3 CLJ Specification for Torch Brazing

7/27/00

C3.5 3/11/99

18 C3 CLJ Specification for Induction Brazing

7/27/00

C3.6 3/11/99

18 C3 CLJ Specification for Furnace Brazing

7/27/00

C3.7 3/11/99 Refer to the FY-2004 Publish Goals for New & Revised Standards

Document Status Report/Technical Services/10/3/2003 48

Page 49: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C3.8 REAFFIRMED 5/19/98

Refer to the FY-2004 Publish Goals for New & Revised Standards

C3.9 NEW

C3 CLJ Specification for Resistance Brazing

2/2/99 WD-275 9/29/99 WD-527 9/6/02

C3.10 NEW

C3 CLJ WD-1 Recommended Practice for Laser Holographic Inspection of Brazed Joints

1/22/99 4/10/99 WD-276 9/29/99 WD-460 10/15/01

Document Status Report/Technical Services/10/3/2003 49

Page 50: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C4.1 1977

5 C4A HE Oxygen Cutting Surface Roughness Gauge

C4.2 8/1/02 PUBLISHED 10/8/02

36 C4B HE CD-2 Operator’s Manual for Oxyfuel Gas Cutting

C4.3 9/23/83 Refer to the FY-2004 Publish Goals for New & Revised Standards

C4.4 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

C4.5 2/2/00 PUBLISHED 3/28/00

14 C4E HE DS-1 Uniform Designation Systems for Oxyfuel Nozzles

N/A WD-410 2/1/01

CD-371 2/1/01

2/1/01

C5.1 1973 Refer to the FY-2004 Main Committee Ballot Goals Sheet

Document Status Report/Technical Services/10/3/2003 50

Page 51: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C5.2 5/4/01 PUBLISHED 7/24/01

52 C5J PH CD-1 Recommended Practices for Plasma Arc Cutting

C5.3 11/21/00 PUBLISHED 2/27/01

32 C5K PH Recommended Practices for Air Carbon Arc Gouging and Cutting

C5.4 6/28/93 Extension granted until 6/27/02

48 C5H PH Recommended Practices for Stud Welding

8/8/00 Prev. Pub.

C5.5/C5.5M 6/4/03

Refer to the FY-2004 Publish Goals for New & Revised Standards

C5.6 REAFFIRMED 1/20/94 Extension granted until 5/4/02

75 C5D PH DS-6 Recommended Practices for Gas Metal Arc Welding

6/1/97 Prev. Pub. WD-150 10/4/98

CD-144 10/4/98

10/4/98 TAC-97-11 6/15/97

6/15/97 8/29/97

C5.7 5/5/00 PUBLISHED 8/18/00

68 C5P PH DS-1 Recommended Practices for Electrogas Welding

C5.8 NEW

C5G PH Recommended Practices for Flux Cored Arc Welding

8/8/00

Document Status Report/Technical Services/10/3/2003 51

Page 52: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C5.9 NEW

C5B PH Recommended Practices for Shielded Metal

10/22/98

C5.10/C5.10M 7/29/03 Refer to the FY-2004 Publish Goals for New & Revised Standards

C5.11 NEW

C5F PH Recommended Practices for Electroslag Welding

9/23/99

Document Status Report/Technical Services/10/3/2003 52

Page 53: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

C5.12 NEW

C5E PH Recommended Practices for Submerged Arc Welding

8/11/94 SC-95-12 7/16/95

C-95-15 7/16/95

7/16/95

C6.1 REAFFIRMED 11/9/98

C6.2/C6.2M NEW

C7.1M/C7.1 8/19/99 PUBLISHED 10/5/99 Refer to the FY-2004 Publish Goals for New & Revised Standards

C7.2 11/9/98

116 C7C HE DS-1 Recommended Practices for Laser Beam Welding

12/19/96 WD-556 3/24/03

C7.3 7/12/99 PUBLISHED 11/2/99

20 C7B HE DS-1 Electron Beam Welding Process Specification

WD-577 5/6/03 Reaffirm

CD-575 5/6/03 Reaffirm

5/6/03 DS-358 6/5/03 Reaffirm

6/5/03 Reaffirm

9/23/03 Reaffirm

n/a 9/26/03 Reaffirm

C7.4 NEW

C7C HE Specification for Laser Beam Welding Process

7/8/03 WD-312 2/21/00 WD-446 7/18/01

Document Status Report/Technical Services/10/3/2003 53

Page 54: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D1.1/D1.1M 8/31/01 PUBLISHED 11/13/01 Refer to the FY-2004 Publish Goals for New & Revised Standards

D1.2/D1.2M 2/6/03 PUBLISHED 5/13/03

216 D1 JLG Structural Welding Code —  Aluminum

D1.3 2/5/98 Extension granted until 3/9/05.

