+ All Categories
Home > Documents > Tech.scre Formet

Tech.scre Formet

Date post: 06-Apr-2018
Category:
Upload: shyam-raj-jilla
View: 219 times
Download: 0 times
Share this document with a friend

of 192

Transcript
  • 8/3/2019 Tech.scre Formet

    1/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    2/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    3/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    4/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :1. Slum map2. Socio-economic details3. Ownership details4. Certificate by competent authority5. Details of court litigation if any6. Date relating to infrastructure7. Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    5/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    6/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    7/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    8/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :1. Slum map2. Socio-economic details3. Ownership details4. Certificate by competent authority5. Details of court litigation if any6. Date relating to infrastructure7. Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    9/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    10/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    11/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    12/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :8. Slum map9. Socio-economic details10.Ownership details11.Certificate by competent authority12.Details of court litigation if any13.Date relating to infrastructure14.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    13/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    14/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    15/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    16/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :8. Slum map9. Socio-economic details10.Ownership details11.Certificate by competent authority12.Details of court litigation if any13.Date relating to infrastructure14.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    17/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    18/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    19/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    20/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :15.Slum map16.Socio-economic details17.Ownership details18.Certificate by competent authority19.Details of court litigation if any20.Date relating to infrastructure21.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    21/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    22/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    23/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    24/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :15.Slum map16.Socio-economic details17.Ownership details18.Certificate by competent authority19.Details of court litigation if any20.Date relating to infrastructure21.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    25/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    26/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    27/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    28/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :22.Slum map23.Socio-economic details24.Ownership details25.Certificate by competent authority26.Details of court litigation if any27.Date relating to infrastructure28.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    29/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    30/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    31/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    32/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :22.Slum map23.Socio-economic details24.Ownership details25.Certificate by competent authority26.Details of court litigation if any27.Date relating to infrastructure28.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    33/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    34/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    35/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    36/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :29.Slum map30.Socio-economic details31.Ownership details32.Certificate by competent authority33.Details of court litigation if any34.Date relating to infrastructure35.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    37/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    38/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    39/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    40/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :29.Slum map30.Socio-economic details31.Ownership details32.Certificate by competent authority33.Details of court litigation if any34.Date relating to infrastructure35.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    41/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    42/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    43/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    44/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :36.Slum map37.Socio-economic details38.Ownership details39.Certificate by competent authority40.Details of court litigation if any41.Date relating to infrastructure42.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    45/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    46/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    47/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    48/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :36.Slum map37.Socio-economic details38.Ownership details39.Certificate by competent authority40.Details of court litigation if any41.Date relating to infrastructure42.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    49/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    50/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    51/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    52/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :43.Slum map44.Socio-economic details45.Ownership details46.Certificate by competent authority47.Details of court litigation if any48.Date relating to infrastructure49.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    53/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    54/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    55/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    56/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :43.Slum map44.Socio-economic details45.Ownership details46.Certificate by competent authority47.Details of court litigation if any48.Date relating to infrastructure49.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    57/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    58/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    59/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    60/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :50.Slum map51.Socio-economic details52.Ownership details53.Certificate by competent authority54.Details of court litigation if any55.Date relating to infrastructure56.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    61/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    62/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    63/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    64/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :50.Slum map51.Socio-economic details52.Ownership details53.Certificate by competent authority54.Details of court litigation if any55.Date relating to infrastructure56.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    65/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    66/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    67/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    68/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :57.Slum map58.Socio-economic details59.Ownership details60.Certificate by competent authority61.Details of court litigation if any62.Date relating to infrastructure63.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    69/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    70/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    71/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    72/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :57.Slum map58.Socio-economic details59.Ownership details60.Certificate by competent authority61.Details of court litigation if any62.Date relating to infrastructure63.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    73/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    74/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    75/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    76/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :64.Slum map65.Socio-economic details66.Ownership details67.Certificate by competent authority68.Details of court litigation if any69.Date relating to infrastructure70.Abstract of HH survey report

    Town Project Officer Town Planning Officer Municipal Engineer

    Municipal Commissioner

  • 8/3/2019 Tech.scre Formet

    77/192

    Annexure IITechnical Screening of Non Notified Slums

    (This form is to be completed for every slum an signed by Town Project Officer, Town PlanningOfficer, Municipal Engineer and Municipal Commissioner).

