12 STR
15" RCP
15" RCP
24"
RC
PIN
V=884.6
5’
INV=881.82’
INV=887.3
4’
INV
=887.9
2’
INV
=887.9
3’
INV=888.38’
TO
P=879.7
1’
15" RCP INV=885.67’
INV=884.80’
15" RCPINV=883.16’
HH
CONC
WIRE
TEST
REGULATOR
FIELD
RE
GU
LA
TO
R
FIE
LD
20’ B
ST
20’ B
ST
19’ B
ST
RR SIG
SIG
RR
JB
18" CMP
PL
AN
TE
R
S
1SBD
LT
21’ CONC HW
18"
PV
C
INV
=875.6
8’
INV
=880.0
0’
INV
=876.7
0’
INV
=876.6
6’
(2) 24"
RC
P
12’ S
OIL
4’ CONC HW
TO
P=881.97’
DB 1696 PG 845
CLEARWATER PAPER CORPORATION
EXISTING CSX R/W
EXISTING R/W
30.0
0’
EIP
S 74°4
2’5
5"
W405.3
2’ (EIP-EIP)
400.9
5’ (R
W-EIP)
JJI LIG
HTIN
G
GR
OU
P, IN
C.
DB 1125 P
G 2356
ABANDONED
EIP
INV
=875.8
5’
-CSX1- & -NS1-
-EL--EL-
-CSX1-
-NS1-
18" CMP
8"
VC
P
8"
VC
P
A-10
05
A-10
07
A-10
08
6" STEEL
6" STEEL
6" STEEL
6" STEEL
16"CIP
16"CIP
16"CIP
16"CIP
50
PR
200PR
200PR
200PR
200PR
CO
AXIA
L
SE
RVIC
E
2"S
TE
EL
10"CIP
100 PR
100 P
R
LT
SE
RVIC
E
8"
DIP
16"
DIP
6"STEEL
b
n
G-F
AR
M
6’ CONC HW
WIRETESTGAS
VALVES
IRRIGATION
24 STR
CLEARWATER PAPER CORPORATION
DB 1642 PG 197
CAPITAL FUNDS, INC.
CORPORATION BOOK 18 PG 604
A-1006
DI
CORPORATION BOOK 18 PG 604
CAPITAL FUNDS, INC.
W\LT
BOX
SIG
RR
PLANTER
JJI LIGHTING GROUP, INC.
DB 1125 PG 2356
W\LT
W\LT
W\LT
BST VARIES
SR 1313 WASHBURN SWITCH RD
4266
888.17
FROGOF
POINT
100.0
0’
74
74
226
Washburn
Switc
h R
d
Artee RdRandolph Rd
Plato Lee R
d
Blanton
Sand Rd
W Cabanis R
d
W Dixon Blvd
Polkville R
d
PROJECT
VICINITY MAP
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LIMITS ESTABLISHED BY METHOD II.CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE
226
SR 1313
WASHBURN SWITCH RD
NAD 83/ 2011
TO US 74TO PLATO LEE RD
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
RIG
HT O
F
WA
Y PLA
NS
10/9/2017
09/08/99
UTILITIES SECTION ENGINEER
UTILITIES SQUAD LEADER PROJECT ENGINEER
UTILITIES PROJECT DESIGNER
XXDE
PA
RT
M
ENT OF TRANSPO
RT
ATI
ON
ST
ATE
OF
NORTH CAR
OLI
NA
SEAL
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
SHEET NO.
UC-1
UTILITY CONSTRUCTION PLANS
STATE OF NORTH CAROLINADIVISION OF HIGHWAYS
T.I.P. NO.
50 50
50 50
2010510
25 100
25 100
INDEX OF SHEETS
SHEET NO. DESCRIPTION
UC-1 TITLE SHEET
UC-2 UTILITY SYMBOLOGY
UC-3 NOTES
PREPARED IN THE OFFICE OF:
FAX (919) 250-4151PHONE (919) 707-6690RALEIGH NC 27699-15551555 MAIL SERVICES CENTER
UTILITIES UNITDIVISION OF HIGHWAYS
UTILITIES ENGINEERING
SHELBY COUNTY
THE NCDOT BY:
PLANS PREPARED FOR
C 2016
PHONE: (919) 682-3538
SHELBY, NORTH CAROLINA 27701
300 WEST MORGAN STREET SUITE 1500
NC LICENSE #F-0102
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
K:\
CH
L_P
RJ\0
17072000
City of Shelb
y\0
07
Washburn S
witch
Waterline Relocation\0
4_
CA
DD\Pla
nSheets\0
17072_
UC_
UC1_
PS
H.d
gn
Nolan Raney, P.E.
UTILITIES PROJECT ENGINEER
UTILITIES PROJECT DESIGNER
OWNERS ON PROJECT WATER AND SEWER
Matthew A. Shoesmith, P.E.
Rachel E. Rausch, EIT
(1) WATER - CITY OF SHELBY
DETAILSUC-4A THRU UC-4B
UC-5 THRU UC-7 UTILITY CONSTRUCTION SHEETS
R-5849
WASHBURN SWITCH BUSINESS PARK
WATERLINE RELOCATION ALONG SR 1313 (WASHBURN SWITCH RD.)
LOCATION:
TYPE OF WORK:WATER RELOCATION
TIP P
ROJE
CT: R-5849
25+
00
20+
00
15+
00
10+
00
UC-5 UC-6
STA. 10+00.00BEGIN WATERLINE CONSTRUCTION
STA. 27+70.84END WATERLINE CONSTRUCTION
PROFILE SHEETUC-8
IV
IV
IV
IV
IV
IV
IV IV
IV
IV
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
SHEET NO.PROJECT REFERENCE NO.
