37
© Turner & Townsend plc December 11 making the difference The Information Manager & PAS 1192 CITA, Dublin 17 th June 2015
Transcript
Page 1: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

© Turner & Townsend plc December 11making the difference

The Information Manager & PAS 1192

CITA, Dublin 17th June 2015

Page 2: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

making the difference

Tom Oulton

BIM Manager

Page 3: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

3

The Information Manager & PAS 1192

■ BIM: What? Why? How?

■ PAS 1192-3:2014

■ PAS 1192-2:2013

■ CIC BIM Protocol & Scope of Service

■ PAS 91

■ The Common Data Environment (CDE)

■ PAS 1192-5:2015

Page 4: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

4

The Information Manager & PAS 1192

■ Digital

representation

■ Physical and

functional

characteristics

■ Shared knowledge

■ Decision making

platform

■ Whole life basis

■ Build

■ Operate

■ Dispose

Image ©Autodesk

Page 5: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

5

The Information Manager & PAS 1192

■ BIM (Building Information Modelling) ‘level two’ which is defined by

PAS 1192-2:2013 as the “Process of designing, constructing or

operating a building or infrastructure asset using electronic object

oriented information”.

Page 6: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

6

We can build the building on the

computer before we build it in real life & we can test

everything in advance

The Information Manager & PAS 1192

Page 8: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

8

Level 0•Working with 2D drawings•Other project information in written documents

The Information Manager & PAS 1192

Page 9: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

9

Level 1•May still be using CAD, some 3D drawings / simple models•Introducing structured project information•Introducing structured co-ordination processes

The Information Manager & PAS 1192

Page 10: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

10

Level 2•Shift to 3D model with integrated attribute information•Separate model files for architecture, structural, M&E etc•Much project information now embedded in the model•Structured processes for co-ordination essential

The Information Manager & PAS 1192

Page 11: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

11

Level 3•Single shared model across project team•Single version of the truth•Structured process to manage co-ordination of information•Integration project insurance, fully collaborative

The Information Manager & PAS 1192

Page 12: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

12

Level 3

Industry capability

The Information Manager & PAS 1192

Page 13: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

13

The Information Manager & PAS 1192

Page 14: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

14

RIBA Plan of Work 2013

The Information Manager & PAS 1192

Page 15: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

15

The Information Manager & PAS 1192

Page 16: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

16

The Information Manager & PAS 1192

Page 17: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

17

The Information Manager & PAS 1192

Page 18: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

18

The Information Manager & PAS 1192

OIR

AIR

EIR

Organisational Information Requirements:Data and information required to achieve the organisation’s objectives

Asset Information Requirements:Data and information requirements of the organisation in relation to the asset(s) it is responsible for

Employer’s Information Requirements:Pre-tender document setting out the information to be delivered, and the standards and processes to be adopted by the supplier as part of the project delivery process

Page 19: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

19

The Information Manager & PAS 1192

Page 20: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

20

The Information Manager & PAS 1192

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

Page 21: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

21

■ Likely to be performed either by the Design

Lead or the Project Lead

■ In some circumstances the Employer may

appoint a stand alone Information Manager

■ No design related duties

“The Protocol requires the Employerto appoint a party to undertake the Information Management Role”

CIC BIM Protocol

The Information Manager & PAS 1192

Page 22: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

22

Role of the Information Manager

The principal responsibilities of the

Information Manager

■ Managing the processes and procedures for information exchange on projects

■ Initiating and implementing the Project Information Plan (PIP) and Asset Information Plan

■ Assisting in the preparation of Project Outputs, such as data drops/Information exchange

■ Implementation of the BIM Protocol, including the updating of the Model Production and Delivery Table (MPDT)

Page 23: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

23

The Information Manager & PAS 1192

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

Information management

■ Levels of detail

■ Training requirements

■ Planning of work & data segregation

■ Co-ordination & clash detection

■ Collaboration process

■ H&S / CDM

■ Data security (PAS 1192-5:2015)

