The SCATS Adaptive Traffic System 1
Transcript
Page 1: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

The SCATS Adaptive Traffic System

1

Page 2: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Content Introduction of SCATS SCATS Architecture Hardware and Detection Concept Communication Philosophy Adaptive Control Local Controller Functions

2

Page 3: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

What is SCATS?

3

SCATS = Sydney Coordinated Adaptive Traffic System Originated in Sydney, Australia Used in Europe, Australia, Hong Kong and

some areas in the US (Oakland County, Michigan)

Page 4: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

How does SCATS work? SCATS gathers data on traffic flows in

real-time at each intersection. Data is fed via the traffic controller to a

central computer. The computer makes incremental

adjustments to traffic signal timings based on minute by minute changes in traffic flow at each intersection.

Page 5: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Functions Detects traffic volume by movement Converts data to flow rate Calculates optimal cycle length Calculates optimal splits by phase Determines phase combinations Checks timing alteration thresholds Sets up implementation

Page 6: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture Central

Management System

Regional Computer

Regional Computer

Regional Computer

Regional Computer

Regional Computer

Management Functions

Strategic Traffic Control

Traffic Controllers - Tactical Traffic Control

1 to 32

up to 250 per Regional Computer

Page 7: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture Central Computer – Communications

and Database Functions

Regional Computer – Strategic Control

Local Traffic Controllers – Tactical Control

7

Page 8: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture 1. Central Computer Only for centralized monitoring of system

performance and equipment status. Central monitor computer (CMS) (a) data collection, input and monitoring (b) connected with Management Computer Management computer: printer terminal, visual

display, PC work Station. To maintain system at minimum resource owing to

central management. To diagnose faults quickly

8

Page 9: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture 2. Regional Computer It maintains autonomous traffic control of a set of

controllers. The system is expandable by simply adding regional

computers. To perform the strategy control algorithm. To use the time-of-day and traffic information to

select green split plan, interval offset plan and cycle time.

9

Page 10: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture 2. Regional Computer The local controller within region are grouped into

systems and subsystems. (a) System: *It was divided by typically geographically unrelated. * They do not interact with each other. (b) Sub-System: *The basic element of control at the strategic level. *Each sub-system may comprise one to ten

intersections

10

Page 11: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

11

Central Computer

Regional ComputerRegional Computer Regional Computer

SystemSystem System

Sub-system

Page 12: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Architecture 3. Local Controller For strategic operations, passes information to

regional computer and accepted information to adaptive traffic condition.

For tactical operations: (a)operate under the strategic umbrella. (b)keep local flexibility to meet cyclic variation in

demand at each intersection (c) base on detector information.

12

Page 13: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Hardware Management Computer – DEC VAX/ALPHA, Pone

VMS

Regional Computer – Personal Computer with Windows NT and Digi serial communications interface modules.

Local Processor – Traffic Controller with SCATS functionality.

13

Page 14: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Controllers 170 E Controllers Thru

Interface Card

2070s Thru Controller Software

ATC Controllers

14

Page 15: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

SCATS Sensors SCATS operated by looking at “Space” between

vehicles There is a relationship between traffic density and

Space time. Degree of Saturation – measure of effectiveness of

green time.

Page 16: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

• Loop detectors or Video detectors (as used in Oakland County, MI) in most lanes at the stop line.

SCATS Sensors

Page 17: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Communication Philosophy (1)

17

Page 18: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Communication Philosophy (2)

18

Page 19: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Adaptive Control 1 Strategy control It is undertaken by the regional

computers 2. Tactical Control It is undertaken by the local controller

19

Page 20: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Strategic Control (1)General Concept Basically, it concerned with the selection of suitable signal

timings for the target area and sub-areas based on average prevailing traffic conditions.

The detection information are preprocessed in the controller and sent to a regional computer to calculate “DS.

The algorithm is applied at a cycle-by-cycle basis.

The phase split plan, internal offset plan, external offset plan and cycle length are applied to the sub-system for the next cycle.

20

Page 21: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Strategic Control The Algorithms: (1) Degree of Saturation (DS) (2) Car Equivalent Flow (3) Cycle Length (4) Green split Plan (5) Offset Plans (6) Linking of Sub-systems

21

Page 22: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Degree of Saturation

22

ggDS′

= )( thTgg −−=′

DS=[green-(unused green)] / available green

Where, DS – Degree of saturation; g – the available green time; T – the total space time (no vehicle pass the sensor); t – the unit space time between vehicles while discharging (caused by the distance between vehicles); h – the number of spaces;

Page 23: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Degree of Saturation Unused green is a measure of efficiency (0 at

saturation flow, + for under saturation, - at oversaturation).