10/9/2017
K:\
CH
L_P
RJ\0
17072000
City of Shelb
y\0
07
Washburn S
witch
Waterline Relocation\0
4_
CA
DD\Pla
nSheets\0
17072_
UC_
UC2_P
SH.d
gn
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
RFH
RWM
PWM
GV
REM WM
PS(W)
LS
LS/BP
BV
TGV
PFH
BO
RRPZ
RBFP
PRPZ
PBFP
REM FH
STATE OF NORTH CAROLINADIVISION OF HIGHWAYS
TEL PED
AR
UV
CP
SP
PS(SS)
HH
T
C
11� Degree Bend
22� Degree Bend
45 Degree Bend
90 Degree Bend
Plug
Cross
Tee
Reducer
Relocate Fire Hydrant
Relocate Water Meter
Gate Valve
Remove Water Meter
Line Stop
Line Stop with Bypass
Butterfly Valve
Tapping Valve
Blow Off
Relocate DCV Backflow Preventer
Relocate RPZ Backflow Preventer
Remove Fire Hydrant
Utility Pole with Base
Underground Power Line
UTILITIES PLAN SHEET SYMBOLS
Power Pole
Telephone Pole
Joint Use Pole
Telephone Pedestal
Thrust Block
NOTE
Trenchless Installation
Encasement by Open Cut
Encasement
PAY ITEM
Plan Note
Pay Item Note
Underground Telephone Cable
Underground Telephone Conduit
Underground Fiber Optics Telephone Cable
Aboveground Water Line
Underground TV Cable
Underground Water Line
Underground Fiber Optics TV Cable
Underground Gas Pipeline
Aboveground Gas Pipeline
Underground Gravity Sanitary Sewer Line
Aboveground Gravity Sanitary Sewer Line
Underground SS Forced Main Line
Underground Unknown Utility Line
*
*
*
*
*
*
*
*
*
*
Water Manhole
Power Manhole
Telephone Manhole
Sanitary Sewer Manhole
SUE Test Hole
H-Frame Pole
Hand Hole for Cable
Power Transformer
Telephone Pedestal
CATV Pedestal
Gas Valve
Gas Meter
Located Miscellaneous Utility Object
Abandoned According to Utility Records
End of Information
Power Transmission Line Tower
*
A/G Gas
A/G Sanitary Sewer
A/G Water
PROPOSED WATER SYMBOLS
Water Line (Sized as Shown)
Water Meter
Fire Hydrant
Water Pump Station
RPZ Backflow Preventer
DCV Backflow Preventer
(Sized per Note)
Manhole
Sewer Pump Station
PROPOSED SEWER SYMBOLS
(Type as Shown)
Utility Line Drawn from Record
(Type as Shown)
Designated Utility Line
(Sized as Shown)
Gravity Sewer Line
(Sized as Shown)
Force Main Sewer LineE.O.I.
AATUR
(Type as Shown)
Utility Line by Others
Air Release Valve
Utility Vault
Concrete Pier
Steel Pier
For Existing Utilities
PROPOSED MISCELLANOUS UTILITIES SYMBOLS
EXISTING UTILITIES SYMBOLS
Sanitary Sewer Cleanout
Fire Hydrant
Water Valve
Water Meter
T
Power Pole
Telephone Pole
Joint Use Pole
Utility Pole
W
P
T
R-5849 UC-2
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
EVERY NECESSARY PRECAUTION AGAINST INJURY AND/OR DAMAGE TO THE WORK.
UNDER THE CHARGE AND CUSTODY OF THE CONTRACTOR AND THE CONTRACTOR SHALL TAKE
UNTIL THE WORK IS ACCEPTED BY THE CITY OF SHELBY, THE PROJECT SHALL BE 19.
COST OF THE PROJECT.
NECESSARY FOR PROPER TRANSITION BETWEEN MATERIALS SHALL BE SUBSIDIARY TO THE
TO ANOTHER, WHERE INDICATED ON THE PLANS. MATERIALS, LABOR, AND EQUIPMENT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRANSITION FROM ONE PIPE MATERIAL 18.
BEFORE PROCEEDING WITH THE WORK.
CENTERLINES SHOWN. THE CONTRACTOR MUST NOTIFY THE ENGINEER OF ANY DISCREPANCIES
LAYOUTS FROM THE SITE LAYOUT CONTROL POINTS, AND FROM THE DIMENSIONS AND
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PERFORMING ALL CONSTRUCTION 17.
APPROVED EROSION CONTROL MEASURES.
ALL DEWATERING DISCHARGE SHALL BE FILTERED THROUGH SILT BAGS AND/OR OTHER
CONSTRUCTION DEWATERING, IF ANY, IS INCIDENTAL TO THE PROJECT BID ITEMS. 16.
CITY OF SHELBY AT NO EXTRA PAY.
FIELD ADJUSTMENTS MAY BE NECESSARY AND WILL BE CARRIED OUT AS DIRECTED BY THE
ALL PHASES OF CONSTRUCTION MUST BE COORDINATED WITH THE CITY OF SHELBY. 15.
SCHEDULE TO THE ENGINEER AT THE TIME OF THE PRE-CONSTRUCTION MEETING.
THE CONTRACTOR SHALL SUBMIT IN WRITING A SEQUENCE OF CONSTRUCTION AND WORK 14.
ONSITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
ALLOWED OVERNIGHT WITHOUT THE PRIOR WRITTEN APPROVAL OF THE CITY OF SHELBY.
SAFETY PLAN AT THE TIME OF PRE-CONSTRUCTION MEETING. NO OPEN TRENCHES WILL BE
UNLESS NEGATED BY GROUNDWATER CONTROL MEASURES. CONTRACTOR SHALL HAVE A TRENCH
STANDARDS ARE NOT MET. A PULL BOX, MEETING OSHA STANDARDS, MAY BE ACCEPTABLE,
CONSTRUCTION. SHEETING, SHORING AND BRACING SHALL BE REQUIRED WHEN SIDE SLOPE
HEALTH ADMINISTRATION (OSHA) STANDARDS THAT ARE IN EFFECT AT THE TIME OF
GOVERNING EXCAVATION. TRENCH SIDE SLOPES SHALL MEET OCCUPATIONAL SAFETY AND
THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS 13.
GREATER THAN 10 SQUARE FEET BARE.
WHEN VEGETATION ACHIEVES ONE (1) INCH IN HEIGHT, WITH 85% COVERAGE AND NO
STRAW MULCHING, FERTILIZING AND WATERING. REVEGETATION SHALL BE ACCEPTABLE
PRIOR TO ACCEPTANCE OF THE PROJECT. REVEGETATION SHALL CONSIST OF SEED SOWING,
THE CONTRACTOR SHALL REVEGETATE UNPAVED AREAS DISTURBED BY CONSTRUCTION 12.
PLANS OR THE SPECIFICATIONS.