Refer to the FY-2004 Main Committee Ballot Goals Sheet

D1.4 11/6/97 Extension granted until 3/10/04

Refer to the FY-2004 Publish Goals for New & Revised Standards

Document Status Report/Technical Services/10/3/2003 54

Page 55: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D1.5M/D1.5 11/30/01 PUBLISHED 3/4/02

384 D1 JLG CD-2 Bridge Welding Code

7/8/03

WD-513 7/1/02 WD-520 8/16/02

CD-463 7/18/02 CD-559 3/21/03 CD-561 3/21/03

3/21/03

D1.6 3/10/99 Refer to the FY-2004 Main Committee Ballot Goals Sheet

D1.7 NEW

D1 JLG Guide for Strengthening and Repair of Existing Structures

2/12/98 11/4/97

D1.8 NEW

D1 JLG Guide for Welding and Inspection of Seismically Loaded Structures

4/22/97 11/4/97 WD-387 11/22/00

D3.5 4/29/93 REAFFIRMED 8/9/00 Extension granted until 4/29/01

107 D3C AD FDS-1 Guide for Steel Hull Welding

8/31/95 WD-264 9/4/99 WD-329 5/22/00 9/4/99

WD-265 9/4/99 WD-328 5/21/00

5/21/00 DS-244 3/30/00

3/30/00 6/6/00 N/a 8/7/00

D3.6M 4/14/99

144 D3B AD Specification for Underwater Welding

Document Status Report/Technical Services/10/3/2003 55

Page 56: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D3.7 10/27/90 REAFFIRMED 8/9/00 Extension granted until 10/26/01

Refer to the FY-2004 Publish Goals for New & Revised Standards

D3.8 NEW

D3D AD Recommended Practices for Underwater Cutting

7/18/03 4/10/99 WD-249 5/26/99

D3.9 NEW

D3E AD Specification for Classification of Weld-Through Primers

2/18/98 2/8/96 WD-144 9/19/98 WD-458 9/19/01 WD-564 4/9/03

CD-566 4/9/03

D5.2 1984

104 D5B LPC D5B-AWWA-

Document Status Report/Technical Services/10/3/2003 56

Page 57: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D8.6 1977

72 D8D HE WD-2 Standard for Automotive Resistance Spot Welding Electrodes

6/28/02 N/A WD-380 10/16/00

D8.7 REAFFIRMED 1/20/94 Extension granted until 10/12/03

13 D8D HE WD-2 Recommended Practices for Automotive Weld Quality — Resistance Spot Welding

8/11/94 2/24/94 WD-453 7/27/01 WD-590 8/15/03

CD-604 8/15/03

8/15/03

D8.8M 2/12/97

15 D8D HE Specification for Automotive and Light Truck Weld Quality  — Arc Welding

7/2/02 N/A WD-505 6/24/02 WD-592 8/15/03

CD-458 6/24/02 CD-612 8/22/03

8/22/03

D8.9M 4/3/02 PUBLISHED 8/2/02

78 D8D HE WD-2 Recommended Practices for Test Methods for Evaluating the Resistance Spot Welding Behavior of Automotive Sheet Steel Materials

D8.10M NEW

D8E HE WD-4 Specification for Automotive Laser Beam Welding — Butt Joint Configuration

11/14/95 WD-228 5/14/99

D8.11M NEW D8E EFM WD-6 Specification for Automotive Weld Quality, Laser Beam Welding of Manufactured Precision Components

6/24/93 SC-97-25 9/25/97

C-97-44 9/25/97

9/25/97

Document Status Report/Technical Services/10/3/2003 57

Page 58: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D8.12M NEW

D8E HE WD-3 Specification for Automotive Laser Beam Welding — Lap Joint Configuration

7/8/03 SC-97-24 9/22/97

C-97-43 9/22/97

9/22/97

Document Status Report/Technical Services/10/3/2003 58

Page 59: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D8.13 NEW

D8F HE WD-1 Recommended Practice for Automotive Aluminum Resistance Spot Weld Inspection Specification

