The Tevatron Collider Upgrade to L=2E32 (aka Run II). 4. Steve Holmes Symposium in Commemoration of the 25 th Anniversary of First pbar -p Collisions at Fermilab December 17, 2010. Luminosity Strategy. Number of protons per bunch. Number of antiprotons (total). Beam emittance. - PowerPoint PPT Presentation
Popular Tags:
14
The Tevatron Collider Upgrade to L=2E32 (aka Run II) Steve Holmes Symposium in Commemoration of the 25 th Anniversary of First pbar-p Collisions at Fermilab December 17, 2010 4
Transcript
Page 1: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

The Tevatron Collider Upgrade to L=2E32 (aka Run II)

Steve HolmesSymposium in Commemoration of the

25th Anniversary of First pbar-p Collisions at Fermilab

December 17, 2010

4

Page 2: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Luminosity Strategy

Tevatron Symposium, S. Holmes Page 2

L =

fN p (BN p )

2( p2 p

2 )F ( z / *)

3fN p( BNp )

* ( p p )F ( z / * )

Number of protons per bunch

Number of antiprotons (total)

Beam emittance

Page 3: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Tevatron Symposium, S. Holmes Page 3

TM-1491

Page 4: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Tevatron Symposium, S. Holmes Page 4

Page 5: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Main Injector Schedule 44

Tevatron Symposium, S. Holmes Page 5

Page 6: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Main Injector Construction

Tevatron Symposium, S. Holmes Page 6

Page 7: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Recycler

Tevatron Symposium, S. Holmes Page 7

Page 8: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

MI and Recycler Complete

Tevatron Symposium, S. Holmes Page 8

Page 9: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Run II Goals

Tevatron Symposium, S. Holmes Page 9

RunII Goal (wo/ Recycler)

RunII Goal (w/ Recycler)

Achieved(Best store)

Protons/bunch 2.70E+11 3.00E+11 2.86E+11Antiprotons/bunch 3.00E+10 6.60+10 9.44+10Total Antiprotons 1.08E+12 2.83E+12 3.40E+12Antiproton Production Rate 2.0E+11 3.8E+11 2.6E+11 hour-1

Accumulator->150 GeV eff 0.90 0.90 0.90150 GeV -> low eff 0.90 0.90 0.92Accumulator -> low eff 0.81 0.81 0.83Proton emittance (95%, norm) 20 18 15 mm-mrPbar emittance (95%, norm) 15 18 12 mm-mrBeta @ IP 0.35 0.35 0.28 mBeam Energy 1000 980 980 GeVBunches 36 36 36Longitudinal Emittance (protons) 3 3 3 eV-sec

Longitudinal Emittance (pbars) 3 3 3 eV-sec

Form Factor (Hourglass) 0.70 0.70 0.65Typical Luminosity 8.1E+31 2.0E+31 4.0E+31 cm-2sec-1

Page 10: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Run II Luminosity

Tevatron Symposium, S. Holmes Page 10

04/0

1/01

07/0

1/01

10/0

1/01

01/0

1/02

04/0

1/02

07/0

1/02

10/0

1/02

01/0

1/03

04/0

1/03

07/0

1/03

10/0

1/03

01/0

1/04

04/0

1/04

07/0

1/04

10/0

1/04

01/0

1/05

04/0

1/05

07/0

1/05

10/0

1/05

01/0

1/06

04/0

1/06

07/0

1/06

10/0

1/06

01/0

1/07

04/0

1/07

07/0

1/07

10/0

1/07

01/0

1/08

04/0

1/08

07/0

1/08

10/0

1/08

01/0

1/09

04/0

1/09

07/0

1/09

10/0

1/09

01/0

1/10

04/0

1/10

07/0

1/10

10/0

1/10

0.00E+00

5.00E+31

1.00E+32

1.50E+32

2.00E+32

2.50E+32

3.00E+32

3.50E+32

4.00E+32

4.50E+32

0.00E+00

5.00E+31

1.00E+32

1.50E+32

2.00E+32

2.50E+32

3.00E+32

3.50E+32

4.00E+32

4.50E+32

Peak Luminosity Peak Lum 20x Average

Peak

Lum

inos

ity

Peak

Lum

20x

Ave

rage

Main Injector

Recycler

First DOE Review

Page 11: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Tevatron Symposium, S. Holmes Page 11

Page 12: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Electron Cooling

Tevatron Symposium, S. Holmes Page 12

Page 13: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

Some (nice) words about the DOE

“Run II is not a construction project. Run II is a complex campaign of operations, maintenance, upgrades, R& D and studies.” D. Lehman to HEPAP, July 2003

Tevatron Symposium, S. Holmes Page 13

Page 14: The  Tevatron  Collider Upgrade to L=2E32  (aka Run II)

History of Run II

Tevatron Symposium, S. Holmes Page 14

135791113151719212325272931333537394143454749515355575961636567697173757779818385878991939597991011031051071091111131151171191211231251271291311331351371391411431451471491511531551571591611631651671691711731751771791811831851871891911931951971992012032052072092112132152172192212232252272292312332352372392412432452472492512532552572592612632652672692712732752772792812832852872892912932952972993013033053073093113133153173193213233253273293313333353373393413433453473493513533553573593613633653673693713733753773793813833853873893913933953973994014034054074094114134154174194214234254274294314334354374394414434454474494514534554574594614634654674694714734754774794814834854874894914934954974995015035050.00

20.00

40.00

60.00

80.00

0.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

Weekly Integrated Luminosity Run Integrated Luminosity

Week #

Wee

kly

Inte

grat

ed L

umin

osity

(pb-

1)

Run

Inte

grat

ed L

umin

osity

(pb-

1)