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION EXCEPT WHERE MODIFIED IN THESE
ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CURRENT NCDOT STANDARD 11.
PROPERTY WITHOUT PRIOR WRITTEN AGREEMENT WITH PROPERTY OWNER.
THE CONTRACTOR SHALL NOT PLACE FILL OR WASTE MATERIAL ON ANY PRIVATE 10.
ALL DAMAGE.
PUBLIC HIGHWAYS ON OR ACROSS ANY PAVEMENT, HE SHALL PROTECT THE PAVEMENT FROM
WHERE THE CONTRACTOR DESIRES TO MOVE EQUIPMENT NOT LICENSED FOR OPERATION ON 9.
ENGINEER. THIS SHALL BE CONSIDERED SUBSIDIARY TO THE COST OF THE PROJECT.
CONTRACTOR SHALL CONTROL DUST BY SPRINKLING WATER, OR AS APPROVED BY THE
THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST. 8.
SUBSTANTIAL COMPLETION.
REPRODUCIBLE MARKUPS THAT RECORD ALL CONSTRUCTION DEVIATING FROM THE PLANS AT
THE CITY�S RECORDS. THE CONTRACTOR SHALL PROVIDE THE CITY FULL SIZE
THE CONTRACTOR SHALL MAINTAIN A NEAT AND ACCURATE RECORD OF CONSTRUCTION FOR 7.
HORIZONTAL CONTROL SHOWN ON THE PLANS THROUGHOUT THE PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE VERTICAL AND 6.
SUBSIDIARY COST TO THE PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED.
EXISTING LINES PRIOR TO CONSTRUCTION. THIS ITEM SHALL BE CONSIDERED AS A
CONTRACTOR SHALL VERIFY THE ELEVATION, CONFIGURATION AND ANGULATIONS OF 5.
FIELD CONDITIONS THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND CITY IMMEDIATELY.
PRIOR TO COMMENCING WORK. IF A DISCREPANCY EXISTS BETWEEN THE PLANS AND ACTUAL
CONTRACTOR SHALL FIELD LOCATE EXISTING UTILITY LINES TO BE CONNECTED TO 4.
COMPENSATION SHALL BE ALLOWED.
ITEM SHALL BE CONSIDERED AS A SUBSIDIARY COST TO THE PROJECT AND NO ADDITIONAL
DISTURBED DURING CONSTRUCTION TO ITS ORIGINAL LOCATION AND ELEVATION. THIS
THE CONTRACTOR SHALL RE-ESTABLISH ANY PROPERTY MARKER, BENCHMARK, ETC. 3.
WORKS DIRECTOR AT 704-484-6840 AT LEAST 48 HOURS PRIOR TO STARTING CONSTRUCTION.
FOR THESE ACTIVITIES TO TAKE PLACE. THE CONTRACTOR SHALL CONTACT THE PUBLIC
PUBLIC WORKS DEPARTMENT PERSONNEL SHALL DETERMINE THE MOST APPROPRIATE TIME
A MINIMUM OF 48 HOURS PRIOR TO CUTTING OR CONNECTING TO EXISTING UTILITY LINES.
THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF SHELBY UTILITIES DEPARTMENT 2.
CONSTRUCTION. THE NC ONE CALL TELEPHONE NUMBER IS 1-800-632-4949.
UTILITY COMPANIES OR AGENCIES IN WRITING AT LEAST 48 HOURS PRIOR TO BEGINNING
BEEN INCLUDED IN THE CONTRACT PRICE. THE CONTRACTOR SHALL NOTIFY ANY AFFECTED
RESULTING FROM THE WORK. THE COST OF ALL OF WHICH WILL BE CONSIDERED AS HAVING
FOR THE SAFETY AND PROTECTION THEREOF, AND FOR REPAIRING ANY DAMAGE THERETO
OF THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES DURING CONSTRUCTION,
INFORMATION AND DATA, FOR LOCATING ALL UNDERGROUND FACILITIES, FOR COORDINATION
CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH
ACCURACY OR THE COMPLETENESS OF ANY SUCH INFORMATION AND DATA; AND, THE
OBSERVED IN THE FIELD. THE OWNER AND ENGINEER SHALL NOT BE RESPONSIBLE FOR THE
OR CONTIGUOUS TO THE SITE IS APPROXIMATE AND BASED ON PHYSICAL APPURTENANCES
INFORMATION AND DATA SHOWN WITH RESPECT TO EXISTING UNDERGROUND FACILITIES AT
PUBLIC OR PRIVATE, PRIOR TO EXCAVATION OR PRIOR TO MANUFACTURE OF PIPE. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES, WHETHER 1.
GENERAL NOTES
A NON-PAY ITEM.
WITH NCDOT GUIDELINES. ANY SIGNS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AS
CONSTRUCTION SHALL BE REPLACED AT EQUAL OR BETTER CONDITION AND IN ACCORDANCE
OF CONSTRUCTION. ANY SIGN REQUIRING REMOVAL AND REPLACEMENT AS A RESULT OF
CONTRACTOR SHALL MAKE ALL ATTEMPTS TO PROTECT ALL SIGNS WITHIN THE LIMITS 39.
AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
CONSTRUCTION. THIS ITEM SHALL BE CONSIDERED A SUBSIDIARY COST TO THE PROJECT
CONTRACTOR SHALL NOTIFY CITY STAFF OF THE NECESSARY REMOVAL PRIOR TO
OF CONSTRUCTION. IF CONSTRUCTION REQUIRES ANY TREE TO BE REMOVED, THE
CONTRACTOR SHALL MAKE ALL ATTEMPTS TO PROTECT ALL TREES WITHIN THE LIMITS 38.
PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING FENCING ALONG THE 37.
DRAINAGE.
EDGE OF PAVEMENT AND MEET EXISTING PAVEMENT AS NECESSARY TO ENSURE POSITIVE
CONTRACTOR SHALL SAW-CUT TO PROVIDE SMOOTH TRANSITION AT TIE-IN TO EXISTING 36.
SHOWN ON THE PLANS. STOP BARS SHALL BE INSTALLED AT ALL STREET INTERSECTIONS.
CONTRACTOR SHALL FURNISH AND INSTALL ALL THERMOPLASTIC PAVEMENT MARKINGS AS 35.
CITY OF SHELBY REQUIREMENTS AND RETURN SALVAGED UTILITIES TO THE CITY.
