Page 1: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS
Page 2: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Time: April 4, 2014, 9:45-10:45 a.m.

Venue: Crystal 1-2

Speaker: John Peterson

Data Center Design

and Commissioning

Page 3: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Data Center Trends • Design alterations based on density

improvements

• In 2016, the same floor space will be able to house 22% more equipment than in 2011

• More efficient data center design through modularity adoption

• According to the 2012 Uptime Institute survey, 80% of respondents have built a new data center or upgraded an existing facility within the past five years, and 30% of respondents ran out of data center capacity at one of their sites in 20122

• Between 2011–16 more than 11,000 new data centers will be constructed globally

• High enterprise relevancy for addressing space, power, and cooling, as well as costs and skills for environments

• Large and enterprise-scale data center growth of 11% and 7% respectively, 2011–16

Critical facilities design

Critical facilities implementation

Critical facilities strategy

Available

Optimized

Critical facilities assurance

Critical facilities energy

• A poorly designed data center may reduce IT and business agility

• Periodic refurbishment costs to upgrade and replace aging equipment, such as chillers and battery systems, driving TCO decisions

• An alarming inaccuracy for data center operators managing the thermal conditions at the room level, not the rack inlet level

• When building a new data center, around half of the respondents are interested in pursuing some kind of green certification, with the leading option being the U.S. Green Building Council’s LEED program

Page 4: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

“Forward-thinking companies have realized that to run data centers efficiently, and to extend their lives indefinitely, it is not logical to treat data center facilities and IT assets separately, because without one the other can’t operate.”

David J. Cappuccino, Gartner, Inc. August 2011

®

Page 5: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Aiming for the data center of the future

• Efficient and effective

• Self-regulating

• Mature standardized processes

• Fully available and resilient

• Real-time monitoring & control

• Fully service-oriented

• Green

• Business-centric

• Integrated

• Modular and elastic

• Shared resource pools

• Policy-based

• Fully automated

• Right sourcing

Page 6: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

IT to Facilities: Why can’t facilities fix my air problem?

Page 7: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Facilities to IT: Why don’t you just do this?

Page 8: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

How inefficiency can cost business Business impact related to cooling issues

Server or system downtime

Increased operational costs

Data center outage

Inability to add capacity

Fail to support business growth

Loss of revenue

Lowered customer

satisfaction

Page 9: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

IT failure rates and facility longevity

The data center lifecycle

Page 10: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

CFD Analysis

Page 11: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Energy Audit & Optimization Report Recirculation-Impact of Blanking Panels

Page 12: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Outside Air Economizer & Humidity

Page 13: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

13 16 April 2014

PUE (Power Usage Effectiveness) CUE (Carbon Usage Effectiveness);WUE (Water Usage Effectiveness)

ERE(Energy Reuse Effectiveness); ERF(Energy Reuse Factor)

Emergency generator

Utility transforme

r

Total data center energy

PUE Total data center energy from all fuels

(kWh) Total IT energy (kWh)

Ma

in

po

we

r

Hou

se

p

ow

er

Mis

c.

po

we

r

IT

po

we

r In

Me

ch

. p

ow

er

Total data center energy

House energy

=

Data center

Main service

PP-Gen service

Lighting panel

Generator block Heaters

& lighting

Lighting, Exit

lights, BMS,

EPMS & security

House panels

UPS

STS

PDUs

RPPs

Mech. Swgear

Data center CRAC units,

AHUs, Chillers & Dry coolers

Fuel

Misc. support

Mech. support

Pow

er

To

IT

IT-critical load District

chilled water

District steam

Natural gas

CO2

NOx

WUE Total Direct Water Consumption

CUE

Fuel

ERF

ERE

Page 14: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

14 16 April 2014

Facilities

Cooling and Power Systems Affect PUE Two system design concepts compared

Max PUE = 1.63 Average PUE = 1.56 Annual Energy = 49 million kWH

Max PUE = 1.45 Average PUE = 1.41 Annual Energy = 44 million kWH

Difference is 5 million kWH ($500,000 at $0.10/kWH)

Page 15: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

15

Indoor Temperature and Moisture Levels ASHRAE recommendations at computer equipment air intakes

MAXIMUM 80°F dry-bulb 67°F wet-bulb 60°F dew point

MINIMUM 65°F dry-bulb 53°F wet-bulb 43°F dew point

Page 16: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Climate Zone Optimization

Page 17: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

HVAC-CRAH data & measurements

Page 18: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

HVAC System Power Measurements

Page 19: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Air Management measurements & analysis

Page 20: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Air Management measurements & analysis

Page 21: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Data Centre Average Power Consumption

0

100

200

300

400

500

600

CO

OLI

NG

SY

STE

MS

CRA

C F

AN

S

HU

M /

DEH

UM

FUEL

OTH

ER

MEC

H IT

UPS L

OSSES

GEN

PRE-

HEA

TER

LIG

HTS

OTH

ER E

LEC

kW

• Too many CRAHs/Turn CRACs off!