Standard space time at the maximum flow is self calibrated daily.

DS is the ratio of efficiently used phase time to available phase time.

DS can be >100%. i.e., during oversaturation, the used green can be negative – vehicles are closer than standard space time at the maximum flow.

23

Page 24: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Optimization

ParameterDS on each

strategy approach

Preset Weighting

Algorithm

To Balance DS

DS Reach 90%

Extra Green timeAdd to main road

or side road

Not VariedFix Time Period

Specified

If the DS of main (side) road reach 90%, add green time to main(side) road and reduce green time of side (main) road

If the DS of both main and side road reach 90

Page 25: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Car Equivalent Flow (VK)

25

3600DS g SVK ⋅ ⋅

=

• Derived from DS and the lane saturation flow for each lane; • Independent of Vehicle types in traffic stream; • The Car Equivalent Flow is calculated from the “measured DS”, Maximum flow rate for each strategic detector.

VK = DS * Green Time * vehicles per second at maximum flow;

Page 26: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Cycle Length

26

Page 27: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Cycle Length All intersections within a sub-system operate on a

common cycle length.

The Cycle Length is a function of the highest DS measured in the sub-system of the previous cycle.

User defined equilibrium DS values used to determine relationship between measured DS and CL.

The target CL is determined by measured DS.

27

Page 28: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Cycle Length Define RL’ as the difference of RL(current

revised CL) and last CL to record the moving direction of optimal CL.

Weighted average of RL’ (last three cycles) determine the final RL.

CL can move toward final RL by +/- 6 secs.

CL can move up to 9 secs if RL’ for the last two cycles was > 6 secs. (allows response to steep change in demand)

28

Page 29: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Cycle Length There are four background cycle length: Cmax: maximum cycle length Cmin: minimum cycle length Cs: a medium cycle at which good two-way

coordination can be achieved: Cx: all additional cycle length is given to a

nominated phase. It was selected by the strategic detectors data.

Note: subsystems at Cmin move to Cs unless the detected flow is lower than the scheduled limit.

29

Page 30: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Split Plan Four background split plans are provided to

face different traffic condition. The split plan also specified the normal

sequence of phases. Possible plans are examined each cycle to

determine the most “equisat” plan for the next cycle.

Equisat: DS on critical approaches equial. The new plan is determined while 3 of 4

votes (decision in each cycle) is the same.

30

Page 31: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Voting

Regional Computer

Split Plan

3 out of 4 votes

Offset Plan

4 out of 5 votes

Same Split Successive Cycles Same Split Successive

Cycles

New Split

Delay 4 cycles

New Offset

Delay 5 cycles

Implement

Each cycle make a decision; If 3 of 4 decisions from 4 successive cycle is the same, change the split plan; Otherwise, keep the same split

Page 32: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Offset Selection The offset is independent of cycle length and green

split variation.

It may be defined as function of cycle length to allow for queuing or link speed changes during heavy traffic.

(a) shorten: to allow for increasing residual queuing as demand rises.

(b) lengthen: to reflect the lower platoon spreads occurring in heaving traffic condition

32

Page 33: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Offset Selection The magnitude and dirction of offset alteration is

specify by the value and sign of A. P’=P[1+A*g(C)] P’: the modified offset; P: the basic offset; A: the specified modifying factor (+/-); g(C): linear function of cycle length; g(Cmax)=0;

g(C)=1(C<0.75Cmax).

33

Page 34: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Offset Selection The five offset plans: plan 1 operates only at

Cmin, plan 2 only operates at Cs<C<Cs+10. The remaining three are selected by a voting algorithm based on VK.

Offset plan vote is calculated once per cycle. The same plan from 4 of 5 votes is the new

plan.

34

Page 35: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Linking of sub-systems

35

C

CC

C

C

SS1 SS2 SS3 SS4

SS5Possible Marriage C

CC

C

C

SS1 SS2 SS3 SS4

SS5Possible Marriage

SCATS uses an index to decide the combination of sub-systems (SS): If the difference of Cycle Length at adjacent is less than 9s, the index +1; If the index = 4, the SSs should be combined as a new SS. The new Cycle length is set as the largest one of the original SSs.