CONTRACTOR SHALL PROTECT AND SALVAGE ALL EXISTING UTILITIES IN ACCORDANCE WITH
CONSTRUCTION PHASES (INCLUDING POWER POLES, TELEPHONE RISERS, ETC.). THE
THE CONTRACTOR SHALL PROTECT ALL FRANCHISE UTILITIES DURING ALL 34.
APPROVAL OF THE CITY.
SHALL THE CONTRACTOR REMOVE OR RELOCATE A STOP OR YIELD SIGN WITHOUT THE
TIME A STREET SIGN IS TO BE REMOVED DUE TO CONSTRUCTION OPERATIONS. AT NO TIME
THE CONTRACTOR SHALL GIVE THE OWNER A MINIMUM OF 5 DAYS NOTICE PRIOR TO THE 33.
OTHERWISE NOTED.
ALL PAVING DIMENSIONS ARE TO EDGE OF PAVEMENT AND/OR FACE OF CURB UNLESS 32.
CONTRACTOR AT HIS EXPENSE UNLESS OTHERWISE SPECIFIED OR AGREED TO BY OWNER.
GRUBBING SHALL BE DISPOSED OF AT A LEGAL DISPOSAL FACILITY OFF SITE BY THE
UNUSABLE EXCAVATED MATERIAL AND ALL WASTE RESULTING FROM SITE CLEARING AND
ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 31.
UNLESS WRITTEN APPROVAL IS OBTAINED FROM THE PROPERTY OWNER.
TO BE REMOVED SHALL BE DISPOSED OF AT A LEGAL DISPOSAL LOCATION OFF SITE,
PROPERTY OWNER OR THE CITY OF SHELBY (FOR R.O.W.) ALL CONSTRUCTION MATERIALS
ON ADJACENT PROPERTIES OR RIGHT-OF-WAY WITHOUT THE PRIOR WRITTEN CONSENT OF THE
CONTRACTOR SHALL NOT STORE MATERIALS, EQUIPMENT OR OTHER CONSTRUCTION ITEMS 30.
APPROVALS BEFORE CONSTRUCTION BEGINS.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND 29.
TO THE PROJECT FREE OF MUD AND DEBRIS FROM THE CONSTRUCTION AT ALL TIMES.
THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND PROPERTIES ADJACENT 28.
ALL TESTING SHALL BE IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS.27.
REMOVE ALL ROCK FROM TOPSOIL IN CULTIVATED AREAS.
MATERIAL AND SHALL BE PLACED ON TOP OF TRENCH BACK FILL. CONTRACTOR SHALL
SIX (6) INCHES. TOPSOIL SHALL BE KEPT SEPARATE FROM GENERAL TRENCH EXCAVATED
SHALL INCLUDE THE TOP SIX (6) INCHES OF TRENCH, UNLESS ROCK DEPTH IS LESS THAN
TOPSOIL REPLACEMENT IS REQUIRED IN ALL AREAS WHERE TOPSOIL EXISTS. TOPSOIL 26.
CONSTRUCTION HOURS.
SPECIFICATIONS. A LIMIT OF 40 LF OF TRENCH MAY BE CLOSED BY PLATES OUTSIDE OF
OF RUTTING AND POTHOLES. REPAIR DAMAGED PAVEMENT IN ACCORDANCE WITH
SHALL BE MAINTAINED BY THE CONTRACTOR TO ENSURE A SMOOTH DRIVING SURFACE FREE
BACKFILL SHALL BE INSTALLED TO THE FINISHED GRADE OF THE EXISTING PAVEMENT AND
EXCEPT DURING DAYLIGHT HOURS AND DURING CONSTRUCTION OPERATIONS. TEMPORARY
ESTABLISHED ROADWAYS. NO OPEN TRENCH WILL BE ALLOWED IN EXISTING PAVEMENT
CONTRACTOR SHALL INSTALL TEMPORARY BACKFILL AS REQUIRED FOR OPEN TRENCH IN 25.
REQUIREMENT BY OWNER OF ELECTRIC LINE.
ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY NATIONAL ELECTRIC CODE AND ANY
CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN VICINITY OF ANY OVERHEAD 24.
SUBSIDIARY TO THE COST OF THE CONTRACT UNLESS OTHERWISE NOTED.
GRASS, AND TREES, AT NO ADDITIONAL COST TO THE OWNER. THIS WORK SHALL BE
PROPERTY, INCLUDING, BUT NOT LIMITED TO, FENCES, BRICKS, WALLS, PAVEMENT,
THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY DAMAGE TO PRIVATE 23.
ON SUNDAY.
TRAVEL LANES AFTER SUNSET EXCEPT AS AUTHORIZED BY THE OWNER. NO WORK IS ALLOWED
WORK SO THAT NO MACHINERY OR EQUIPMENT SHALL BE CLOSER THAN 30 FEET TO ANY
THE CONTRACTOR SHALL NOT COMMENCE WORK BEFORE 7:00AM AND SHALL ARRANGE HIS 22.
BE ALLOWED.
CONSIDERED SUBSIDIARY TO THE PROJECT COST AND NO ADDITIONAL COMPENSATION SHALL
OF PERFORMING ANY WORK ON PRIVATE PROPERTY. DISTRIBUTION OF LETTERS SHALL BE
THE CITY INSPECTOR. THE CONTRACTOR SHALL NOTIFY RESIDENTS 48 HOURS IN ADVANCE
THE TIME FRAME FOR DOING THE WORK. COPIES OF THE LETTER SHALL BE FORWARDED TO
TELEPHONE NUMBERS OF CONTRACTOR CONTACTS, A DESCRIPTION OF WORK TO BE DONE, AND
PRIOR TO BEGINNING WORK ON EACH PROPERTY. THIS LETTER SHALL INCLUDE NAMES AND
THE CONTRACTOR SHALL DISTRIBUTE LETTERS TO ALL AFFECTED PROPERTY OWNERS 21.
COMPROMISED WATER QUALITY ENTERING THE DISTRIBUTION SYSTEM.
CHANGED CONDITION CAUSED BY CONSTRUCTION ACTIVITIES THAT MAY RESULT IN
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CITY INSPECTOR OF ANY DAMAGE OR 20.
ABANDON EXISTING WATER LINE.
