Test as We Fight Dennis O’Donoghue Vice President, Boeing Test & Evaluation NDIA T&E Conference March 13, 2012
Transcript

Test as We Fight Dennis O’Donoghue Vice President, Boeing Test & Evaluation NDIA T&E Conference March 13, 2012

Engineering, Operations & Technology | Boeing Test & Evaluation

Patterns of Complexity

N=4 L=6 P=64

Define Requirements

Approve EWA

Fund EWA

Execute EWA

Documented Process

Define Requirements

Approve EWA

Fund EWA

Execute EWA

Emergent Pattern Dominant Process

Engineering, Operations & Technology | Boeing Test & Evaluation

Nodes Links Possible Patterns

Patterns of Complexity

L=N(N-1)/2 P=2^L

N=4 L=6 P=64

N=10 L=45 P=3.5 Trillion

N=12 L=66 P=4,700 Quadrillion

Engineering, Operations & Technology | Boeing Test & Evaluation

Flight Test Operations Network

EWA Approver

TestDocumenter

Test Sequencer

Tester

FlightPlanner

DetailedTest Planner

Dispatcher

ConfigurationRequirements

Collector/Sorter

List of ProposedWork (with

identified internalpriorities)

TIS (2)

MxRequirements Collector/

Sorter

WorkPackage

Consolidator/Prioritizer

Instrumentation

Calibrator

Weight andBalance

Requirements

Collector

Instrumentation

Requirements Collector/

Sorter

List of CalibratedParts Complete,Cal Sched, datelist, Sig CND &

Xducer Cal

List of proposedwork (with priority)0

List of ProposedWork (Inst)

List ofproposedwork (with

priority)

WorkPackageSender 1

Work PackageCapacity

Reviewer/Validator

ConfigurationGatekeeper

Consolidated list of proposed workpackage with relative prioritiesidentified (includes required &

optional work)Capacity ApprovedWork Package &

Schedule

Approved Configuration - Workpackage meets program

requirements for flight dataintegrity

ScheduleMx PlanSupplier

A/P Receiver 0

WorkAssigner /Receiver

WorkPerformer 1

WorkValidator 0

ProblemIdentifier 0

AirplaneProblemResolver

FlightRelease

Signers 0

Solution

ProblemDescription

CommunicateIssues

Verify CompleteWork Package

Assign work

Check Work

Status 0

A/P Time ofReturn 0

Test Conduct: Responsible for planning, defining,authorizing, and performing all testing on the airplane.

Airplane Transition: Responsible for planning, defining, andauthorizing all daily non-test work to be done on the test

airplane, other than testing.

Maintenance, Configuration & Preflight: Responsible for perform work on the test airplane, including supporting testing when req

FP3 DesignatedProblem

Interfacer, Ifproblem affectswork package

content orschedule

Feed back

StatusVisualizer 0

Feed back 0

ProblemDescription

Executable WorkPackage 1

List of schedule info andall requirements for paper,

parts, and tools

Validated list of theavailability/ status of all

required paper, parts, andtools

Request Status(paper, parts &

tools) or EstimateInfo

FP2Designated

ProblemInterfacer

Request for more labor ifwork package exceeds

current capacity

Feedback (If yes,continue, if no, request

change)

"Outside"Other work

sourcesupplier

(mayincludeTOC)

ADs, etc.

Red LabelUpdates, etc. 2

OperationalCommunicator

FlightScheduler

FlightResourceAssigner

TIP (1)

Schedules

TIRL

RIP

TIP

TIS

Modules/Blocks

Sequence

Sequence(0)

TIS (0)

CrewAssignment

Flight Info

OperationalInfo

Test Status

TIS (1)Airplane Status,

Global Summary,Diary, Hotline, Data,

Reports

Airplane Status &Squawks (log book)

Schedules(0)

Schedule(1)

Schedules(3)

ContingencyPlanning (2)

TIPFeedback

Sequence Feedback,Conditions, Test

Participants

SequenceFeedback

ContingencyPlanning (3)

ContingencyPlanning (4)

Airplane Status,Global Summary,

Diary, Hotline,Data, Reports

Feedback

Test StatusFeedback

A/PSelection

TIPFeedback(0)

Test Scheduler

Status (1)

Status (2)

Airplane

Staller

FC Releaser

Released FC

Notice ofPlanningAvailable

Approved IPs,SOIs, NCOs

FTE Diary/ FTEASummary / PL&D /

Data

Test ConditionCompletion, Flight

Ground Hours (test log),Flight Log

Flight InfoFeedback

SchedulingQuestions

Details ofissues/problem

Operational InfoFeedback

Regulator(FAA/EASA/B

DCO )

Test Plan,Issue,

Papers, SAC TIA, SAC,Feedback

Cert Report /Data

ApprovedReport / Data

WeatherForecaster

WeatherRequirements

WeatherRequirements 1

Forecast 1

Forecast 2

Problem Resolution Owner

MxProblem

ResolutionOwner

Problem details(assignment of

problem or issue)

Controller

ServiceRequest

ClarifyingQuestions(checklist)

DesignatedProblem

Interfacer -From FPTeams

FleetOptimizati

onAnalyzer

TechnicalSupport

Problem Details &Action Items

ProblemDiscussion 1

Request MoreDetails

Authorization toExecute Solution

ClarifyingAnswers

Continual Status (untilresolution is selected and

implemented)

Details

Data Places

Problem 0

Solution

Request MoreDetails 1

Details 0

ProblemSolution Options

ProblemDiscussion

AirplaneProgramPlanner

Value Network Map - This is a WORK in PROGRESS.