Page 36: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Algorithm Subsystem Linkage

Decide Link or Not

Criteria Comparision

Benefit

LinkingLinking

No Benefit

Not Linking

Select 5 External Plan Based On Direction And Volume Between

Sub-System

Linking Implement Condition Merit Spread

Page 37: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Regional Computer

External Offset 5 Plan

Permanent Linkage

Criteria Comparison

Cycle by cycle

Favor (+) Inrement

Favor (+) Increment

Linkage 4: from 0:break

Nominate Cycle Length

Others Adjust Flollowing

Appropriate Offset

Force Immediate

Linkage

Select Link Plan

Page 38: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Tactical Control This level of control is undertaken by the

local controller.

The tactical control is able to modify the signal operation by strategic control.

Note: The main road phase can not be skipped or terminated early to own the signal co-ordination in tactical control.

38

Page 39: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Tactical Control Any phase may be (a) terminated early when demand is smaller than

average demand (b) omitted entirely when on demand (c) continued to its maximum value The local controller bases on tactical decision by

information from the vehicle detector at the intersection.

39

Page 40: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Tactical Control

Permanent Demand Other PlanNo Demand

Local Control

Sequence of Phase

Approach Timer

No Terminate Skip or TerminatePhase Omit

Actuated Detec. Strategy Order

Page 41: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Local Controller Functions 1. Mode of Operation 2. Phase Timing 3. Detector Logic

41

Page 42: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Conditional demand, locking, unlocking, turn left on red

Microprocessor controller

Operation Models

Manual Override

Field terminal portable pc

Inputcomputer time

plan; 24 detector; 8 pedestrain

Output16 veh. Signal

group; 8 pedest. Signal

group

masterlinkControl: regional computer; can operate actuate timer; coordination; varied pedest. Signal to match prevail traffic; constrained by local controller safety design

flexilinkNo computer information; cableless coordination; alter-RAM; prepare 10,16 or 20 plan; preset operate; FLEXIGEN generate, via CMS download

flashing

Fault; lamp switch interlock; electronic conflict; any safety concern

Sister/vp

Overlap veh. And pedest. Group green flexibility; independent of phase boundary; depend on any conceivable string of condition

islolate

Gap; waste; maximum; minimum; late start; rest 150 sec.; yellow; all red; pedest. 0-40; clearance 1; clearance 2.

Page 43: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Mode of Operations (1)Masterlink mode The controller operates in a coordinated system under the

control of a regional computer. To use the strategic data: (a)approaching volume counts (b)total loop operation time during green time The controller receives the split plan offset plan and cycle time

to be implemented. To change stage away from a main road, permission is

required from a regional computer. A side street can be gaped out when successive vehicles are

greater than 5 seconds and return unused green to the main road.

It can skip to a nominated stage when there is no demand. 43

Page 44: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Mode of Operations (2) Flexilink mode It performs the coordination when Masterlink fails to link to a

central computer To operate at preset times and selected plan by TOD. It can be used independently of a Masterlink system. It is a cableless linking.

44

Page 45: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Mode of Operation (3) Sister/VP link mode A pedestrian Phase includes: Pedestrian Walk interval and

Pedestrian Clearance interval;

A Vehicle Actuation(AP) Timer allows for the early termination of any phase;

The sister/VP link model is to coordinate the signal between a vehicle actuated controller and a pedestrian controller.

45

Page 46: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Mode of Operations (4) Isolated Model To operate at isolated fixed time, isolate semi or full actuated

control. To specify time-setting: phase sequence, maximum duration,

gap out, omitted, waste time.

(5) Flash mode To flash yellow or red/yellow display To work as control sequence fault, lamp switching interlocking

circuitry, electronic conflict monitoring. A kind of safety design, Safety interval time can not be altered in “RAM”.

46

Page 47: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Phasing Timing The time setting are stored in “PROM”, but

alternative (overriding) time settings may be stored in “RAM”.

RAM: (a) long life battery to maintain its content. (b) alter from keypad on the controller or

from a SCATS terminal.

47

Page 48: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Phasing Time (1)vehicle phase intervals Late start green: 0 to 20 seconds Minimum green: 0 to 20 seconds Reset green: 0 to 150 seconds Yellow: 3 to 6.4 seconds All red: 0 to 15 seconds.

