The Tevatron Collider Upgrade to L=2E32 (aka Run II)
Steve HolmesSymposium in Commemoration of the
25th Anniversary of First pbar-p Collisions at Fermilab
December 17, 2010
4
Luminosity Strategy
Tevatron Symposium, S. Holmes Page 2
L =
fN p (BN p )
2( p2 p
2 )F ( z / *)
3fN p( BNp )
* ( p p )F ( z / * )
Number of protons per bunch
Number of antiprotons (total)
Beam emittance
Tevatron Symposium, S. Holmes Page 3
TM-1491
Tevatron Symposium, S. Holmes Page 4
Main Injector Schedule 44
Tevatron Symposium, S. Holmes Page 5
Main Injector Construction
Tevatron Symposium, S. Holmes Page 6
Recycler
Tevatron Symposium, S. Holmes Page 7
MI and Recycler Complete
Tevatron Symposium, S. Holmes Page 8
Run II Goals
Tevatron Symposium, S. Holmes Page 9
RunII Goal (wo/ Recycler)
RunII Goal (w/ Recycler)
Achieved(Best store)
Protons/bunch 2.70E+11 3.00E+11 2.86E+11Antiprotons/bunch 3.00E+10 6.60+10 9.44+10Total Antiprotons 1.08E+12 2.83E+12 3.40E+12Antiproton Production Rate 2.0E+11 3.8E+11 2.6E+11 hour-1
Accumulator->150 GeV eff 0.90 0.90 0.90150 GeV -> low eff 0.90 0.90 0.92Accumulator -> low eff 0.81 0.81 0.83Proton emittance (95%, norm) 20 18 15 mm-mrPbar emittance (95%, norm) 15 18 12 mm-mrBeta @ IP 0.35 0.35 0.28 mBeam Energy 1000 980 980 GeVBunches 36 36 36Longitudinal Emittance (protons) 3 3 3 eV-sec
Longitudinal Emittance (pbars) 3 3 3 eV-sec
Form Factor (Hourglass) 0.70 0.70 0.65Typical Luminosity 8.1E+31 2.0E+31 4.0E+31 cm-2sec-1
Run II Luminosity
Tevatron Symposium, S. Holmes Page 10
04/0
1/01
07/0
1/01
10/0
1/01
01/0
1/02
04/0
1/02
07/0
1/02
10/0
1/02
01/0
1/03
04/0
1/03
07/0
1/03
10/0
1/03
01/0
1/04
04/0
1/04
07/0
1/04
10/0
1/04
01/0
1/05
04/0
1/05
07/0
1/05
10/0
1/05
01/0
1/06
04/0
1/06
07/0
1/06
10/0
1/06
01/0
1/07
04/0
1/07
07/0
1/07
10/0
1/07
01/0
1/08
04/0
1/08
07/0
1/08
10/0
1/08
01/0
1/09
04/0
1/09
07/0
1/09
10/0
1/09
01/0
1/10
04/0
1/10
07/0
1/10
10/0
1/10
0.00E+00
5.00E+31
1.00E+32
1.50E+32
2.00E+32
2.50E+32
3.00E+32
3.50E+32
4.00E+32
4.50E+32
0.00E+00
5.00E+31
1.00E+32
1.50E+32
2.00E+32
2.50E+32
3.00E+32
3.50E+32
4.00E+32
4.50E+32
Peak Luminosity Peak Lum 20x Average
Peak
Lum
inos
ity
Peak
Lum
20x
Ave
rage
Main Injector
Recycler
First DOE Review
Tevatron Symposium, S. Holmes Page 11
Electron Cooling
Tevatron Symposium, S. Holmes Page 12
Some (nice) words about the DOE
“Run II is not a construction project. Run II is a complex campaign of operations, maintenance, upgrades, R& D and studies.” D. Lehman to HEPAP, July 2003
Tevatron Symposium, S. Holmes Page 13
History of Run II
Tevatron Symposium, S. Holmes Page 14
135791113151719212325272931333537394143454749515355575961636567697173757779818385878991939597991011031051071091111131151171191211231251271291311331351371391411431451471491511531551571591611631651671691711731751771791811831851871891911931951971992012032052072092112132152172192212232252272292312332352372392412432452472492512532552572592612632652672692712732752772792812832852872892912932952972993013033053073093113133153173193213233253273293313333353373393413433453473493513533553573593613633653673693713733753773793813833853873893913933953973994014034054074094114134154174194214234254274294314334354374394414434454474494514534554574594614634654674694714734754774794814834854874894914934954974995015035050.00
20.00
40.00
60.00
80.00
0.00
2000.00
4000.00
6000.00
8000.00
10000.00
12000.00
Weekly Integrated Luminosity Run Integrated Luminosity
Week #
Wee
kly
Inte
grat
ed L
umin
osity
(pb-
1)
Run
Inte
grat
ed L
umin
osity
(pb-
1)