Purpose: Our purpose is to continually generate optimal aircraft test excellence and efficiency through a trusted visible network thatdelivers integrated fleet testing, updates virtual real-time status, provides a single portal for problem resolution through the TOC, and

facilitates interactive communications and collaboration.*

FleetReadiness

Coordinator

DataVisualizer

Program TestPlans &

Schedules

Data

Test ReadinessIssues

PotentialImpacts

SolutionOptions (0)

Data UpdateAnalysis

SolutionStatus

A/P release andlogbook

EngrProblem

ResolutionOwner

SolutionOptions

Schedule 1CrewAvailability

Released EWA,Test Desc.

ReleasedFC 0

ALPS Liason

FOT&VALPS

Inputter

CertComplianceNegotiatorProblem

Owner(Pgm)

ProblemDefinition

ResolutionPlan

Delta to CertPlan

Non-Compliance

Daily ALPSReport

RequestAdditionalTesting Test

Questions

Answers

Agreement withBackup Plan

Decision

Test ResultsProblem

Interfacer

TestSupportPlanner

EWA Author

TOL/ ADVReviewer /Approver

CriticalPath

Manager

Financer

EWA Reviewer

Program Interface: Responsible for interfacing with the Proga define, manage and authorize the work statement to be perfor

Test GrowthRqmt

ReleasedTOL

Draft EWA

Oppor &Risk

Special TestHardware/Facilities

Rqmts

ReleasedTOL (0)

ReleasedTOL (1)

Charge Line

Request for CustApproval

Cert PlanAuthor

Cert PlanReviewer /

Focal

FT SpecAuthor

DRO Logger

ConformityRequirements

Approver

MOCQuestion

Cert Plan

MOCAnswers

TestApproval

ConformityRqmts

Approved CertPlan 0

FT Spec

ConformityRequirements

DRO Log#

Cert Rqmts

Prelim EWAInfo

ConformityRequirements &

Approval

TestSchedule

Priorities

Test PartsSparesOrder

Approver

PartsRequester

(ME)

Parts Orderer

Supplier (inclPart Maker)

Parts On DockDates

Released PartsRequest

Request forParts

ScheduleInfoPO

Parts

Clean EWA

Clarification

Concerns,Scope,

Justification

R/B Label PRR LTPRStandby Stock Req.

IDAS Input

EquipmentMgr

Contract Writer

Auth. to ChargeProgram

Contract

Test ProgramRestrictions

MaintenancePlan Rqmt

ProgramSchedule

Rqmts

EWA Info /Test Input

CriticalChain

Information

Prioritization

SchedQuestions

Revised/ReleasedEWA

TCR

FP2

FP3

FP1

FP0

WorkInstruction

Provider

.

ResourceReservation

Maker

ReleaseNotification

ServiceEngr SBReleaser

SB Release

AD/TaskCards/SB

NCR/NCOWorksheet & Other

FTWS

Worksheet

©©

©

©

©

©

©

©

©

©

©

Work pkg as definedcannot be completed (time

allotted or kit conflict)

Rev 20071130

AnalysisTeam

Leader

Operations TeamLeader

ProgramStructures

TeamLeader

ProgramSystems

TeamLeader

InstrumentationTeam

Leader

AnalysisSMEs

Operations SMEs

InstrumentationSMEs

SystemsSMEs

Structures SMEs

5thFloor

InstrumentationDesigner (May

be anothernetwork)

Test ProgramRequirements

LoggedTIA

ApprovedTIA

Released EWA,Test Desc. (1)

EWA Information/ Test Input

Prelim EWAInformation / Tech

Support

ApprovedTIA 0

Ext External to FOTV

Work PkgDefers after

Normal Cycle

Request TestChange

Test ChangeResponse

DiscreteWork ItemEstimator

RequirementsCoordinator

Coord for Tool /Equip Reservation

Coord for Tool /Equip Reservation 0

Coord for Tool /Equip Reservation 1

FP0Designated

ProblemInterfacer

Problem Details forTOC to engage Global

Partners

Flight Plan

Flight Plan 0

FAA FlightController

Part Rqmts

Part NeedRequest

WorkPackageScheduleAnalyzer

CoordinatedSchedule

InfoCapacityInfo

Balast & FuelRqmts

©

Part &ComponentTransporter

ResolutionInfo

Unresolvable Kit /Resource Conflict

SafetyCoordinat

or

CDC / AOG / Factory Coordin

ator

Kit Receiver 0

All elementsrequired to

accomplish work

People / Resource toaccomplish the work

Coordinatealternatives for Kit

Issues

Alternatives Identifiedto address kit issues

Part AvailabilityStatus

Logged TIA

Request forStatus

Part Availabililty /Schedule

Information 0

Work ItemRequirements

Work ItemRequirements

Status (parts, plans &tools) or Estimate info

Status of Parts,plans, tools or

Estimate

Request SpecialWork Need Info

Special WorkNeeds Identified

UndocumentedRequirements

Information

Flight LogData

Enterer

Flight LogInformation

Kit & PartStager

Required WorkComponents

Missing KitComponent

(Reservation)

