20
Bridge Bridge Design-Build Project Design-Build Project S.P. 6201-86 S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING PROJECT INFORMATIONAL MEETING
Transcript
Page 1: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

TH 5 Mississippi River BridgeTH 5 Mississippi River BridgeDesign-Build ProjectDesign-Build Project

S.P. 6201-86S.P. 6201-86

February 8, 2013

Michael Beer, P.E.MnDOT Project Manager

PROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETING

Page 2: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

DISCLAIMERDISCLAIMER

What is discussed today is informational only; it is What is discussed today is informational only; it is meant to assist interested teams in the pursuit of this meant to assist interested teams in the pursuit of this project.project.

The ultimate Contract requirements will be included in The ultimate Contract requirements will be included in the Request for Proposals (RFP). the Request for Proposals (RFP).

There may be changes between now and the time – if There may be changes between now and the time – if any – that the RFP is issued. It is fully expected that any – that the RFP is issued. It is fully expected that an RFP will be issued for this project, but it cannot be an RFP will be issued for this project, but it cannot be guaranteed.guaranteed.

Page 3: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

DESIGN-BUILD INFORMATIONDESIGN-BUILD INFORMATION

Peter DavichPeter Davich

Design-Build Program ManagerDesign-Build Program Manager

MnDOT OCIC/Technical SupportMnDOT OCIC/Technical Support

Page 4: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Design-Build Low BidDesign-Build Low Bid

Two Part Low BidTwo Part Low Bid

RFQ issued, 2-5 “most highly qualified” teams shortlisted.RFQ issued, 2-5 “most highly qualified” teams shortlisted.

RFP will be issued following shortlisting.RFP will be issued following shortlisting.

ATCs will be accepted; considering 5 per teamATCs will be accepted; considering 5 per team A ‘technical proposal’ is still required, but it is only the A ‘technical proposal’ is still required, but it is only the

legal forms. This must be determined responsivelegal forms. This must be determined responsive Stipends of $35,000 will be granted to teams who submit Stipends of $35,000 will be granted to teams who submit

responsive price proposalsresponsive price proposals The contract will be awarded to the lowest bidder that The contract will be awarded to the lowest bidder that

meets all Contract requirements.meets all Contract requirements.

Page 5: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

ProcurementProcurement

Relatively Short ScheduleRelatively Short Schedule RFQ Issued on 2/7/13RFQ Issued on 2/7/13

Single Point of Contact – Michael Beer. Let him know Single Point of Contact – Michael Beer. Let him know if you would like to receive clarifications/addenda.if you would like to receive clarifications/addenda.

Clarifications and Addendums posted to DB websiteClarifications and Addendums posted to DB website

Submit SOQ electronically to Peter DavichSubmit SOQ electronically to Peter Davich

Page 6: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Procurement TimelineProcurement Timeline

RFQ Clarifications Due:RFQ Clarifications Due: Feb 28, 2013Feb 28, 2013

SOQ DueSOQ Due March 08, 2013March 08, 2013

Short-ListShort-List March 28, 2013March 28, 2013

Issue RFPIssue RFP April 04, 2013April 04, 2013

DBE Meet and GreetDBE Meet and Greet TBDTBD

Tech Proposal (Legal Tech Proposal (Legal

Package) Due:Package) Due: June 3, 2013June 3, 2013

Price Proposals DuePrice Proposals Due June 14, 2013June 14, 2013

LettingLetting June 14, 2013June 14, 2013

Anticipated ContractAnticipated Contract August 15, 2013August 15, 2013

Page 7: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Information SourcesInformation Sources

Information SharingInformation Sharing Project ftp website:Project ftp website:

ftp://ftp2.dot.state.mn.us/pub/outbound/ocic/TH5_6201-86/

Design-Build website:Design-Build website:

www.dot.state.mn.us/designbuild/

One-on-one meetings.One-on-one meetings. Contact Michael Beer with all TH 5 Project questions:Contact Michael Beer with all TH 5 Project questions:

952-767-6623952-767-6623

[email protected]@state.mn.us Contact Peter Davich with all DB programmatic questions:Contact Peter Davich with all DB programmatic questions:

651-366-4233651-366-4233

[email protected]@state.mn.us

Page 8: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Conflict of InterestConflict of Interest

Approach Posted on Website:Approach Posted on Website:

www.dot.state.mn.us/designbuild/

All teams are responsible for reading, All teams are responsible for reading, understanding, and following this approach.understanding, and following this approach.

MnDOT Retained GEC ConsultantsMnDOT Retained GEC Consultants PB, SEH, Pierce PiniPB, SEH, Pierce Pini Listed in Section 2.7 of RFQListed in Section 2.7 of RFQ

Page 9: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

PROJECT INFORMATIONPROJECT INFORMATION

TH 5 Mississippi River Bridge DBTH 5 Mississippi River Bridge DB

Michael Beer, MnDOT Metro DistrictMichael Beer, MnDOT Metro District

Project ManagerProject Manager

Page 10: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project PartnersProject Partners

City of St. Paul and MinneapolisCity of St. Paul and Minneapolis

Ramsey and Hennepin CountyRamsey and Hennepin County

Fort Snelling and DNR parksFort Snelling and DNR parks

Federal Highway AdministrationFederal Highway Administration

Capital Region and Minnehaha Watershed DistrictsCapital Region and Minnehaha Watershed Districts

Design-Build ProposersDesign-Build Proposers

PB PB –– Design-Build Contract Development Design-Build Contract Development

Page 11: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project InformationProject Information

http://www.dot.state.mn.us/designbuild/TH5%20Miss/index.html

Page 12: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project DescriptionProject DescriptionGeneral LayoutGeneral Layout

RoadwayRoadway CPRCPR BridgesBridges ParksParks Staging AreaStaging Area

Page 13: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project DescriptionProject Description

River BridgeRiver Bridge Re-deckRe-deck Construct from aboveConstruct from above Ornamental LightsOrnamental Lights SidewalkSidewalk RailingRailing RepaintRepaint Structural AnalysisStructural Analysis

Page 14: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project DescriptionProject Description

River Bridge (cont.)River Bridge (cont.) BearingsBearings Pier concrete repairsPier concrete repairs Steel repairsSteel repairs

3 Bridge Deck Repairs3 Bridge Deck Repairs Mississippi Blvd.Mississippi Blvd. Mississippi Blvd.Mississippi Blvd. Edgcumbe RoadEdgcumbe Road

Page 15: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project DescriptionProject DescriptionBike and Pedestrians – local and extended detoursBike and Pedestrians – local and extended detours

Page 16: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.
Page 17: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project DescriptionProject DescriptionGeneral LayoutGeneral Layout

Page 18: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Design-Build Design-Build General Discussion PointsGeneral Discussion Points

No Co-HousingNo Co-Housing

DBEDBE Goal will be determined at RFPGoal will be determined at RFP Outreach MeetingOutreach Meeting

Quantity Risk for Repair WorkQuantity Risk for Repair Work

Oversight ContractOversight Contract

Page 19: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.

Project GoalsProject GoalsA safe work environment

Avoid or minimize construction related impacts

Provide a safe and understandable pedestrian detour

Quality project

Ensure that the River Bridge is structurally sound through analysis and design

Minimize impacts to the environment

Substantial Completion by September of 2015

Complete the project within budget

Innovative ideas to shorten schedule, cost, etc.

Page 20: TH 5 Mississippi River Bridge Design-Build Project S.P. 6201-86 February 8, 2013 Michael Beer, P.E. MnDOT Project Manager PROJECT INFORMATIONAL MEETING.