• Controlled on return air!

• Low air temp & %RH set points!

• Controls fighting!

• Fixed speed fans, no VFDs!

• Old fan motors with low efficiency!

• Dual filters!

Common issues

Energy Audit & Optimization Report CRAC/CRAH fan power optimization

Page 22: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

0

5

10

15

20

25

30

35

40

45

<15 15-20 20-25 25-32.2 32.2-40 >40

<59F 59-68F 68-77F 77-90F 90-104F >104F

Hot Spots

Overcooling

Energy Audit & Optimization Report Identification of overcooling & hot spots

Page 23: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Energy Audit & Optimization Report Optimizing Air Management

• Consider return air plenum and ductwork for the CRAC units

• Remove obstructions under the floor that restrict cold air to supply the server inlets

• Ensure as best as possible the adequate supply of cold air to the server inlets

• Ensure air velocities and flows from floor grilles are sufficient to reach the top of cabinet servers

• Fit blanking plates in cabinets where servers are not installed

• Close gaps between cabinets (where warm air can make its way to the server inlet)

• Avoid installing highly loaded servers at the end of cabinet row or at the top where recirculation is easier

• Consider means to physically isolate the supply (cold) and return (hot) air streams

Supply air

CRAC

Server

Return air

Recirculated air (if servers need more air than supplied)

Recirculation: results in hot spots and wastes fan energy

Page 24: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Server

Energy Audit & Optimization Report Optimizing Air Management

• Locate floor air grills so that they supply the inlet of servers, i.e. remove floor air grills from hot aisles and other useless areas

• Ensure air velocities from floor grilles are not too high and overshoot the cabinet height

• Seal air gaps in the raised floor

• CRAC units turned off are a source of air bypass (consider air isolation with dampers)

Bypass: Starves servers from air and wastes fan energy

Bypass

Floor tiles and

racks badly

located/oriented

High exit velocity

CRAC

Return air

Page 25: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Server

Energy Audit & Optimization Report Optimizing Air Management

Negative flow: Venturi flow

Return air

Negative flow if high underfloor air velocity

CRAC

Page 26: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Energy Audit & Optimization Report Air Management Metrics-Practical Applications

Legacy D C, particularly if not well managed, tend to have high levels of both bypass and recirculation flow rates. Cold aisle – hot aisle arrangements can address the main problems of recirculation. However, particularly at low loads, there will be high levels of bypass air, unless the CRAC units have some type of variable air-flow control.

BP

OPPORTUNITY

Page 27: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Energy Audit & Optimization Report Perforated Tiles Locations

Poor location and unnecessary

CR

AC

2

CR

AC

1

Page 28: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

28

Implementing ASHRAE conditions ASHRAE recommended & allowable ranges

R R

ASHRAE PSYCHROMETRIC CHART NO.1

NORMAL TEMPERATURE

BAROMETRIC PRESSURE: 29.073 INCHES OF MERCURY

Copyright 1992

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC.

794 FEET

Weather Data Location:

SAN_ANTONIO, TEXAS, USA

Weather Hours

11 to 1

22 to 12

33 to 23

44 to 34

55 to 45

66 to 56

77 to 67

88 to 78

99 to 89

Class A4

Class A3

Class A2

Class A1

Recommended

-15

-10

-5 0 5 10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

120

DR

Y B

ULB

TE

MP

ER

AT

UR

E -

°F

10% RELATIVE HUMIDITY20%

30%

40%

50%

60%

70%

80%

90%

-15 -10 -5 0 0 5

5 10

10 15

15 20

20 25

25 30

30 35

35 40

40 45

45 50

5055

55

6060

65

6570

70

75 WET B

ULB

TEM

PERATU

RE - °F

75

80

R R

ASHRAE PSYCHROMETRIC CHART NO.1

NORMAL TEMPERATURE

BAROMETRIC PRESSURE: 29.073 INCHES OF MERCURY

Copyright 1992

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC.

794 FEET

Page 29: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

29

Implementing ASHRAE conditions ASHRAE recommended & allowable ranges

Page 30: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

• Annual energy cost savings $165,892 • Total incentives-PG&E $232,249.14 • SPB 4.4 years • NPV +28k • IRR 12%

• Annual energy Savings 1,658,922 kWh • Demand reduction 111 kW • Carbon reduction 498 Metric Tons • PUE improvement 10%

• SAT reset control from 61 to 74 °F • Hot/cold aisle rack layout, over head cooling. • High eff 483 Ton WCC (CH-1), NPLV 0.405. • VFD PCHWP-1- premium efficiency motor. • VFD CWP-1-premium efficiency motor. • VFD CT-1- premium efficiency motor. • VFD WC CRAH-17 to CAH-24-prem eff motor • ASE motorized damper intake hoods, VFD, premium efficiency motors.