Data Place (IP,SOI, FC, R/L

Rqmts, FTWS,NCO, Task

Cards)

CrewPlan

QA SME

MX SME

Data Sys / InstrSqawks

SB Release

ProgramEngineering

Test RequirementData

TIS

TIS Request forEngr Support

S/B Release

TIRL

Schedule

Schedule

Operational Info -Airplane Landing

Communicationwhile remote (ETA)

Early look at squawks(airplane statussquawks, etc) 0

TestStatus

Feedback0

Test StatusFeedback 0 0

Test StatusFeedback 0 0 0

Communication of problems gettingwork package completed (includingP/Us, SQUAWK, etc.) Details of any

potential Delta to Work Package

Communication of problems gettingwork package completed (includingA/P PU's, SQIAWK, etc.) Details ofany potential delta to work package

Plans toaddresschanges

Plans toaddresschanges

Plans to addresschanges

Work Packages Changes/ Deltas after Initial

Approved WP

Work Packages Changes/ Deltas (after Initial

Approved WP)

Work Packages Changes/ Deltas (after Initial

Approved WP)

Shift Manager

Decision /Direction

Chief TestPilot

Issue Info for Resolution &Communication of changes

to a/p work package

Issue Info forResolution

Visibility

Visibility

FC Author

Perlim EWAInformation

TOL / ADVAuthor

Prelim EWAInformation (2)

ReleasedEWA (1)

ReleasedEWA (2)

DraftFC

Draft TOL

Test PartsRequirement

A/PCommunications

(ETA, etc.)

FP2.5

Parts and Tools: Responsible for ensuring the availability anddelivery of parts, tools and resources to support completion of the

identified test work package .

Part / Kit AvailabililtyStatus / Schedule

Information 3

HardBallast

Provider/Initiator 0

RVI/NDIProvider 0

Sealer /Composite

RepairProvider 0

MRSAProvider/Ini

tiator 0

Tool RoomCribs Tool

Provider/Initiator 0

Red LabelAdministrat

or 0

Kit / PartsProvider/Initiator (EFP,FTS, PCA)

GSEProvider 0

SpecialTools

Provider 0

VendorReps

Parts/PaperProvider/Ini

tiator 0

Part Requirement/ Kit Request

ShippingProvider 0

ExportControl

Coordinator0

ECCN #s 0

ECCN #'sRequest 0

ECCN Paper/Parts 0

MRSA PartsRequest 0

SupplyChain

Analyzer 0

PartsProvider

(Stores/SWControl

Library 0

PartRequest 0

Part Demand /Status

PurchaseOrder

Parts Reqst0

Vendor 0

RequestAssistance 0

Assistance 0

Tool Holder 0

ToolsRequest 0 Tools 0

PartsRequest

Coord PartPickup

Coord PartPickup

PartsDelivered

PartsDelivered

Parts & Equipmentto be Transported

FieldCoordinator

0

MaintRequest

MaintainedGSE

ToolRequest 1

Tools 1

Test Operations Center: Responsible for fleet-level test program managemvisibility and metrics and managing non-local problem resolution.

ReleasedEWA

©

Released FC

ScheduleChanges

Request PPTStatus or Estiimate

Status of Fueland Ballast

Summaries of PlannedWork Package (for next

day+)

PPT Status

Daily TestStatus

StatusRequest

Status Info

Part Demand /Status

Part Status

Kit / Equipment /Part Requirements

TestSchedule

DST

A/P Test DataSystem Status

A/P ReleaseStatus

A/P in Stall

A/P in Stall

MaintenanceBriefing to Pilots

Airplane

A/P Status(ETA, etc.)

WeightManifest

Status

Parts on DockDates

ReleasedEngineering

ITPR

©

Status /Info

RequirementInfo

Availabilityinfo

RequirementInfo Availability

info

RequirementInfo

Availabilityinfo

RequirementInfo Requirement

Info

Availabilityinfo

Availabilityinfo

RequirementInfo

Availabilityinfo

Tools to beTransported / Kitted

Ballast to beTransported GSE to be

Transported

TIS

Work NeedsDelivered to Work

Location

Pull Data forCharts

ElevatedIssue

ReleasedTOL

Request Status(PPT)

ReservedComponents to be

moved

ReleasedEWA

Final Cert Plan(Proposed)