CLOSE VALVE ON EXISTING ON SOUTH SIDE OF TEE AT STA 10+00. CUT, CAP, AND 9.
SERVICE.
CUT AND CONNECT PROPOSED WATERLINE AT STA 27+70. AND PLACE PROPOSED LINE IN 8.
EXISTING VALVE AT CLEARWATER SERVICE TEE LABELED EV-2 ON PLANS.
CITY TO LOCATE AND CLOSE EXISTING VALVE AT 639 WASHBURN SWITCH ROAD AND 7.
MOVE ALL SERVICES INTO NEW WATER LINE.6.
PLACE NEW WATER LINE SEGMENT IN SERVICE.
AT STA. 27+70. PRESSURE TEST, DISINFECT, AND UPON AUTHORIZATION,
CONSTRUCT THE NEW 16" DI WATERLINE AS SHOWN IN PLANS THROUGH ISOLATION VALVE 5.
32618 (SHEET W-04). PLACE EXISTING WATER LINE BACK IN SERVICE.
CUT-IN TWO 16"X16" TEES AND GATE VALVES AT STA 10+00 AND ADJACENT TO PARCEL 4.
CLEARWATER SERVICE TEE LABELED EV-1 ON PLANS.
CITY TO LOCATE AND CLOSE EXISTING VALVES AT RUSTLING WIND DRIVE AND 3.
PIPING. INSTALL THRUST COLLAR ON EXISTING 16" WATER LINE AT STA 10+00 AND 27+70.
ALL THRUST BLOCKING SHALL BE COMPLETED AND CURED PRIOR TO CUTTING ASSOCIATED 2.
72 HOURS PRIOR TO ANY SERVICE INTERRUPTIONS.
COORDINATE ALL STEPS WITH CITY OF SHELBY UTILITY DEPARTMENT. NOTIFY CITY1.
WATER LINE CONSTRUCTION SEQUENCING
R-5849 UC-3
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
(POLYWRAPPED). POLYETHYLENE ENCASEMENT SHALL MEET AWWA C105 STANDARDS.
13. ALL DUCTILE IRON PIPE SHALL BE RESTRAINED JOINT AND POLYETHYLENE ENCASED
PIPE PRIOR TO TIE IN.
TO TIE IN. IF UNRESTRAINED, CONTRACTOR SHALL INSTALL THRUST COLLAR ON EXISTING
ON THE SERVICE. CONTRACTOR TO VERIFY RESTRAINT ON EXISTING SERVICE LINES PRIOR
WATER MAIN. ALL SERVICE CONNECTIONS SHALL INCLUDE AN ISOLATION VALVE INSTALLED
CONTRACTOR TO FIELD VERIFY SIZES OF ALL SERVICES TO BE CONNECTED TO NEW 12.
FOR CONNECTIONS TO EXISTING ASBESTOS CEMENT PIPES.
CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE AWWA, NCDEQ, AND ASTM STANDARDS 11.
ACCORDANCE WITH CITY OF SHELBY STANDARD DETAIL 6.19.
HORIZONTALLY FROM THE CENTERLINE OF THE WASTEWATER MAIN OR LATERAL. INSTALL IN
JOINTS OF THE WATER LINE PIPE ARE EQUIDISTANT AND AT LEAST TEN FEET
LINE PIPE SHALL BE CENTERED OVER THE WASTEWATER MAIN OR LATERAL SUCH THAT THE
MAIN OR LATERAL WITH THE NEW POTABLE WATER LINE PIPE, ONE SEGMENT OF THE WATER
WHERE THE CONTRACTOR CROSSES AN EXISTING, NON-PRESSURE RATED WASTEWATER 10.
FITTINGS WHERE POSSIBLE.
THE CONTRACTOR SHALL INSTALL A FULL JOINT OF PIPE ON BOTH SIDES OF ALL 9.
OTHERWISE).
WATER PIPE SHALL HAVE A MINIMUM OF 42 INCHES OF COVER (UNLESS NOTED 8.
BELOW GROUND SHALL BE POLYETHYLENE-ENCASED IN ACCORDANCE WITH AWWA C-509.
ALL VALVES, FIRE HYDRANTS, FITTINGS, AND OTHER METAL APPURTENANCES LOCATED 7.
APPROVED EQUAL.
BLOCKED. MECHANICAL RESTRAINT SHALL BE BY EBAA MEGALUG FOR DUCTILE IRON OR
ALL TEES, BENDS, REDUCERS, AND PLUGS SHALL BE MECHANICALLY RESTRAINED AND 6.
THE 16-INCH WATER LINE SHALL BE DUCTILE IRON, PRESSURE CLASS 250.5.
COST TO THE PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED.
PLUGGED AND ABANDONED IN PLACE. THIS WORK SHALL BE CONSIDERED AS A SUBSIDIARY
THE ENDS OF ALL EXISTING WATER MAINS THAT ARE CUT, BUT NOT REMOVED, SHALL BE 4.
RECOMMENDED BY THE PIPE MANUFACTURER.
BENDS AND 50% OF THE MAXIMUM ALLOWABLE JOINT DEFLECTIONS AND MINIMUM RADIUS AS
NON-STANDARD VERTICAL AND HORIZONTAL BENDS SHALL BE INSTALLED USING STANDARD
CONTRACTOR SHALL INSTALL STANDARD BENDS AT LOCATIONS SHOWN. ALL 3.
SHALL BE ALLOWED.
SHALL BE CONSIDERED SUBSIDIARY TO THE PROJECT AND NO ADDITIONAL COMPENSATION
CONSTRUCTION BY USE OF TEMPORARY METHODS APPROVED BY THE OWNER. THIS WORK
THE CONTRACTOR SHALL MAINTAIN WATER SERVICE TO ALL CUSTOMERS THROUGHOUT 2.
THE INSTALLATION OF ANY PIPE.
THE CONTRACTOR SHALL VERIFY THE ELEVATION OF ALL UTILITY CROSSINGS PRIOR TO 1.
WATER LINE NOTES
MAILBOXES MUST MEET POST OFFICE STANDARDS
BE ALLOWED. THE LOCATION OF MAILBOXES IS TO BE DETERMINED BY PROPERTY OWNERS.