D8.14M/D8.14 2/11/00 PUBLISHED 5/31/00

22 D8C HE DS-1 Specification for Automotive Components Weld Quality — Aluminum Arc Welding

D8.15M NEW

D8D HE WD-1 Recommended Practice for Automotive Resistance Welding Design

D8.16M NEW

D8C HE WD-1 Recommended practice for Automotive Arc Welding Design

D9.1M/D9.1 8/3/00 PUBLISHED 10/18/00

54 LPC DS-3 Sheet Metal Welding Code

D10.4 11/12/86 REAFFIRMED 4/21/92 REAFFIRMED 3/10/00

43 D10C PH WD-1 Recommended Practices for Austenitic Chromium-Nickel Stainless Steel Piping and Tubing

4/23/99

Document Status Report/Technical Services/10/3/2003 59

Page 60: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D10.6/D10.6M 2/11/00 PUBLISHED 10/15/01

20 D10K PH DS-2 Recommended Practices for Titanium Piping and Tubing, Gas Tungsten Arc Welding

D10.7M/D10.7 8/16/00 PUBLISHED 2/6/01

38 D10H PH DS-1 Guide for the Gas Shielded Arc Welding of Aluminum and Aluminum Alloy Pipe

D10.8M/D10.8 7/17/96 Refer to the FY-2004 Main Committee Ballot Goals Sheet

D10.10/D10.10M 10/20/99 PUBLISHED 2/22/00

34 D10P PH DS-1 Recommended Practices for Local Heating of Welds in Piping and Tubing

Document Status Report/Technical Services/10/3/2003 60

Page 61: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D10.11M/D10.11 1987 REAFFIRMED 4/21/92 Extension granted until  9/30/00

Refer to the FY-2004 Main Committee Ballot Goals Sheet

D10.12M/D10.12 7/20/00 PUBLISHED 10/11/00

48 D10T PH DS-3 Guide for Welding Mild Steel Pipe

D10.13/D10.13M 5/11/01 PUBLISHED 10/15/01

20 D10A PH DS-3 Recommended Practices for the Brazing of Copper Tubing and Fittings for Medical Gas Systems

D10.14 NEW

D10U PH WD-3 Recommended Practices for Multipass Orbital Machine Pipe Welding – Refining and Petrochemical

2/12/98 1/30/98

D10.15 NEW

12 D10A PH WD-1 Recommended Practices for Welding Stainless Steel Pipe and Tubing for High-Purity Services

2/12/98 8/22/96

D10.16 NEW

D10W PH WD-1 General Piping and Tubing Welding Guidelines

Document Status Report/Technical Services/10/3/2003 61

Page 62: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D10.18 NEW

D10Y PH WD-1 Guide for Welding Duplex Stainless Steel Piping and Tubing

D10.19 NEW

D10B PH WD-1 Guide for Qualification of WPSs for Toughness Tested Applications

D10.20 NEW

D10Z PH WD-1 Guide for Welding Nickel Piping and Tubing

D11.2 7/14/88 Extension granted until 4/14/99

135 EFM CD-2 Guide for Welding Iron Castings

10/6/95 CD-447 4/10/02

4/10/02

D14.1 12/8/97 Refer to the FY-2004 Committee Ballot Goals Sheet

D14.3/D14.3M 6/7/00 PUBLISHED 10/11/00

108 D14C PH DS-1 Specification for Welding Earthmoving and Construction Equipment

Document Status Report/Technical Services/10/3/2003 62

Page 63: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D14.4 11/14/97 Refer to the FY-2004 Publish Goals for New & Revised Standards

D14.5 2/21/97 Refer to the FY-2004 Committee Ballot Goals Sheet

D14.6 1/12/96 Extension granted until 4/19/03.

Refer to the FY-2004 Publish Goals for New & Revised Standards

D14.7 NEW

D14H PH Specification for Surfacing of Rolls for the Metalworking Industry

8/31/95 9/23/94

D15.1 9/17/01 PUBLISHED 4/5/02

386 D15 EFM WD-5 Railroad Welding Specification - Cars and Locomotives

Document Status Report/Technical Services/10/3/2003 63

Page 64: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D15.2 2/8/94 Extension granted until 2/7/04.