Approved CertPlan

TOLRequirement

ReleasedFC

FC Enteredinto TICS

RIP Info inTIRL

Request forEstimate

Estimates

EstimateInformation

TIS (to TOC)- Next daytesting info

ScheduleCreator

PreliminarySchedule Info

ScheduleInfo

Executable WorkPackage

ScheduleInfo

Propulsion TeamLeader

Regulator

Visibility

Visibility

Solution

Notification ofSolution

Solution to beImplemented (from

TOC)

Solution to beImplemented (from

TOC)

FlightPlan

EngineeringData

FTIR

AirplaneLanding

Task Cards

Liaison

Feedback

Missing KitComponent (Part)

Emergent Kit /Resource Solution

Cert PlanRequirement

ReleasedFC 1

TCR / ConfigRqmts

Request forApproval

EmergentApproved EWA

CR

Config Info

Config Info 0

SMEConsultation

SMEConsultation 0

Solution to beImplemented

ConformityCoordinator

Updatet TCRConformityComplete

FAA Pickup

Rqmts forshop assistif required

Request forConformityInspection

ConformityInspector

InspectionResults

ConformityPackage

ConformanceStatement(8130-10)

Official ConformityRelease (8100-1)

ReleasedTOL 0

ReleasedTOL 1

QualityRecords

(QAR)Inputter

All Squawks

Verify CompleteWork Package

TIPS

SolutionOptions 0

FleetImpacts 0

FleetImpacts

Status MetricsVisibility

ChangeManagement

Process(metrics/vis)

Decision onSchedule Change

MeasurementPreflt Results

Problem /EngineeringSquawks 0

ReleasedTOL 2

Notification ofIssues

QAR Data

MRBDispositio

ner

NCR (EPD)Discovered at A/P

All Pickups

MeasurementPreflight Results

Non Inst MRBDisposition

MRBVisibility

InstrumentationMRB Disposition

Input Adams RIPDatabases

MeasurementPreflight Status

Decision to go toBackup Plan

TestSchedules

FTWS /PFTWS

PartsRequirements

ConfigurationPlanner

ReleasedEWA

Outside WorkRequirements

Supplier

Production Changes& Extended NCRs

Prelim EWAInformation

TIRL 0

TCR 0

Test LogisticsCoordination

Test LogisticsCoordination 0

TCR / TIPFeedback

TCR / TIPFeedback 0

Test LogisticsCoodination 2

Test LogisticsCoordination 1

Modules &Blocks

TestSchedules 0

ConfigStatus

Instrumentation Planner

TestSchedule 0

Inst Status

Inst Status 0

FTIRClarification

ContingencyPlanning

ContingencyPlanning 0

Contingency

PFTWS

List of Calib PartRqmts, Sig CND &

Xducer Calid

InstrumentationParts Request (IPR)

InstrumentationDesing Rqmts

Package

PFTWS 0

Detailed System /General Info Flow

Detailed System /General Info Flow 0

Task CardDWI

Non-Inst MRBTag

DWI EstimateIssues

DWI EstimateIssues 0

DWI EstimateAssistance

DWI EstimateAssistance 0

DWI & Dates

DWI &Dates 1

FTIR

WP CapacityIssues

FTTIR Part 1

DWI Data &Dates

DWI Data &Dates 0

FC

TCR 1

WeightManifest

ReleaseForms

FC 0

A/P ReadinessIssues

CompletedFT-TIR

Sequence 1

Issue Info forResolution

SequenceFeedback1

TIPQuestions

TIP Answers

+

+

+

+

+

+

+

Engineering, Operations & Technology | Boeing Test & Evaluation

BT&E Organization – The Visible Structure

Test Operations

Operational Support

Functional Excellence

Vice President Boeing Test & Evaluation Dennis O’Donoghue

Finance Rick Fichera

IT Business Partner Michael Stothers

Business Integration Bill Gardner

Vice President Flight Test Operations

Barb Cosgrove

Flight Operations Chuck Killberg

Test Support Operations Pete Lohr

Communications Sandy Angers

Human Resources

Susan Abbott

Ethics Dave

Young

Legal Amy Reinhart

Gaffney

Safety Suzanne

Riney

Vice President Laboratory Test Operations

Marshall Short

Test Programs Management

Sandra Gianotas

Quality Larry

Olguin

EO&T Chief Engineer Mark Burgess

Employee Recognition Linda Topp

Engineering, Operations & Technology | Boeing Test & Evaluation

Flight Test Operations Network

EWA Approver

TestDocumenter

Test Sequencer

Tester

FlightPlanner

DetailedTest Planner

Dispatcher

ConfigurationRequirements

Collector/Sorter

List of ProposedWork (with

identified internalpriorities)

TIS (2)

MxRequirements Collector/

Sorter

WorkPackage

Consolidator/Prioritizer

Instrumentation

Calibrator

Weight andBalance

Requirements

Collector

Instrumentation

Requirements Collector/

Sorter

List of CalibratedParts Complete,Cal Sched, datelist, Sig CND &

Xducer Cal

List of proposedwork (with priority)0

List of ProposedWork (Inst)

List ofproposedwork (with

priority)