CONSIDERED A SUBSIDIARY COST TO THE PROJECT AND NO ADDITIONAL COMPENSATION WILL
TEMPORARY MAILBOXES SHALL BE PROVIDED AS REQUIRED. THIS ITEM SHALL BE 41.
TO THE CITY PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL VIDEO THE ENTIRE PROJECT CORRIDOR AND PROVIDE A COPY OF THE CD
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO PRIVATE PROPERTY. THE 40.
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
R-5849 UC-4A
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
TRENCH EXCAVATION LIMITS
DIAMETER
INTERNAL
OF PIPE
W
WIDTH OF TRENCH
MAX W=MIN
4"-6"
8"-10"
12"
14"-16"
18"
20",21"
24"
27"
30"
36"
42"
48"
54"
60"
72"
78"
84"
90"
96"
108"
3’-9"
3’-9"
3’-9"
4’-2"
4’-4"
4’-8"
4’-11"
5’-9"
6’-7"
7’-4"
8’-2"
8’-9"
9’-4"
9’-10"
11’-0"
11’-8"
12’-0"
12’-6"
13’-0"
14’-0"
2’-0"
2’-2"
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
O.D.+2’
DEPTH
OF
CUT
S
MAXIMUM PAVEMENT
REPLACEMENT WIDTH
0-6’
>6-8’
>8-10’
>10-12’
S=W+4’
S=W+8’
S=W+12’
S=W+16’
W = TRENCH WIDTH AT BOTTOM OF
PIPE. TRENCH SIDE SLOPES SHALL
BE IN ACCORDANCE WITH OSHA
REQUIREMENTS.
>12-14’ S=W+20’
>14-16’ S=W+24’
>16-18’ S=W+28’
>18’ S=W+32’
PIPE
SIZE
(IN)
CONCRETE THRUST BLOCK SCHEDULE*
BEND DESIGN
PRESSURE
(PSI)
90 /TEE 45 22 1/2 11 1/4 &o oo
H L LH H L H
o
L
350
350
350
350
350
350
350
350
350
350
2.0
2.6
3.2
3.8
4.4
5.0
5.6
6.2
7.4
9.1
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
24.0
30.0
2.6
3.5
4.2
5.0
5.8
6.6
7.4
8.2
9.9
12.2
5.3
7.0
8.5
10.1
11.7
13.3
14.9
16.5
19.8
24.5
1.9
2.5
3.1
3.7
4.3
4.9
5.5
6.1
7.2
9.0
3.9
5.1
6.3
7.5
8.6
9.8
11.0
12.2
14.5
18.0
1.4
1.8
2.2
2.6
3.1
3.5
3.9
4.3
5.2
6.4
2.8
3.7
4.5
5.3
6.2
7.0
7.9
8.7
10.4
12.9
1.0
1.3
1.6
1.9
2.2
2.5
2.8
3.1
3.7
4.5
5 5/8o
*
STRENGTH OF 2000 PSF USING SF OF 1.5
BASED ON AVERAGE SOIL PASSIVE BEARING
8.2
7.2
6.3
5.4
23.1
20.4
17.9
15.4
11.5
10.2
8.9
7.7
32.4
28.6
25.0
21.6
16.2
14.3
12.5
10.8
44.0
38.8
34.0
29.3
22.0
19.4
17.0
14.6
54.0
48.0
42.0
36.0
16.4
14.5
12.7
10.9 350
350
350
350
350
35017.6
18.7
60.0
64.0
23.5
25.1
47.1
50.2
17.3
18.4
34.7
36.9
12.4
13.2
24.8
26.4
8.8
9.3
MINA
MINA
DIA
PIP
EV
ARIE
S
MIN
A
ELEVATION
THRUST COLLAR
3" CLR (TYP)
THRUST COLLAR
3" CLR (TYP)
12-Y BARS
(SPACED AS SHOWN)
TYPICAL CONCRETE THRUST
COLLAR. MIN OF (A") INTO
UNDISTURBED MATERIAL
ALL AROUND
TRENCH BOTTOM
B
MIN
TYPICAL CONCRETE THRUST
COLLAR. MIN OF (A") INTO
UNDISTURBED SOIL
6-X BARS
EACH WAY, EACH FACE
12-Y BARS
(SPACED AS SHOWN)
TRENCH
WIDTH
PIPE SIZE X BARS Y BARS A B
6"-36"
42"& >
#5
#6
1’-4" 1’-7"
1’-8" 1’-9"#6
#5
45
CLASS B
CONCRETE
1/2
H1/
2H
H
TYPICAL SECTION
TEE OR BEND
UNDISTURBED
EARTH
W 12"
1/2 L
1/2 L
UNDISTURBED
EARTH
CLASS B
CONCRETE
PLAN - BENDPLAN - TEE
6"
MIN
1/2 L 1/2 L
12" T
YPIC
AL
CLASS B
CONCRETE
UNDISTURBED
EARTH
THRUST BLOCKS(SEE NOTE 1)
6.20
NO.THRUST BLOCK DETAIL
R-5849 UC-4B
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
1 INCH = FEETGRAPHIC SCALE
50 0 25 50 100 150
50
0
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
S
S
S
S
S
S
S
S
S
S
02
02
016
024 +
75
0202
00
01
0101
00
01
02
02
01
01 0
1
00
02
02
02
10
15
20
24" CMP
24"
RC
P
15" RCP
24"
RC
P
24" RCP
15" RCP
24" CMP
CT
HH
T
HH
S
HH
S
CONC
PO
ST
S(11) 3.5
" M
TL
TEST WIRE
24"
ST
L
7"
BS
T
CU
RB
RR SIG
48"
CH
LW/
LT
W/
LT
72"
CH
L
W/ 3S
BW
SPRINKLER
AUTOGATE
GA
TE
6"
CH
L
S
S
S
5’ CONC
JB
18" CMP
PL
AN
TE
R
S
1SBD
LT
21’ CONC HW
18"
PV
C48 S
T
(2) 24"
RC
P
12’ S
OIL
4’ CONC HW
DI
DI I/
A
DI
9.46’
7.77’
RE
BA
R
RE
BA
R
RE
BA
R
RE
BA
R
RE
BA
R
EIP
S 05°15’58" E
N 74°5
0’2
0"
E
DB 1696 PG 845
CLEARWATER PAPER CORPORATION
N 74°18’18"
E 14
9.8
5’ (EIP-
CO
R)
N 74°18’18"
E 14
9.8
5’ (EIP-
CO
R)
N 74°5
4’2
3"
E 17
9.4
7’ (R
EB
AR-
RE
BA
R)
152.4
1’ (
RW-
RE
BA
R)
520.67’ (REBAR-COR)
465.13’ (RW-COR)
EXISTING CSX R/W
100.0
0’
EXISTING CSX R/W
EXISTING NS R/W
50.0
0’
EXISTING R/W
EXISTING R/W
60.0
0’
EIP
S 74°4
2’5
5"
W405.3
2’ (EIP-EIP)
400.9
5’ (R
W-EIP)
JJI LIG
HTIN
G
GR
OU
P, IN
C.