• Networking provider

• IT/Communication industry

• 5,000 SF raised floor

• Perceived UTI Tier 3 Data Center

• San Francisco bay area

The Implemented Solution The Client

Case study: HVAC system upgrades & Air Side Econ.

The Metrics The Financials

Page 31: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

• Annual energy cost savings $57,816 • Total incentives-PG&E $46,216 • SPB 3.8 years • NPV +35k • IRR 16%

• Annual energy Savings 525,600 kWh • Demand reduction 58 kW • Annual Carbon reduction 158 Metric Tons • PUE improvement 4%

• National Company

• Communication industry

• 10,000 SF raised floor

• Perceived UTI-Tier 2 Data Center

• San Francisco bay area

The Implemented Solution The Client

Case study-Air management via hot aisle containment

The Metrics The Financials

Page 32: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Thank you

Page 33: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Time: April 4, 2014, 9:45-10:45 a.m.

Venue: Crystal 1-2

Speaker: Raja Natarajan

Data Center Design

and Commissioning

Page 34: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

The Commissioning Process

Page 35: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Define Owners Project Requirements

• Building Due Diligence

• Identify Performance Outcomes

• Lessons Learned Review

• Clients Brief

• Draft Commissioning Plan

The Process

Page 36: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Commissionability & Maintainability

• Single Points of Failure Elimination

• 1:10:100 Potential Cost Savings

• Avoid ‘Blind’ Value Engineering

• Thought for the Facility Manager

The Process

Page 37: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Clear & Concise Tender Instructions

• Give the contractor a fighting chance

• Avoid unnecessary variations

• Identify on and offsite requirements

The Process

Page 38: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Built for Commissioning

• Early Installation Fault Identification

• Logical Integration into Construction Schedule

• Clear identification of approved processes

• Off-Site Factory Tests

The Process

Page 39: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Task Tracking and Verification

• All tasks identified and tracked

• Proactive support not bullying

• Aim to minimize repeat testing

• Witness verification

The Process

Page 40: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Testing of Major Equipment

Mechanical

Chillers, CRAC Units

Electrical

UPS, STS, Generators

Fire Protection Systems

Gaseous suppression systems, Pre-action Systems

BMS & Controls

Page 41: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Provide absolute confidence…

• Demonstrate of performance and integration

• Fire and Life Safety

• Secure Power and Cooling

• Documented Audit Trail

• Trained to Operate

The Process

Page 42: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Heat Load Tests (HLT)

• To demonstrate the performance of the cooling system

using a substitute load to simulate actual conditions

• To monitor/record the effects of simulated failures and

changeover of system operation on the cooling system

• All testing of individual equipment to be complete prior

to HLT

Page 43: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS
Page 44: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS
Page 45: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS
Page 46: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Integrated Systems Tests

(IST)

Failure conditions are simulated to ensure systems react

in a manner to which they are designed

Used to verify the correct integrated operation of the Data

Center in various cause and effect modes of failure

Page 47: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Tests conducted during IST

Simulate failure of

Main Utility Power and

demostrate operation

of generator

Simulate failure of

generator power and

demonstrate battery

operation of UPS

system

Simulate failure of UPS

System and

demonstrate operation

of STS System

Electrical

Page 48: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Tests conducted during IST

Simulate failure of

Chiller / Chillers and

demonstrate capability

of chiller control

system

Simulate failure of

CRAC units and

demonstrate capability

of CRAC control

system

Carry out simulation of

fire alarms and effect

on data center

Mechanical

Page 49: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Adjust to Suit

• Observe use – Tune to suit

• Educate to avoid override

The Process

Page 50: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Continuous Commissioning

• Defect Resolution

• Seasonal Adjustment

• Fit for purpose

• Transitional Commissioning

The Process

Page 51: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Commissioning

Management Process

Copyright: BSRIA

Page 52: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Energy Efficiency of

Data Centers

• Due to technological advances, demand for data center

space throughout the developed world will remain high.

• Amount of electricity consumed will be exceptionally

high due to the high power demands of data centers

• It is important to monitor and improve the energy

efficiencies of the data centers

Page 53: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Recent Government

Developments

• Early appointment of Commissioning

Agent to discuss and agree strategies

to optimize energy efficiencies within

data center

• Proper sealing of the data center

environment

• Optimizing air flow

• Increasing cooling system efficiencies

• System of monitoring and tracking of

energy efficiency parameters

Page 54: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Improving Energy

Efficiency through Commissioning

Management

Effective commissioning has been shown to improve the operating

efficiency and environmental performance of a building over its life cycle.

Commissioning is growing in importance due to the growing complexity

of buildings

Continuous commissioning has been proven to save energy and costs

throughout the life of the building

Page 55: Time: April 4, 2014, 9:45-10:45 a.m. - NEBB · Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2 Speaker: John Peterson Data Center Design and Commissioning . ... BMS, EPMS

Thank You