THE SEINE- SCHELDT PROJECT Design & Build Harelbeke
ir. Ellen Maes, project engineer SMART Rivers 2011, 15th of September 2011
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
WATERWEGEN EN ZEEKANAAL NV
Transport of goods over water
Water management & Safety against flooding
Multifunctionality of waterways
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
EUROPEAN DECISIONS (1996- 2006)
Trans-European Network for Transport (TEN-T) • Realisation of missing links • 30 priority projects, including Seine-Scheldt
• France (VNF): new canal “Seine – Nord Europe” • Flandres (W&Z): navigability improvements
• ECMT class Vb (185m x 11.4m x 3.5m)
EUROPEAN FUNDING
• Multi-annual work program 2007-2013 • International cooperation Seine-Scheldt
• Intergovernmental Commission (IGC) • European Economic Interest Grouping (EEIG)
• 10% financial aid granted (= 460 mio EUR) • Canal Seine – Nord Europe (France) • Border Lys (France, Walloon and Flemish region) • Lys (45km) + canals (26km) in Ghent region (W&Z) • Scheldt + canal Condé-Pommeroeul (Wallonia)
SEINE- SCHELDT Water profile in the Lys river
• Water depth of 4.5m (now: Lys 3.5m)
• Maintaining the width at water level
=> Dredging necessary
SEINE- SCHELDT Bridges (8)
• Free height of 7.00m (over 35m width)
• Necessary for large parts or 3 layers of containers
SEINE- SCHELDT Embankments
• Mooring places (250-300m long) • 1-way traffic with communication through RIS/AIS • Waiting zone for large vessels to cross each other
• Ecological embankments • Quay walls
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
SEINE- SCHELDT Definition of River Restoration
“All measures to restore or reinforce the structure and processes which contribute to the dynamic balance in the river ecosystem”
•River ecosystem = river bed + meanders + embankments •Dynamic balance: a river is in constant evolution
• Erosion vs. sedimentation • Flooding vs. droughts
SEINE- SCHELDT River restoration (1)
• Reinforcing the dynamics in the ecosystem
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
SEINE- SCHELDT IN HARELBEKE (1/3)
• Deepening of the Lys • New lock • New weir • Restoration of migratory
routes for fish • Heightening of
Kuurnebrug upstream (*) • New Hoge Brug
downstream • New waiting and mooring
places • Construction of
(ecological) embankments
(*) not part of D&B
Hoge brug
Kuurnebrug
SEINE- SCHELDT IN HARELBEKE (2/3)
• Dredging + protection against erosion
• Straightening of waterway downstream Hoge Brug
• New urban quay • New industrial quay Geldof
• Realisation of intake at Banmolens
• Renovation of hydraulic turbine Banmolens (*)
• Continuous service road on left bank (+ bridge over intake)
• Road works on right bank
(*) not part of D&B
Site Geldof
Banmolens Banmolens
SEINE- SCHELDT IN HARELBEKE (3/3)
• Spatial planning (without realisation): • Passage of the Lys at the
new lock & weir • Insertion of Marina
(Kuurne) • Impact assessment on
new urban quarter on left bank
• Overall spatial valorisation of the surroundings (o.o. Bloemmolens)
Bloemmolens
Urban development
EXISTING INFRASTRUCTURE (1/3)
• Banmolens • Industrial heritage • Reconversion project
• Lofts • Hydraulic turbine • Intake needed!
• Spatial cohesion • Fish migration?
EXISTING INFRASTRUCTURE (2/3)
• Bloemmolens • Industrial site until
summer ‘09 • Acquisition by W&Z
to safeguard space for future lock and weir
• Possibility to transform into lofts?
NAVIGATIONAL DEMANDS
• Traffic prognosis versus lock capacity (1/2) Traffic prognosis Seine-Scheldt (million tonnes)
0
2
4
6
8
10
12
14
16
1997
1999
2001
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
2023
2025
traffic in the pastgrowth industrial production +1.37%container and waste traffic + new quay wallsproject induced trafficchange of route
NAVIGATIONAL DEMANDS
• Mooring structures • Bollards in lock walls • Floating construction
• Continuity of
navigation during construction
WATER MANAGEMENT
• Normal water management: • Upstream
10.18m TAW • Downstream
8.00m TAW • Hydrological data
T (year)
Q (m³/s)
H_up (m TAW)
H_dwn (m TAW)
1 145 10.05 8.94
2 165 10.05 9.12
5 174 10.05 9.28
10 180 10.05 9.40
25 190 10.08 9.56
50 199 10.28 9.69
100 208 10.46 9.84
500 240 10.86 10.20
MHW
CONCEPTUAL PLANS
Variant A Variant C
Acquisitions needed Minimal to none Bloemmolens
By-pass weir Not necessary (temporarely) necess.
Techn. feasability To be investigated OK
Continuity navigation During construction OK
Navigability Optimal axis line Broken axis line
Bloemmolens Lofts in the future? Demolition needed
Variant A: best solution, but achievable? Variant C is achievable, but not as good…
FISH MIGRATORY ROUTE
• By-pass new lock and weir • Restoration of river dynamics on meander • Integration of Banmolens / Bloemmolens?
INDUSTRIAL QUAY GELDOF
• Continuity of Geldofs activities • Straightening the curve implies building
a new quay wall downstream • Acquisition planned nearby
EXPLOITATION & MAINTENANCE REQUIREMENTS
• Life Cycle Management “keep the Whole Life Cycle Cost to a minimum”
• Avoid calamities • Renewable energy sources • Accessibility of the (construction) site
CONCLUSION OF PRELIMINARY STUDY
• The construction of a new lock and weir at Harelbeke is one of the main challenges for the international Seine-Scheldt project
• There are many conflicting goals that need to be reconciled
• An integrated project, by means of a Design & Build procedure is launched, based on two variants
OVERVIEW
• Waterwegen en Zeekanaal NV
• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys
• Design & Build in Harelbeke
• Aims • Procedure
DESIGN & BUILD PROCEDURE
Phase 1: 7 candidates • 31/05/2011 – 25/10/2011 • Conceptual plans to be provided
Phase 2: 3 candidates • 20/01/2012 – 19/06/2012 • Detailled design to be provided
Phase 3: 3 candidates • 01/10/2012 – 30/10/2012 • Price to be offered for approved tender from phase 2
D&B AND DURABILITY (1/2)
• Lack of M(aintenance) in procedure • How to obtain durability?
• Reduce maintenance costs • Reduce exploitation costs • Use sustainable forms of energy • Minimize downtime of the structure • Maximize comfort for navigation • Avoid calamities • Take the necessary safety measures • …
D&B AND DURABILITY (2/2)
Criteria for ranking tenders Points
Total cost 40
Technical quality 20
Nautic and hydraulic quality 15
Life span, exploitation and maintenance cost 10
Spatial quality 5
Nuisance control 5
Planning 5
TOTAL 100
CONCLUSION
• Complexity of the project • Close deadline (2016)
D&B procedure
• Lack of maintenance part in procedure Attention to durability Life Cycle Management