WorkPackageSender 1

Work PackageCapacity

Reviewer/Validator

ConfigurationGatekeeper

Consolidated list of proposed workpackage with relative prioritiesidentified (includes required &

optional work)Capacity ApprovedWork Package &

Schedule

Approved Configuration - Workpackage meets program

requirements for flight dataintegrity

ScheduleMx PlanSupplier

A/P Receiver 0

WorkAssigner /Receiver

WorkPerformer 1

WorkValidator 0

ProblemIdentifier 0

AirplaneProblemResolver

FlightRelease

Signers 0

Solution

ProblemDescription

CommunicateIssues

Verify CompleteWork Package

Assign work

Check Work

Status 0

A/P Time ofReturn 0

Test Conduct: Responsible for planning, defining,authorizing, and performing all testing on the airplane.

Airplane Transition: Responsible for planning, defining, andauthorizing all daily non-test work to be done on the test

airplane, other than testing.

Maintenance, Configuration & Preflight: Responsible for perform work on the test airplane, including supporting testing when req

FP3 DesignatedProblem

Interfacer, Ifproblem affectswork package

content orschedule

Feed back

StatusVisualizer 0

Feed back 0

ProblemDescription

Executable WorkPackage 1

List of schedule info andall requirements for paper,

parts, and tools

Validated list of theavailability/ status of all

required paper, parts, andtools

Request Status(paper, parts &

tools) or EstimateInfo

FP2Designated

ProblemInterfacer

Request for more labor ifwork package exceeds

current capacity

Feedback (If yes,continue, if no, request

change)

"Outside"Other work

sourcesupplier

(mayincludeTOC)

ADs, etc.

Red LabelUpdates, etc. 2

OperationalCommunicator

FlightScheduler

FlightResourceAssigner

TIP (1)

Schedules

TIRL

RIP

TIP

TIS

Modules/Blocks

Sequence

Sequence(0)

TIS (0)

CrewAssignment

Flight Info

OperationalInfo

Test Status

TIS (1)Airplane Status,

Global Summary,Diary, Hotline, Data,

Reports

Airplane Status &Squawks (log book)

Schedules(0)

Schedule(1)

Schedules(3)

ContingencyPlanning (2)

TIPFeedback

Sequence Feedback,Conditions, Test

Participants

SequenceFeedback

ContingencyPlanning (3)

ContingencyPlanning (4)

Airplane Status,Global Summary,

Diary, Hotline,Data, Reports

Feedback

Test StatusFeedback

A/PSelection

TIPFeedback(0)

Test Scheduler

Status (1)

Status (2)

Airplane

Staller

FC Releaser

Released FC

Notice ofPlanningAvailable

Approved IPs,SOIs, NCOs

FTE Diary/ FTEASummary / PL&D /

Data

Test ConditionCompletion, Flight

Ground Hours (test log),Flight Log

Flight InfoFeedback

SchedulingQuestions

Details ofissues/problem

Operational InfoFeedback

Regulator(FAA/EASA/B

DCO )

Test Plan,Issue,

Papers, SAC TIA, SAC,Feedback

Cert Report /Data

ApprovedReport / Data

WeatherForecaster

WeatherRequirements

WeatherRequirements 1

Forecast 1

Forecast 2

Problem Resolution Owner

MxProblem

ResolutionOwner

Problem details(assignment of

problem or issue)

Controller

ServiceRequest

ClarifyingQuestions(checklist)

DesignatedProblem

Interfacer -From FPTeams

FleetOptimizati

onAnalyzer

TechnicalSupport

Problem Details &Action Items

ProblemDiscussion 1

Request MoreDetails

Authorization toExecute Solution

ClarifyingAnswers

Continual Status (untilresolution is selected and

implemented)

Details

Data Places

Problem 0

Solution

Request MoreDetails 1

Details 0

ProblemSolution Options

ProblemDiscussion

AirplaneProgramPlanner

Value Network Map - This is a WORK in PROGRESS.

Purpose: Our purpose is to continually generate optimal aircraft test excellence and efficiency through a trusted visible network thatdelivers integrated fleet testing, updates virtual real-time status, provides a single portal for problem resolution through the TOC, and

facilitates interactive communications and collaboration.*

FleetReadiness

Coordinator

DataVisualizer

Program TestPlans &

Schedules

Data

Test ReadinessIssues

PotentialImpacts

SolutionOptions (0)

Data UpdateAnalysis

SolutionStatus

A/P release andlogbook

EngrProblem

ResolutionOwner

SolutionOptions

Schedule 1CrewAvailability

Released EWA,Test Desc.

