PearlridgeRail Station Community
Workshop
October 15, 2009Pearl Ridge Elementary School
Agenda
Project Overview & ScheduleStation LocationPreliminary Station DesignCommunity Ideas & Breakout SessionsSummary of Breakout SessionsNext Steps – Future Meetings
Pearlridge Station
Travel Times from Pearlridge
Destination Travel Time
Kapolei 18 minutes
Leeward Community College 7 minutes
Airport 8 minutes
Downtown 20 minutes
Ala Moana Center 24 minutes
Project Schedule
Fall 2009: Release of Final Environmental Impact Statement
Fall 2009: Award design/build contract for first guideway segment
Fall 2009: Federal Transit Administration issues Record of Decision
December 2009: Start construction of elevated guideway
Project Schedule
Late 2012: Initial service begins Waipahu; service expands
Late 2013: Start construction of Pearlridge Station
Early 2017: Service on Kamehameha Highway
Spring 2019: Start of full service between East Kapolei and Ala Moana Center
Elevated Guideway Simulation
Kamehameha Highway at Kaonohi Street, looking makai
Community Ideas from Pearlridge Station Workshop
#1
Summary of Community Ideas
• Honor area’s agriculture past and present• Sugar cane and water cress motifs• