The Follo Line Project A presentation: Norway`s largest transport project LONGEST. URBAN. COMPLEX. FASTER.
Transcript
Page 1: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The Follo Line Project

A presentation: Norway`s largest transport project

LONGEST. URBAN. COMPLEX. FASTER.

Page 2: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The Follo Line will be built to meet the increased demand for rail capacity south of Oslo.

1,1 million residents in the Oslo region

30 % population increase by 2025

Currently no spare capacity on neither rail nor road

150 000 passengers every day

Potential for increased freight traffic

Background

NEXT PHASE IN PLANNING

Studies prior to public planning

Municipal master plan

Area Development plan

Planning completed/under construction

Completed

Page 3: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Extensive works at Oslo Central Station

The Follo Line will be constructed with connections to several platforms

A total relocation of the existing Østfold Line within this area

The work shall be carried out with minimum conflict with other traffic

Special attention shall be paid to a Medieval Park

Connection to Oslo Central Station

Page 4: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Outbound Follo LineInbound Follo LineOutbound Østfold LineInbound Østfold Line

Loenga

Oslo S

Oslo S area: Total track

length about 9,5 KM

Oslo S: Four tracks through «Klypen»

Page 5: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The longest railway tunnel in Norway - approximately 20 km

Two separate tubes with cross-passage approx. every 500 meters

Main excavation method is TBM, but also by drill & blast/drill & split

Close to Oslo Central Station the Follo Line and the inbound ØstfoldLine is to be excavated by Drill and Blast

Tunnel: Tunnel TBM and Tunnel D&B

Page 6: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Outbound FB Inbound FB Inbound ØB

Tunnels approaching Oslo S

Page 7: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Large rig area including production facilities

Two access tunnels Direct access to E6 Limited transportation along local

roads

Åsland rigg area: Four TBMs

Page 8: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The new Ski station shall be built with six tracks and three central platforms

The scope includes new pedestrian underpass, new road bridge and bus terminal

The scope includes an open section of approximately 1,5 km containing retaining walls and culverts.

The total length of new tracks in the Ski area is ~ 16,5 km.

Ski: The scope

Page 9: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The Follo Line Project: Time line

Page 10: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Drill & Blast

Page 11: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

EPC Drill&Blast

• EPC – design and build

• All works to be performed from Sydhavna

• Apx 420.000 m3 rock to be excavated

• Separate contract to reduce total construction time for the Follo Line

Page 12: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Ekeberg Tank

Ekeberghallene

Ekeberg Oljelager

Operatunnelen

Grønliatunnelen

Alnaelvtunnel

Tresporshallen

Ekebergtunnelene(E6)

OmlagtAlnaelvtunnel

E18 Mosseveien

Østfoldbanen

Utgående Follobane

Inngående Follobane

Tunnel til Ryen

Kloakktunnel Kværner-Ljan

Midgardsormenoverføringstunnel

Inngående Østfoldbane

Pumpestasjon

Sjursøytunnelen

Tverrslag Nord

Tverrslag Sør

Adkomst og Rømningstunneler

Søndre Portal

DemontasjekamreTBM

The three track tunnel

Page 13: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

The three track tunnel

• 140 m long cavern

• Low overburden to the existing Grønlia tunnel

• Three tracks -> apx 300 m2 cross-section

• Crossing a fault line in the tunnel opening

• Alum shale

• Entire excavation to be done from the inside

• Rock anchors to be installed from outside

Page 14: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Ekeberg Tank

Ekeberghallene

Ekeberg Oljelager

Operatunnelen

Grønliatunnelen

Alnaelvtunnel

Tresporshallen

Ekebergtunnelene(E6)

OmlagtAlnaelvtunnel

E18 Mosseveien

Østfoldbanen

Utgående Follobane

Inngående Follobane

Tunnel til Ryen

Kloakktunnel Kværner-Ljan

Midgardsormenoverføringstunnel

Inngående Østfoldbane

Pumpestasjon

Sjursøytunnelen

Tverrslag Nord

Tverrslag Sør

Adkomst og Rømningstunneler

Søndre Portal

DemontasjekamreTBM

Crossings of the existing E6 road tunnels

Page 15: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Crossings of the existing E6 road tunnels

• Very low overburden to the existing E6 tunnels

• 3D modelling of expected deformation in the road tunnels

• Restrictions on blasting

– Risk for damage to infrastructure in E6 tunnels

– Closing of tunnels will have huge impact on traffic

• Constructing concrete pillar to support E6 tunnels

Page 16: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Ekeberg Tank

Ekeberghallene

Ekeberg Oljelager

Operatunnelen

Grønliatunnelen

Alnaelvtunnel

Tresporshallen

Ekebergtunnelene(E6)

OmlagtAlnaelvtunnel

E18 Mosseveien

Østfoldbanen

Utgående Follobane

Inngående Follobane

Tunnel til Ryen

Kloakktunnel Kværner-Ljan

Midgardsormenoverføringstunnel

Inngående Østfoldbane

Pumpestasjon

Sjursøytunnelen

Tverrslag Nord

Tverrslag Sør

Adkomst og Rømningstunneler

Søndre Portal

DemontasjekamreTBM

Rerouting of the Alna river

Page 17: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Rerouting of the Alna river

• The new IØL crosses the existing Alna river

• River must be re-routed before full excavation is possible

• To maintain progress a temporary passage should be established

Page 18: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Ekeberg Tank

Ekeberghallene

Ekeberg Oljelager

Operatunnelen

Grønliatunnelen

Alnaelvtunnel

Tresporshallen

Ekebergtunnelene(E6)

OmlagtAlnaelvtunnel

E18 Mosseveien

Østfoldbanen

Utgående Follobane

Inngående Follobane

Tunnel til Ryen

Kloakktunnel Kværner-Ljan

Midgardsormenoverføringstunnel

Inngående Østfoldbane

Pumpestasjon

Sjursøytunnelen

Tverrslag Nord

Tverrslag Sør

Adkomst og Rømningstunneler

Søndre Portal

DemontasjekamreTBM

Close to oilcaverns

Page 19: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Close to oil caverns

• The IØL and the Folloline passes on either side of Ekeberg Oil Cavern

• Very low overburden to caverns

• Restriction on blasting due to sensitive infrastructure in the oil caverns

• Groundwater level must be obtained

• Grouting forbidden due to closeness to caverns

Page 20: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Ekeberg Tank

Ekeberghallene

Ekeberg Oljelager

Operatunnelen

Grønliatunnelen

Alnaelvtunnel

Tresporshallen

Ekebergtunnelene(E6)

OmlagtAlnaelvtunnel

E18 Mosseveien

Østfoldbanen

Utgående Follobane

Inngående Follobane

Tunnel til Ryen

Kloakktunnel Kværner-Ljan

Midgardsormenoverføringstunnel

Inngående Østfoldbane

Pumpestasjon

Sjursøytunnelen

Tverrslag Nord

Tverrslag Sør

Adkomst og Rømningstunneler

Søndre Portal

DemontasjekamreTBM

South portal

Page 21: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

South portal

• Work to be performed very close to existing Østfold line and E18 Mosseveien

• Restrictions on what affect work can have on rail and road

• Demolishing and reconstructing bridge for the E18 and integrating this into the South portal

• New railroad bridge over the entrance to Ekeberg hallene

Page 22: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Drill & Split

Drill & Split

Page 23: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Drill & Split

• Due to large areas of the new tunnel having heavy restrictions on blast induced vibration

• Search for a method for mechanical breaking of the rock mass

• Reports from Asia where the method “Drill&Split” have been used with success

Page 24: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Drill & Split

Page 25: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast
Page 26: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast
Page 27: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast
Page 28: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast
Page 29: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast

Takk for oppmerksomheten