ReleasedFC 0

ALPS Liason

FOT&VALPS

Inputter

CertComplianceNegotiatorProblem

Owner(Pgm)

ProblemDefinition

ResolutionPlan

Delta to CertPlan

Non-Compliance

Daily ALPSReport

RequestAdditionalTesting Test

Questions

Answers

Agreement withBackup Plan

Decision

Test ResultsProblem

Interfacer

TestSupportPlanner

EWA Author

TOL/ ADVReviewer /Approver

CriticalPath

Manager

Financer

EWA Reviewer

Program Interface: Responsible for interfacing with the Proga define, manage and authorize the work statement to be perfor

Test GrowthRqmt

ReleasedTOL

Draft EWA

Oppor &Risk

Special TestHardware/Facilities

Rqmts

ReleasedTOL (0)

ReleasedTOL (1)

Charge Line

Request for CustApproval

Cert PlanAuthor

Cert PlanReviewer /

Focal

FT SpecAuthor

DRO Logger

ConformityRequirements

Approver

MOCQuestion

Cert Plan

MOCAnswers

TestApproval

ConformityRqmts

Approved CertPlan 0

FT Spec

ConformityRequirements

DRO Log#

Cert Rqmts

Prelim EWAInfo

ConformityRequirements &

Approval

TestSchedule

Priorities

Test PartsSparesOrder

Approver

PartsRequester

(ME)

Parts Orderer

Supplier (inclPart Maker)

Parts On DockDates

Released PartsRequest

Request forParts

ScheduleInfoPO

Parts

Clean EWA

Clarification

Concerns,Scope,

Justification

R/B Label PRR LTPRStandby Stock Req.

IDAS Input

EquipmentMgr

Contract Writer

Auth. to ChargeProgram

Contract

Test ProgramRestrictions

MaintenancePlan Rqmt

ProgramSchedule

Rqmts

EWA Info /Test Input

CriticalChain

Information

Prioritization

SchedQuestions

Revised/ReleasedEWA

TCR

FP2

FP3

FP1

FP0

WorkInstruction

Provider

.

ResourceReservation

Maker

ReleaseNotification

ServiceEngr SBReleaser

SB Release

AD/TaskCards/SB

NCR/NCOWorksheet & Other

FTWS

Worksheet

©©

©

©

©

©

©

©

©

©

©

Work pkg as definedcannot be completed (time

allotted or kit conflict)

Rev 20071130

AnalysisTeam

Leader

Operations TeamLeader

ProgramStructures

TeamLeader

ProgramSystems

TeamLeader

InstrumentationTeam

Leader

AnalysisSMEs

Operations SMEs

InstrumentationSMEs

SystemsSMEs

Structures SMEs

5thFloor

InstrumentationDesigner (May

be anothernetwork)

Test ProgramRequirements

LoggedTIA

ApprovedTIA

Released EWA,Test Desc. (1)

EWA Information/ Test Input

Prelim EWAInformation / Tech

Support

ApprovedTIA 0

Ext External to FOTV

Work PkgDefers after

Normal Cycle

Request TestChange

Test ChangeResponse

DiscreteWork ItemEstimator

RequirementsCoordinator

Coord for Tool /Equip Reservation

Coord for Tool /Equip Reservation 0

Coord for Tool /Equip Reservation 1

FP0Designated

ProblemInterfacer

Problem Details forTOC to engage Global

Partners

Flight Plan

Flight Plan 0

FAA FlightController

Part Rqmts

Part NeedRequest

WorkPackageScheduleAnalyzer

CoordinatedSchedule

InfoCapacityInfo

Balast & FuelRqmts

©

Part &ComponentTransporter

ResolutionInfo

Unresolvable Kit /Resource Conflict

SafetyCoordinat

or

CDC / AOG / Factory Coordin

ator

Kit Receiver 0

All elementsrequired to

accomplish work

People / Resource toaccomplish the work

Coordinatealternatives for Kit

Issues

Alternatives Identifiedto address kit issues

Part AvailabilityStatus

Logged TIA

Request forStatus

Part Availabililty /Schedule

Information 0

Work ItemRequirements

Work ItemRequirements

Status (parts, plans &tools) or Estimate info

Status of Parts,plans, tools or

Estimate

Request SpecialWork Need Info

Special WorkNeeds Identified

UndocumentedRequirements

Information

Flight LogData

Enterer

Flight LogInformation

Kit & PartStager

Required WorkComponents

Missing KitComponent

(Reservation)

Data Place (IP,SOI, FC, R/L

Rqmts, FTWS,NCO, Task

Cards)

CrewPlan

QA SME

MX SME

Data Sys / InstrSqawks

SB Release

ProgramEngineering

Test RequirementData

TIS

TIS Request forEngr Support

S/B Release

TIRL

Schedule

Schedule

Operational Info -Airplane Landing

Communicationwhile remote (ETA)

Early look at squawks(airplane statussquawks, etc) 0

TestStatus

Feedback0

Test StatusFeedback 0 0

Test StatusFeedback 0 0 0

Communication of problems gettingwork package completed (includingP/Us, SQUAWK, etc.) Details of any

potential Delta to Work Package

Communication of problems gettingwork package completed (includingA/P PU's, SQIAWK, etc.) Details ofany potential delta to work package

Plans toaddresschanges

Plans toaddresschanges

Plans to addresschanges

Work Packages Changes/ Deltas after Initial

Approved WP

Work Packages Changes/ Deltas (after Initial

Approved WP)

Work Packages Changes/ Deltas (after Initial

Approved WP)

Shift Manager

Decision /Direction

Chief TestPilot

Issue Info for Resolution &Communication of changes

to a/p work package

Issue Info forResolution

Visibility

Visibility

FC Author

Perlim EWAInformation

TOL / ADVAuthor

Prelim EWAInformation (2)

ReleasedEWA (1)

ReleasedEWA (2)

DraftFC

Draft TOL

Test PartsRequirement

A/PCommunications

(ETA, etc.)