29 D15C EFM WD-2 Recommended Practices for the Welding of Rails and Related Rail Components for Use by Rail Vehicles

12/8/95 WD-259 8/25/99 WD-511 7/1/02

CD-496 1/27/02

1/27/02 DS-360 7/10/03

7/10/03 8/26/03 n/a 10/2/03

D16.1M/D16.1 New Refer to the FY-2004 Publish Goals for New & Revised Standards

D16.2/D16.2M 11/30/01 PUBLISHED 4/5/02

24 D16 PH Guide for Components of Robotic and Automatic Arc Welding Installations

D16.3M/D16.3 2/21/01 PUBLISHED 4/19/01

30 D16 PH DS-6 Risk Assessment Guide for Robotic Arc Welding

D16.4 10/14/99 PUBLISHED 2/15/00

16 D16 PH DS-2 Specification for the Qualification of Robotic Arc Welding Personnel

7/11/03 CD-422 8/10/01

8/10/01

D17.1/D17.1M 1/19/01 PUBLISHED 3/13/01

94 D17 HE WD-9 Specification for Fusion Welding of Aerospace Applications

7/8/03 CD-562 4/4/03

Document Status Report/Technical Services/10/3/2003 64

Page 65: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

D17.2 NEW

D17D HE CD-1 Specification for Resistance Welding of Aerospace Applications

2/12/98 8/22/96 WD-173 1/6/99 WD-435 5/2/01

D17.3 NEW

D17J HE Specification for Friction Stir Welding of Aluminum for Aerospace Application

11/6/00 2/14/99 WD-373 10/6/00 WD-532 9/18/02 WD-562 4/9/03

CD-405 5/2/01 CD-564 4/9/03

4/9/03

D18.1 4/14/99 Refer to the FY-2004 Main Committee Ballot Goals Sheet

D18.2 1/5/99

2 D18 PH CD-1 Guide to Weld Discoloration Levels on Inside of Austenitic Stainless Steel Tube

D18.3 NEW Refer to the FY-2004 Publish Goals for New & Revised Standards

F1.1 11/9/99 PUBLISHED 1/11/00

6 SH1 SPH CD-3 Methods for Sampling Airborne Particulates Generated by Welding and Allied Processes

9/17/03

Document Status Report/Technical Services/10/3/2003 65

Page 66: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

F1.2 5/19/99 Extension granted until 4/10/00

20 SH1 SPH DS-3 Laboratory Method for Measuring Fume Generation Rates and Total Fume Emission for Welding and Allied Processes

9/18/03

F1.3 11/18/99 PUBLISHED 1/14/00

20 SH1 SPH Guide for Evaluating Contaminants in the Welding Environment — A Sampling Strategy

F1.5M 6/4/03 PUBLISHED 8/6/03

37 SH1 SPH Methods for Sampling and Analyzing Gases from Welding and Allied Processes

F1.6 2/25/03 PUBLISHED 4/7/03

16 SPH WD-1 Guide for Estimating Welding Emissions for EPA and Ventilation Permit Reporting

3/8/01 WD-343 4/9/01 WD-497 3/18/02 WD-524 8/29/02

CD-480 10/14/02

10/14/02 DS-347 12/19/02

12/19/02 2/25/03 n/a 2/25/03

F2.2 7/3/01 PUBLISHED 9/24/01

1 SH4 SPH DS-1 Lens Shade Selector (Chart)

Document Status Report/Technical Services/10/3/2003 66

Page 67: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

F2.3M 8/3/01 PUBLISHED 10/3/01

18 SHC SPH Standard for Use and Performance of Transparent Welding Curtains and Screens

F3.2M/F3.2 6/15/01 PUBLISHED 9/17/01

42 SH1 SPH DS-1 Ventilation Guide for Weld Fume

F4.1 11/9/99 PUBLISHED 1/11/00

5 SH4 SPH DS-1 Recommended Safe Practices for the Preparation for Welding and Cutting of Containers That Have Held Hazardous Substances

9/22/03

G1.1 NEW

G1C EFM WD-11 Guide to Ultrasonic Assembly of Thermoplastics

10/6/95 4/10/99 WD-318 3/20/00 WD-464 11/30/01

CD-429 11/30/01

11/30/01

G1.2 8/31/99 PUBLISHED 11/15/99

28 G1 EFM Specification for Standardized Ultrasonic Welding Test Specimen for Thermoplastics

G1.3 NEW

G1B EFM WD-1 Guide for Vibrational Welding

Document Status Report/Technical Services/10/3/2003 67

Page 68: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

G1.4 NEW

G1B EFM WD-2 Specification for Standardized Vibrational Welding Test Specimen for Thermoplastics

G1.5 NEW

G1A EFM WD-2 Hot Gas and Heated Tool Butt Thermoplastics Welder Examination — Part 2

G1.6 NEW Refer to FY-2004 Publish Goals for New & Revised Standards

G1.8 NEW

G1A EFM WD2 Specification for Qualification of Plastics Welder Test Facilities

3/15/99 4//10/99

G1.9 NEW

G1A EFM WD2 Specification for the Qualification of Plastics Welding Educators

3/15/99 4/10/99

Document Status Report/Technical Services/10/3/2003 68

Page 69: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

G1.10M 2/21/01 PUBLISHED 6/11/01

44 G1A EFM FDS-1 Guide for the Evaluation of Hot Gas, Hot Gas Extrusion, and Heated Tool Butt Thermoplastic Welds

G2.1M/G2.1 9/9/02 PUBLISHED 2/12/03 Refer to FY-2004 Publish Goals for New & Revised Standards