    Name of the Municipality

    Name of the SlumA. General

    1. Ward Number

    2. Area in Hectares

    3. Boundaries of Slum

    (indicate house numbers,

    names of lanes or

    localities abutting the

    slum)

    North

    South

    East

    West

    4. Population (As per HH

    survey-2003)5. No. of Houses

    6. No. of Households

    7. BPL population

    8. SC & ST populationSC ST

    9. Slum map at scale of

    1:600 Enclosed / Not Enclosed

    B. Land Tenure

    1. Specify ownership of

    the land in which slum islocated

    Government Land Railway Land

    Municipal Land Other semi Govt.

    Waqf Land Private Land

    Endowment Land Other (specify)

    2. Ownership of individual

    household in the slumNo. of HHs

    Pattas

    Possession Certificates

    Ownership documents

    No Ownership

    Total

  • 8/3/2019 Tech.scre Formet

    78/192

    3. Necessary Certificate that

    slum not slated for

    clearance for the next 10

    years enclosed (in case ofgovt./quasi govt. lands

    without pattas)

    Competent Authority Yes No

    1.

    2.

    3.

    4. Is there any court

    litigation?

    5. If yes, indicate the status Name of the court :

    File No :

    Injunction order / status quo/under trial

    6. Can land issues be

    resolved to allow provision

    of infrastructure (if yes,

    explain briefly)

    Yes No

    7. If so, what is the time

    frame?

    C. Environmental

    Conditions

    Is the slum :

    Yes

    No

    1. Located on or any other

    environmentally sensitive

    area? Indicate Yes / No

    Tank bed, embankment

    River embankment

    Riverbed

    Canal

    Nala

    Other (specify)

    2. Located on places of

    public interest? Indicate Yes/ No

    Road Margins

    Proposed master plan roads

    Layout open spaces

    Other (specify)

  • 8/3/2019 Tech.scre Formet

    79/192

    3. Located on hazardous

    areas? Indicate Yes / No (If

    yes, describe pollution and

    mention source)

    Steep hill side

    Marshy land

    Industrial pollution

    D. Infrastructure

    Conditions

    No. of HHs

    1. Source of Water

    Supply

    Individual Tap

    Group Tap

    Public Tap

    Tankers (municipality and private)

    Borewell

    Open Well

    Others

    2. Water Supply Length of existing distribution lines

    Length of required distribution lines

    No. of HHs not covered by piped water supply

    % of HHs not covered by piped water supply

    3. Water supply per day

    in hours

    4. Distance to the off-site

    water supply

    5. Drains Length of existing pucca drains

    Length of required pucca drains

    No. of HHs not covered by pucca drains

    % of HHs not covered by pucca drains

    6. Distance to the

    disposal drain (in metres)

  • 8/3/2019 Tech.scre Formet

    80/192

    7. Frequency of flooding

    per year

    8. Roads Length of existing pucca roads

    Length of required pucca roads

    No. of HHs not covered by pucca roads

    % of HHs not covered by pucca roads

    9. Street Lights No. of existing street lights

    No. of required street lights

    No. of HHs not covered by street lights

    % of HHs not covered by street lights

    10. Is there a proper

    drainage outfall point

    from the slum?

    Yes No

    It is hereby certified that the ----------------------- Locality is eligible for notification asslum. The slum is free from tenure problems, not located on environmentallyobjectionable area and has poor and vulnerable people and it has infrastructuredeficiency. In view of this it is feasible to take up the environmental infrastructureworks and other improvements is the slum.E

    nclosures :64.Slum map65.Socio-economic details66.Ownership details67.Certificate by competent authority68.Details of court litigation if any69.Date relating to infrastructure70.Abstract of HH survey report

    Town


Recommended