DB 1125 P
G 2356
BS
T
BS
T
7"
BS
T
CU
RB
ABANDONED
EIP
POSTS
(13) 3.5"
MT
L
18" CMP
NORFOLK SOUTHERN
CSX TRANSPORTATION
8"
DI
8" VCP
6"VCP
8"
VC
P
CUS
TO
ME
R
FIR
ST
ST
10’ B
ST
6" STEEL
6" STEEL
6" STEEL
16"CIP
16"CIP
16"CIP
200PR
200PR
200PR
2"S
TE
EL
2"S
TE
EL
2"STEEL
2"S
TE
EL
2"STEEL
10"DIP
10"DIP
10"DIP
4"DIP
10"DIP
10"CIP
50 P
R
100 PR
100 PR
100 P
R
SP
LIC
EB
OX
LT
LT
T
LT
HH
LT
SE
RVIC
E
4"S
TL
100
PR
24 S
TR
AN
D
12 S
TR
AN
D
16"
DIP
DB 1678 PG 36CLEVELAND COUNTY
100.0
0’
CLEARWATER PAPER CORPORATION
DB 1696 PG 845
6’ CONC HW
WIRETESTGAS
VALVES
IRRIGATION
12 STR
24 STR
CLEARWATER PAPER CORPORATION
DB 1642 PG 197
CAPITAL FUNDS, INC.
CORPORATION BOOK 18 PG 604
BOX
BATTERY
BOX
RR SIG
DI
GR
OU
ND
LT
FL
AG
PO
LE
BST VARIES
SR 1313 WASHBURN SWITCH RD
SWITCHOF
POINT
FROGOF
POINT
CONSTRUCTIONOF
POINT
C
F
F
F
F
F
F
F
F
C
F
C
C
C
C
C
F
C CC
CC
F
CC
CC
F
C
F
C
F
C
F
C
F
C
F
C
F F F
C C
C
C
F
F
F
FF
F
F
C
C
C
CC
CC
FT
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
NAD 83/ 2011
MA
TC
H
TO
SH
EET U
C-6
MA
TC
H
LIN
E STA. 22+
00.0
0
PLAN
R-5849 UC-5
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
AND TYPE OF FITTINGS WILL VARY BASED ON FIELD CONDITIONS.
FITTINGS ON THIS SHEET IS 4,620 POUNDS. THE ACTUAL QUANTITY
THE ESTIMATED QUANTITY OF DUCTILE IRON WATER PIPE
45.0
0’
EX.
R/W
01
02
03
04
15+00
20+00IV
IV
(BY OTHERS)
W/ 24" SANITARY SEWER
30" CASING
VALVE
EXISTING 16"
EV-2
VALVE
EXISTING 16"
EV-1
IV
IV
IV IV
IV
6.0’ TYP 16.7’
STA. 10+00.00
CONNECT TO EXISTING 16" MAIN
SHT. WD-02, & SHT. W-01 FOR SEQUENCING)
(SEE DETAIL 6.02 SHT WD-01, DETAIL 6.20
2 - 16" ISOLATION VALVES
1 - 16" X 16" TEE
1 - THRUST COLLAR
BEFORE CONNECTING
INSTALL THRUST COLLAR ON EX. PIPE
ABANDONED IN PLACE
WATERLINE TO BE
1195 LF EXIST. 16" CIP
6.20 SHT. WD-02)
(SEE SHT. W-01 FOR SEQUENCING & DETAIL
53 LF OF 16" RJ DIP
3 - 16" ISOLATION VALVES
1 - 16" X 16" TEE
CONNECT TO EXISTING 16" SERVICE MAIN
STA. 14+29.31
6.0’ TYP 14.0’
DETAIL 6.20 SHT. WD-02)
(SEE SHT. W-01 FOR SEQUENCING &
89 LF OF 0.25" THICK 20" STEEL CASING PIPE
120 LF OF 10" RJ DIP
1 - 10" GATE VALVE
1 - 16" ISOLATION VALVE
1 - 16" X 10" TEE WITH THRUST BLOCK
CONNECT TO EXISTING 10" SERVICE LINE
STA. 19+95.71
6.0’ TYP
16.6’
(BY OTHERS)
PROPOSED 6" GAS
(BY OTHERS)
PROPOSED 6" GAS
(BY OTHERS)
PROPOSED 2" GAS
16" DIP RJ PC-250 WATER MAIN
INSTALL 1,200 LF
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
1 INCH = FEETGRAPHIC SCALE
50 0 25 50 100 150
50
0
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
18"
RC
P
15" RCP
15" RCP
HW
5’ CONCT
WIRE
TEST
REGULATOR
FIELD
RE
GU
LA
TO
R
FIE
LD
20’ B
ST
20’ B
ST
19’ B
ST
EXISTING CSX R/W
100.0
0’
EXISTING R/W
30.0
0’
6" STEEL
16"CIP
50
PR
200PR
CO
AXIA
LC
OA
XIA
L
SE
RVIC
E
2 PR
50 PR
2"STL
8"
DIP
C
6"STEEL
b
n
G-F
AR
M
CORPORATION BOOK 18 PG 604
CAPITAL FUNDS, INC.
W\LT
BOX
SIG
RR
PLANTER
DB 1666 PG 1832
SUSAN SEAL ENTERPRISES, LLC
SEAL WIRE COMPANY
DB 17G PG 118
JJI LIGHTING GROUP, INC.