FP2.5

Parts and Tools: Responsible for ensuring the availability anddelivery of parts, tools and resources to support completion of the

identified test work package .

Part / Kit AvailabililtyStatus / Schedule

Information 3

HardBallast

Provider/Initiator 0

RVI/NDIProvider 0

Sealer /Composite

RepairProvider 0

MRSAProvider/Ini

tiator 0

Tool RoomCribs Tool

Provider/Initiator 0

Red LabelAdministrat

or 0

Kit / PartsProvider/Initiator (EFP,FTS, PCA)

GSEProvider 0

SpecialTools

Provider 0

VendorReps

Parts/PaperProvider/Ini

tiator 0

Part Requirement/ Kit Request

ShippingProvider 0

ExportControl

Coordinator0

ECCN #s 0

ECCN #'sRequest 0

ECCN Paper/Parts 0

MRSA PartsRequest 0

SupplyChain

Analyzer 0

PartsProvider

(Stores/SWControl

Library 0

PartRequest 0

Part Demand /Status

PurchaseOrder

Parts Reqst0

Vendor 0

RequestAssistance 0

Assistance 0

Tool Holder 0

ToolsRequest 0 Tools 0

PartsRequest

Coord PartPickup

Coord PartPickup

PartsDelivered

PartsDelivered

Parts & Equipmentto be Transported

FieldCoordinator

0

MaintRequest

MaintainedGSE

ToolRequest 1

Tools 1

Test Operations Center: Responsible for fleet-level test program managemvisibility and metrics and managing non-local problem resolution.

ReleasedEWA

©

Released FC

ScheduleChanges

Request PPTStatus or Estiimate

Status of Fueland Ballast

Summaries of PlannedWork Package (for next

day+)

PPT Status

Daily TestStatus

StatusRequest

Status Info

Part Demand /Status

Part Status

Kit / Equipment /Part Requirements

TestSchedule

DST

A/P Test DataSystem Status

A/P ReleaseStatus

A/P in Stall

A/P in Stall

MaintenanceBriefing to Pilots

Airplane

A/P Status(ETA, etc.)

WeightManifest

Status

Parts on DockDates

ReleasedEngineering

ITPR

©

Status /Info

RequirementInfo

Availabilityinfo

RequirementInfo Availability

info

RequirementInfo

Availabilityinfo

RequirementInfo Requirement

Info

Availabilityinfo

Availabilityinfo

RequirementInfo

Availabilityinfo

Tools to beTransported / Kitted

Ballast to beTransported GSE to be

Transported

TIS

Work NeedsDelivered to Work

Location

Pull Data forCharts

ElevatedIssue

ReleasedTOL

Request Status(PPT)

ReservedComponents to be

moved

ReleasedEWA

Final Cert Plan(Proposed)

Approved CertPlan

TOLRequirement

ReleasedFC

FC Enteredinto TICS

RIP Info inTIRL

Request forEstimate

Estimates

EstimateInformation

TIS (to TOC)- Next daytesting info

ScheduleCreator

PreliminarySchedule Info

ScheduleInfo

Executable WorkPackage

ScheduleInfo

Propulsion TeamLeader

Regulator

Visibility

Visibility

Solution

Notification ofSolution

Solution to beImplemented (from

TOC)

Solution to beImplemented (from

TOC)

FlightPlan

EngineeringData

FTIR

AirplaneLanding

Task Cards

Liaison

Feedback

Missing KitComponent (Part)

Emergent Kit /Resource Solution

Cert PlanRequirement

ReleasedFC 1

TCR / ConfigRqmts

Request forApproval

EmergentApproved EWA

CR

Config Info

Config Info 0

SMEConsultation

SMEConsultation 0

Solution to beImplemented

ConformityCoordinator

Updatet TCRConformityComplete

FAA Pickup

Rqmts forshop assistif required

Request forConformityInspection

ConformityInspector

InspectionResults

ConformityPackage

ConformanceStatement(8130-10)

Official ConformityRelease (8100-1)

ReleasedTOL 0

ReleasedTOL 1

QualityRecords

(QAR)Inputter

All Squawks

Verify CompleteWork Package

TIPS

SolutionOptions 0

FleetImpacts 0

FleetImpacts

Status MetricsVisibility

ChangeManagement

Process(metrics/vis)

