    THE PADMA MULTIPURPOSE BRIDGE

    PROJECT AND ITS IMPORTANCE TO

    OUR ECONOMY

  • 7/30/2019 The Padma multipurpose bridge

    4/12

    LOCATION

    The bridge will be constructed over thepadma river from Mawa to Janjira

  • 7/30/2019 The Padma multipurpose bridge

    5/12

    LENGTH It will be thesecond largestbridge in the

    world and thelargest in the

    Asia

    the length ofthe bridge will

    be 6.15kilometers

    The width ofthe bridge willbe 21.10 meter

  • 7/30/2019 The Padma multipurpose bridge

    6/12

    ABOUT THE BRIDGE

    It will be a doubledeck bridge

    Top deck fourlane highway

    Lower deck singletrack railway

    The project has 12kilometer

    approach roads

    on both sidesMawa and Jajinra

  • 7/30/2019 The Padma multipurpose bridge

    7/12

    TOTAL COST OF THE PROJECT

    The project willcost 3 billion US$

  • 7/30/2019 The Padma multipurpose bridge

    8/12

    FINANCE

    The project willbe financed byWB , ADB ,

    JAICA , IDBand The

    government ofBangladesh

    WB will finance1.5 billion US$

    ADB will

    finance 615million US$

    JAICA will

    finance 415million US$

    IDB will finance140 million US$

  • 7/30/2019 The Padma multipurpose bridge

    9/12

    IMPORTANCE OF THE BRIDGE TO

    OUR ECONOMY

    It will create a link between the capital with the northern region

    The road users will save about 12,95,840 million taka per year

    The project will increase 0.33% national GDP and 2.3% regionalGDP

    It is called the nations dream

    The project will enrich our economy by increasing regional trade &

    business

  • 7/30/2019 The Padma multipurpose bridge

    10/12

    PROBLEMS WITH THE DONORSRecently The World Bank has cancelled its credit of 1.2

    billion US$ for the bridge at the issue of corruption

    The other donors also have become disinterested infinancing

    Now there is a big question how the bridge will beconstructed ?

  • 7/30/2019 The Padma multipurpose bridge

    11/12

    POSSIBLE SOLUTIONS TO

    OVERCOME THESE PROBLEMS

    The project can be completed by PPP

    The government can complete it withnations own fund

    It can be also completed by foreigninvestment