G2.3M/G2.3 NEW

G2E EFM WD-4 Recommended Practices for the Joining of Wrought  Austenitic Stainless Steel Sheet and Plate

7/16/03 4/10/99

G2.4 NEW

G2D EFM WD-3 Guide for the Fusion Joining of Titanium and Titanium Alloy

G2.5 NEW

G2D EFM Guide to Titanium Weld Color Inspection

AWN 1979

40 SPH Arc Welding and Cutting Noise

Document Status Report/Technical Services/10/3/2003 69

Page 70: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

AWS 1999

9 SPH Arc Welding Safely

AWS-S 1988

9 SPH Arc Welding Safely — Spanish

BRH 1991 Refer to the FY-2004 Publish Goals for New & Revised Standards

BRS 4 SPH Braze Safely

CAWF 62 SPH Characterization of Arc

EWH, I-X PUBLISHED 1/6/99

701 SPH Effects of Welding on Health, Index--I through X

EWH, XI PUBLISHED 4/13/01

80 SPH Effects of Welding on Health, XI

EWH, XII NEW

Refer to FY-2004 Publish Goals for New & Revised Standards

Document Status Report/Technical Services/10/3/2003 70

Page 71: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

FSW 1992

18 SPH Fire Safety in Welding and Cutting

IFS 72 LPC International Index of Welding Filler Metal Classifications

n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a

LVOS 52 SPH Lab Validation of Ozone Sampling with Spill Proof Impingers

OWS 10 SPH Oxyfuel Gas Welding, Cutting, and Heating Safety

PCWC:2001 PUBLISHED 10/15/01

12 SPH 2 Preparing Containers for Welding or Cutting

SHB 2000 PUBLISHED 4/5/00

550 C3B CLJ  Soldering Handbook, 3rd Edition

N/A N/A

SHF 1998

56 SPH Safety and Health Fact Sheets (Second Edition)

Document Status Report/Technical Services/10/3/2003 71

Page 72: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents, ANSI Approval Dates, & Published Dates

Page Count

C. Code

Eng. Draft # Document Title PINS Sent Permission to Prepare

SC Ballot # Closing Date

C Ballot # Closing Date

Last C Ballot Closing Date

TAC Ballot # Closing Date

Last TAC Ballot Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

TSH 1985

196 C2D EFM 3 C2 - TSH Thermal Spraying Practice, Theory and Application

n/a C-95-29 10/12/95

10/12/95 n/a n/a n/a n/a n/a

ULR 1976

96 SPH Ultraviolet Reflectance of Paint

Document Status Report/Technical Services/10/3/2003 72

Page 73: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents & ANSI Approval Dates

Page Count

C. Code

Document Title SC Ballot # Closing Date

C Ballot # Closing Date

TAC Ballot # Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

C1.2 1953 WITHDRAWN

36 C1 Recommended Practices for Spot Welding Aluminum and Aluminum Alloys

C1.3 1970 WITHDRAWN

17 C1 Recommended Practices for Resistance Welding Coated Low-Carbon Steels

D14.2 6/11/93 WITHDRAWN 8/20/99

31 D14D Specification for Metal Cutting Machine Tool Weldments

F1.4 3/13/97 WITHDRAWN 9/27/01

19 SH1 Method for Analysis of Airborne Particulates Generated by Welding and Allied Processes

F2.1 11/7/77 WITHDRAWN

14 Recommended Safe Practices for Electron Beam Welding and Cutting

Document Status Report 10/3/03

Withdrawn Documents

Document Status Report/Technical Services/10/3/2003 73

Page 74: Technical Activities Committee Document Status Report · PDF file10 C3 CLJ WD-1 Recommended Practices for Ultrasonic Inspection ... 75 C4D HE DS-1 Recommended Practice for Heat Shaping

Exhibit 4.1Technical Activities Committee

Documents & ANSI Approval Dates

Page Count

C. Code

Document Title SC Ballot # Closing Date

C Ballot # Closing Date

TAC Ballot # Closing Date

Public Review Expiration Date

STANC Ballot # Closing Date

BSR 9 Sent

Document Status Report 10/3/03

Withdrawn Documents

F6.1 1978 WITHDRAWN

12 Method for Sound Level Measurement of Manual Arc Welding and Cutting Processes

Document Status Report/Technical Services/10/3/2003 74


Recommended