+ All Categories
Home > Documents > The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 °...

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 °...

Date post: 01-May-2015
Category:
Upload: cesarina-mauri
View: 214 times
Download: 0 times
Share this document with a friend
15
The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat Rimini, 8-9-2011 1
Transcript
Page 1: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

2° Bando per Progetti Ordinari

Joint Technical Secretariat

Rimini, 8-9-2011

1

Page 2: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

2

Presentazione delle propostePresentazione delle propostePresentazione ONLINE:

2/11/2011

https://sso.adriaticipacbc.org/gestionale/view/public/pubblicaBando.do

https://sso.adriaticipacbc.org/gestionale

Page 3: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Costruzione della proposta progettualeCostruzione della proposta progettuale

PartnershipPartnership

Coerenza obiettivi Programma/Politiche

Coerenza obiettivi Programma/Politiche

Problemi/sfide/opportunitàProblemi/sfide/opportunità

WorkplanWorkplan

Cross-border character Cross-border character

BudgetBudget

Page 4: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

PartnershipPartnership

La composizione del partenariato deve rispecchiare gli obiettivi della proposta

Ampiezza del partenariato, bilanciamento

Scelta del LB

Importanti le informazioni che vengono fornite per ogni Final Beneficiary (precedenti esperienze, contributo al progetto, competenze e capacità)

Page 5: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Problemi/sfide/opportunitàProblemi/sfide/opportunità

Descrizione della situazione di partenza

Importanza della proposta per i territori coinvolti.

Page 6: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Coerenza della proposta progettualeCoerenza della proposta progettuale

Coerenza della proposta progettuale con gli obiettivi del Programma/Priorità

Coerenza con le politiche nazionali/regionali

Cross-border character Cross-border character Componente II dell’ IPA

Dimensione trasfrontaliera (problemi, obiettivi, risorse, attività, impatti)

Page 7: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Work planWork plan

Management/Comunicazione

Descrizione WP/Descrizione azione/Localizzazione attività

Target group

Coerenza con il budget

Page 8: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

BudgetBudget

Efficacia ed Efficienza della spesa

Equilibrio tra budget lines/Workpackages e attività descritte

Value for money.

Page 9: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Ammissibilità delle speseAmmissibilità delle spese

Costi di preparazione Rendicontabili in caso di aggiudicazione del Progetto per attività svolte tra il 1° gennaio 2007 (per MS)/data di firma dei Financing Agreement (per Paesi IPA) e il 22 Novembre 2011.

Non ammissibili per partner in “de minimis” Max 2% del costo totale del progetto Overheads, promotion costs, investments, equipments and financial charges costs NON ammissibili.

Costi di implementazione Sostenuti tra la data di inizio (non prima del 3 novembre 2011) alla data di chiusura del Progetto (comprese attività di chiusura).

PROGRAMME MANAGEMENT AND CONTROL MANUAL

9

Page 10: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Categorie di costo

10

STAFF COSTSSTAFF COSTS

OVERHEADSOVERHEADS

TRAVEL & ACCOMODATION

TRAVEL & ACCOMODATION

EXTERNAL EXPERTISEEXTERNAL EXPERTISE

MEETING & EVENTSMEETING & EVENTS

PROMOTION COSTSPROMOTION COSTS

EQUIPMENTEQUIPMENT

INVESTMENTSINVESTMENTS

FINANCIAL CHARGES & GUARANTEE COSTS

FINANCIAL CHARGES & GUARANTEE COSTS

Page 11: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Costi eleggibili

11

Perché siano eleggibili i costi devono:non essere stati finanziati da altri programmi europei o nazionali o da risorse pubbliche;essere relativi al progetto approvato; essere necessari per lo svolgimento del progetto;essere ragionevoli, giustificabili e coerenti con le politiche dei costi del partecipante; essere sostenuti durante il periodo di eligibilità del progetto;rientrare in una delle categorie di spesa ammissibili;essere inferiori o uguali all’ammontare massimo del contributo approvato;essere inclusi nel budget del progetto approvato;essere identificabili e verificabili secondo i principi della registrazione contabile;essere sostenuti dal partecipante e registrati nei suoi libri contabili;essere giustificabili attraverso appropriate pezze giustificative.

Page 12: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Ammissibilità spese (in base alla localizzazione geografica del

partner)

12

Partner localizzati nell’area eleggibile

Partner localizzati FUORI area elegibile*

Staff YES NO

Travel and accommodation

YES, for meeting/events IN the eligible area

YES, for meeting/events IN the eligible area

Overheads YES NO

External expertise YES NO

Promotion YES NO

Meetings and EventsYES, for meeting/events IN

the eligible areaYES, for meeting/events IN

the eligible area

EquipmentsYES, for investments

located IN the eligible areaYES, for investments

located IN the eligible area

InvestmentsYES, for investments

located IN the eligible areaYES, for investments

located IN the eligible area

Financial guarantee and bank charges

YES NO

* Sede legale fuori area eleggibile, no sede operativa nell’area e spese non necessarie per raggiungimento obiettivi progettuali.

Page 13: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Tempistica

13

PROJECT START/END

PROJECT START/END

Il progetto non può iniziare più tardi di un

mese dalla firma del SC

Il progetto non può iniziare più tardi di un

mese dalla firma del SC

Page 14: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Raccomandazioni/suggerimenti

14

Leggere accuratamente tutta la documentazione messa a disposizione sul sito web del Programma

Competitività

Non registrarsi al sistema a ridosso della scadenza del bando.

Pianificare le attività in modo tale da poter iniziare a lavorare immediatamente.

Page 15: The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA) 2 ° Bando per Progetti Ordinari Joint Technical Secretariat.

The Programme is co-funded by the European Union, Instrument for Pre-Accession Assistance (IPA)

  

Per informazioni:

www.adriaticipacbc.org

[email protected]

15

FAQ

Implem

enta

tion

docum

ents

How to apply

Documents


Recommended