48

Page 49: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Phasing Time (2) Pedestrian phase intervals Pedestrian walk interval (0-40): display isolated or

minimum walk time in Flexilink and Master link.

Pedestrian clearance 1 interval (0-40): flashing before any vehicle signal can step to yellow.

Pedestrian clearance 2 interval (0-40): flashing with vehicle yellow and all red.

49

Page 50: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Phasing Time (3) Vehicle actuation timers Gap change: time between successive actuates of detectors

exceeds a preset value (3-5 sec.) Waste time change: accumulates (preset headway –

detectors actuation) until waste time over preset value (6-10) Maximum change: (a) in the case of isloated control mode, each phase has been

setwith a Max time. (b)in the case of Masterlink mode: the maximum timer does

not operate and the phase is terminated by a command from the regional computer

(c) in the case of Flexilink mode: the point of terminating the phase is determined by the current plan.

50

Page 51: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Detector Logic (1)to work as different roles as defining in each

control mode. (2)Locking demand: once place, it remains even if

detector does not sustain an output (3) non-locking demand: cancel of detector output

indicates the vehicle has left. (4) The logic is used for the introduction of a phase

which services a filtering right turn movement or a unprotected left-turn movement.

51

Page 52: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

Deficiencies of SCATS With the stopline detection philosophy, it is

impossible to provide currently feedback information about the performance of signal progression.

There is no traffic model in SCATS, the “adaptive” process is completed by the local actual control, which limits the use of an optimization methodology.

52

Page 53: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

References Introductions Sims, A. G., and K. W. Dobinson. The Sydney Coordinated Adaptive Traffic

(SCAT) System Philosophy and Benefits. IEEE Transactions on Vehicular Technology, Vol. VT-29, No. 2, 1980, pp. 130-137.

Lowrie, P. R. The Sydney Co-ordinated Adaptive Traffic System – Principles, Methodology, Algorithms. In Proceedings of the International Conference on Road Traffic Signaling. London, United Kingdom, 1982, pp. 67-70.

Lowrie, P.R. 1982. SCATS: The Sydney Co-ordinated Adaptive Traffic System. Paper presented at the IEE International conference on road traffic signaling at London, U.K.

Lowrie, P. SCATS – The History of Its Development. Presented at the 8th World Congress on Intelligent Transportation Systems, Sydney, Australia, 2001.

53

Page 54: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

References Algorithm and Funcions Lowrie, P R. “SCATS, Sydney Co-Ordinated Adaptive Traffic System : A Traffic

Responsive Method of Controlling Urban Traffic”. Roads and Traffic Authority NSW, Darlinghurst, NSW Australia. 1990.

SIMS, A G Finlay, A B.”SCATS, Splits and Offsets Simplified (SOS)”. 12th Australian Road Research Board Conference, Hobart, Tasmania, 27-31 August 1984.

CORNWELL, P R, Luk, JYK, NEGUS, B J. “Tram Priority in SCATS”. Traffic Engineering and Control, Vol 27, Issue NO. 11. 1986

54

Page 55: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

References Presentations by the Company Betsy Silliams. “The Technology Side of the Sydney Coordinated Adaptive

Traffic System (SCATS)”.

TRANSCORE. “SCATS Adaptive Traffic System ”. TRB Committee A3A18 Adaptive Traffic Control Workshop, July 1998.

Neil R. Gross. “SCATS Adaptive Traffic System ”. TRB Adaptive Traffic Control Workshop, Jan 2000.

Bo Gao. “SCATS Adaptive Traffic Control System Introduction”. 2011 AZ ITE Spring Conference.

55

Page 56: The SCATS Adaptive Traffic System - National Chiao Tung ...ocw.nctu.edu.tw/course/sc011/2012-08-21.pdf · Adaptive Control ... The controller operates in a coordinated system under

References Evaluation and Application Dutta Utpal, McAvoy Deborah S, Lynch Jim, Vandeputte Laurel. “Evaluation of

the SCATS Control System”. Report: MIOH UTC TS4 2008-Final. RC-1545F.

Wilson, Christopher Joseph.“Microsimulation Evaluation of Benefits of SCATS-Coordinated Traffic Control Signals”. TRB 85th Annual Meeting. 2006

Daniel, J. “Signal Priority for Public Transit Vehicles Using Advanced Traffic Control Systems: A Comparative Evaluation of ATSAC, SCATS and SCOOT”.

56


Recommended