Decision onSchedule Change

MeasurementPreflt Results

Problem /EngineeringSquawks 0

ReleasedTOL 2

Notification ofIssues

QAR Data

MRBDispositio

ner

NCR (EPD)Discovered at A/P

All Pickups

MeasurementPreflight Results

Non Inst MRBDisposition

MRBVisibility

InstrumentationMRB Disposition

Input Adams RIPDatabases

MeasurementPreflight Status

Decision to go toBackup Plan

TestSchedules

FTWS /PFTWS

PartsRequirements

ConfigurationPlanner

ReleasedEWA

Outside WorkRequirements

Supplier

Production Changes& Extended NCRs

Prelim EWAInformation

TIRL 0

TCR 0

Test LogisticsCoordination

Test LogisticsCoordination 0

TCR / TIPFeedback

TCR / TIPFeedback 0

Test LogisticsCoodination 2

Test LogisticsCoordination 1

Modules &Blocks

TestSchedules 0

ConfigStatus

Instrumentation Planner

TestSchedule 0

Inst Status

Inst Status 0

FTIRClarification

ContingencyPlanning

ContingencyPlanning 0

Contingency

PFTWS

List of Calib PartRqmts, Sig CND &

Xducer Calid

InstrumentationParts Request (IPR)

InstrumentationDesing Rqmts

Package

PFTWS 0

Detailed System /General Info Flow

Detailed System /General Info Flow 0

Task CardDWI

Non-Inst MRBTag

DWI EstimateIssues

DWI EstimateIssues 0

DWI EstimateAssistance

DWI EstimateAssistance 0

DWI & Dates

DWI &Dates 1

FTIR

WP CapacityIssues

FTTIR Part 1

DWI Data &Dates

DWI Data &Dates 0

FC

TCR 1

WeightManifest

ReleaseForms

FC 0

A/P ReadinessIssues

CompletedFT-TIR

Sequence 1

Issue Info forResolution

SequenceFeedback1

TIPQuestions

TIP Answers

+

+

+

+

+

+

+

Engineering, Operations & Technology | Boeing Test & Evaluation

The Changing Face of Warfare in the 21st Century

“…And just like their allies in al Qaeda, this new Taliban is more network than Army, more a community of interest than corporate structure. For the U.S. military that I had spent my life in, this was not an easy insight to come by………It was over the course of years and with considerable frustration that we came to understand how the emerging networks of Islamist insurgents are fundamentally different from any enemy we have ever faced. In bitter bloody fights….it became clear to me that to defeat a networked enemy we had to become a network ourselves.” - General Stanley McChrystal “It takes a Network”; Foreign Policy, March/April 2011

Engineering, Operations & Technology | Boeing Test & Evaluation

What Does It Mean For T&E?

• The paradigm has shifted!

• Validation of the weapon system itself is no long sufficient

• Validation of the weapon system as a node in a network of weapon systems will be tantamount

• Understanding (and modeling) of the behavior of the network will be key to success in the networked battle-space of the future

• The new paradigm will require a shift in thinking, away from specification-based testing to……..

“Test As We Fight”

Engineering, Operations & Technology | Boeing Test & Evaluation

Test as We Fight

To improve test as we fight: • Create a relevant complex test environment.

– Stimulate network under test to drive emergent behavior – Understanding of the fidelity of hardware, emulation, modeling and

simulation – Pedigree of assets across the network available throughout test life

cycle

• Ensure the availability of critical assets across programs. – Labs and simulations – Integrated networks

• Keep a mission-level focus across the product test life cycle.

– Mission threads – Training testers to mission

• Change the test culture to meet complexity of the SOS test.

– Influence test-as-we-fight requirements that shape acquisition

Engineering, Operations & Technology | Boeing Test & Evaluation

Test as We Fight

Industry Networks

Contractor Facilities

Industry Partners

Non-DOD DOD

Government Networks

Low-fidelity Simulations Low-fidelity

Simulations

Other Programs’ Assets

Low-fidelity Simulations Low-fidelity

Simulations High-Fidelity Simulations

Re-hosted Operational

Software Re-hosted

Operational Software

Rehosted Operational

Software

Hardware Labs

Hardware Labs Hardware

Labs

Operational Assets

Operational Assets Operational

Assets Low-Fidelity Simulations

Engineering, Operations & Technology | Boeing Test & Evaluation

It Takes a Network

“Over time it became increasingly clear…… that our enemy was a constellation of fighters organized not by rank but on the basis of relationships and acquaintances, reputation and fame………All of this allowed for flexibility and an impressive ability to grow……The enemy did not convene promotion boards; the network is self-forming….After achieving some tactical success, a [young Iraqi] would market himself, make connections, gain followers, and suddenly a new node in the network would be created and absorbed. The network energy grew.” - General Stanley McChrystal “It takes a Network”; Foreign Policy, March/April 2011

Engineering, Operations & Technology | Boeing Test & Evaluation

The Leadership Challenge

“…As we learned to build an effective network, we also learned that leading that network—a diverse collection of organizations, personalities, and cultures—is a daunting challenge in itself. That struggle remains a vital, untold chapter of the history of a global conflict that is still underway.” - General Stanley McChrystal “It takes a Network”; Foreign Policy, March/April 2011

Copyright © 2012 Boeing. All rights reserved. | 13


Recommended