DB 1125 PG 2356
W\LT
W\LT
W\LT
GTD
GTD
GTDGTD
24" RC
P-IV
STANDARD BASE DITCH
-L- STA. 29+72 LT
DETAIL 2
18"
18"DI
SPECIAL CUT DITCH
FROM -L- STA. 25+50 TO STA. 29+72 RT
DETAIL 1
O
C C CC
C
C
CC
C
F
C
F
C
F
C
C
FF
FF
CC
C
CC
FF
02
02
03
04
29’ 04
004
-L-
2’ FDPS
2’ FDPS
01
010001
02
20’R 20’R
-L- STA. 29+90.00END PROJECT 47336
30
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
RE
VISIO
NS
8/17/99
NAD 83/ 2011
PLAN
MA
TC
H
TO
SH
EET U
C-5
MA
TC
H
LIN
E STA. 22+
00.0
0
15
R-5849 UC-6
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
AND TYPE OF FITTINGS WILL VARY BASED ON FIELD CONDITIONS.
FITTINGS ON THIS SHEET IS 3,320 POUNDS. THE ACTUAL QUANTITY
THE ESTIMATED QUANTITY OF DUCTILE IRON WATER PIPE
04
03
25+00
IV
IV
IV
ABANDONED IN PLACE
WATERLINE TO BE
563 LF EXIST. 16" CIP
2" EXISTING SERVICE
CONNECT TO
CONNECT TO EXISTING 16" MAIN
STA. 27+70.84
SHT. WD-02, & SHT. W-01 FOR SEQUENCING)
(SEE DETAIL 6.02 SHT WD-01, DETAIL 6.20
1 - 16" ISOLATION VALVE
1 - THRUST COLLAR
INSTALL THRUST COLLAR ON EX. PIPE BEFORE CONNECTING
STA. 22+15.94
CONNECT TO EXISTING 8" SERVICE LINE
1 - 16" X 8" TEE WITH THRUST BLOCK
1 - 8" ISOLATION VALVE
40 LF 8" RJ DIP
(SEE SHT. W-01 FOR SEQUENCING & DETAIL
6.20 SHT. WD-02)
6.0’ TYP
20.0’
16" DIP RJ PC-250 WATER MAIN
INSTALL 571 LF
(SEE DETAIL 6.02 SHT WD-01)
14 LF 6" RJ DIP
1 - 6" ISOLATION VALVE
1 - 16" X 6" TEE
CONNECT TO EXISTING SERVICE MAIN
STA. 24+64.63
(BY OTHERS)
PROPOSED 6" GAS
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
8/17/99
PLAN
NAD 83/ 2011
47336 UC-7
15+00
20+00IV
IV
25+00
IV
IV
IV
IV
IV
IV
IV
IV
1 INCH = FEETGRAPHIC SCALE
0 400 6000 100 200200
200
STA. 27+70.84
CONNECT TO EXISTING 16" MAIN
STA. 10+00.00
CONNECT TO EXISTING 16" MAIN
VALVE
EXISTING 16"
EV-1
VALVE
EXISTING 16"
EV-2 PC-250 WATER MAIN
PROPOSED 16" DIP
WASHBURN SWITCH RD.
WASHBURN S
WITCH R
D.
RUS
TLIN
G W
IND D
R.
ON 16" WATER MAIN
EXISTING 16" VALVE
N.T.S.
ON 16" WATER MAIN
EXISTING 16" VALVE
ENGINEER
UTILITY CONSTRUCTION
APPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
AND TYPE OF FITTINGS WILL VARY BASED ON FIELD CONDITIONS.
FITTINGS ON THIS SHEET IS 1,490 POUNDS. THE ACTUAL QUANTITY
THE ESTIMATED QUANTITY OF DUCTILE IRON WATER PIPE
CONNECT TO EXISTING 16" MAIN
E 1,221,253.2579
N 581,580.2782
(SEE SHT. W-01 FOR SEQUENCING)
1 - 16" CAP
1 - SOLID SLEEVE
3 - 16" ISOLATION VALVES
1 - 16" X 16" TEE
1 - THRUST COLLAR
BEFORE CONNECTING
INSTALL THRUST COLLAR ON EX. PIPE
DocuSign Envelope ID: C4A55B0D-1B55-45B5-8A60-483C945D1344
10/9/2017
NO
R
TH
CAROLIN
AO
SEAL
AN
ISSEFO
R
027670
REENGN
I
E
P
L
MATT
HEW A. SHOES
MIT
H
5/28/99
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
R-5849 UC-8
10 11 12 13 14 15 16 17 18 19 20 21 22
840
850
860
870
880
890 890
880
870
860
850
840
840
850
860
870
880
890
900
22 23 24 25 26 27
840
850
860
870
880
890
900
PROFILE
VERT. 1"= 10’
SCALE: HORIZ. 1"= 50’
PROFILE
VERT. 1"= 10’
SCALE: HORIZ. 1"= 50’
ENGINEER
UTILITY CONSTRUCTIONAPPROVED
WORKS DEPARTMENT
CITY OF SHELBY PUBLIC
ENGINEERING
STORM WATER
TRANSPORTATION
DATE
DATE
DATE
DATE
18" MIN. CLR.
(TYP)
3.5’ MIN COVER
CASING (BY OTHERS)
PROP 30" SEWER
SE
E
DE
TAIL 6.19 S
HT. W
D-02
MIN. 18"
CLR.
PR
OP. S
EW
ER
LIN
E
CR
OS
SIN
G
EX. GROUND
EX. 16"
16" S
ER
VIC
E
MAIN
CO
NN
EC
T
TO
EXIS
TIN
G
16" S
ER
VIC
E
MAIN
CO
NN
EC
T
TO
EXIS
TIN
G
ST
A. 14+46.12
EXIS
TIN
G
CO
NN
EC
T
TO
ST
A. 19+82.0
4
SEE SHEET UC-5 FOR PLAN
16" RJ DIP PC-250 WM 16" RJ DIP
PC-250 WM
EX. GROUND
EX. 16"
3.5’ MIN COVER (TYP)
8" S
ER
VIC
E
LIN
E
CO
NN
EC
T
TO
EXIS
TIN
G
ST
A. 2
2+17.7
5
8" S
ER
VIC
E
MAIN
CO
NN
EC
T
TO
EXIS
TIN
G
16" S
ER
VIC
E
MAIN
CO
NN
EC
T
TO
EXIS
TIN
G
SEE SHEET UC-6 FOR PLAN
16" RJ DIP PC-250 WM