■ Specific data inclusion/exclusion

■ Compliance plan

■ Coordinate origin/system

■ Software schedule

Commercial management

■ Exchange of information

■ Client’s strategic purposes

■ Software schedule

■ Responsibility matrix

■ Standards & protocols

■ Contractual anomalies

Competence assessment

■ Details of assessment

■ Changes to documentation

■ BIM tender assessment

Page 24: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

24

The Information Manager & PAS 1192

Outline scope of services for the role of

information management

■ To describe the role of Information Management

■ To describe a range of activities that is

consistent and in accordance with PAS1192-2

■ To motivate the development of Information

Management skills

Page 25: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

25

The Information Manager & PAS 1192

Common Data Environment Management

■ Establish the Common Data Environment (CDE)

■ Establish, agree and implement the information

structure

■ Receive information into the Information Model

■ Maintain the Information Model

■ Manage the Common Data Environment

Page 26: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

26

■ Initiate, agree and implement the Project

Information Plan (PIP) and Asset Information

Plan covering

■ Information structure

■ Provision of information

■ Level of detail of information

■ Incorporating as-constructed, testing

validating and commissioning

■ Enable integration of information within the

Project Team and co-ordination of information

by Design Lead

■ Agree formats for Project Outputs

■ Assist Project Team Members in assembling

information for Project Outputs

The Information Manager & PAS 1192

Project Information Management

Page 27: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

27

The Information Manager & PAS 1192

Collaborative working, information exchange

and project team management

■ Support the implementation of the Project BIM

protocol

■ Liaise with and co-operate with Project Team

Members and the Employer

■ Assist the Project Team Members in establishing

information exchange processes

■ Participate in and comply with project team

management procedures and processes

Page 28: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

28

The Information Manager & PAS 1192

Page 29: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

29

Common Data Environment (CDE)

■ “Single source of information for any

given project, used to collect, manage

and disseminate all relevant approved

project documents for multi-disciplinary

teams in a managed process”

■ May use

■ an extranet

■ a file-based retrieval system or

■ other suitable toolset

The Information Manager & PAS 1192

Page 30: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

30

■ A means of providing a collaborative

environment for sharing work

■ Ownership of information remains

with the originator

■ Shared information reduces the time

and cost in producing coordinated

information

■ Documents can be generated from

various combinations of model files

■ Used for version control and audit

trails

Image ©Mervyn Richards

Common Data Environment

The Information Manager & PAS 1192

Page 31: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

31

■ Documentation

■ 2D drawings

■ Assessments

■ Schedules

■ Reports

■ Non-graphical data

■ COBie

■ Quantity take off

■ Graphical Models

■ Architectural

■ Structural

■ MEP

■ Point cloud

■ Note, the stage at which information

exchanges are required should be specified

in the EIR by reference to the agreed

stage and gate names

Image ©CIOB

Information Exchange

The Information Manager & PAS 1192

Page 32: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

32

BIM Execution Plan (BEP)

The Information Manager & PAS 1192

■ Plan prepared by the suppliers to explain how the information

modelling aspects of a project will be carried out

■ Pre-contract BEPs are assessed by Information Manager as part of

PQQ process

■ Post-contract BEP provides the methodologies of supply chain

adherence to the EIR

Page 33: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

33

The Information Manager & PAS 1192

Page 34: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

34

The Information Manager & PAS 1192

Page 35: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

35

PAS 1192-5

Project Way

(control)

Contract

Assessment

InformationManagement

Process Management

OIR

AIR

EIR

CIC

PQQ

CDE

BEP

7 step BIM process

The Information Manager & PAS 1192

Page 36: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

36

PAS 1192-5

Project Way

(control)

Contract

Assessment

InformationManagement

Process Management

OIR

AIR

EIR

CIC

PQQ

CDE

BEP

7 step BIM process

The Information Manager & PAS 1192

Page 37: The Information Manager & PAS 1192 - CITA€¦ · The Information Manager & PAS 1192 Information management Levels of detail Training requirements Planning of work & data segregation

37

[email protected]

T: +44 (0) 113 258 4400

M:+44 (0) 796 11 22 349

Twitter: @itsBIMupNorth

#UKBIMcrew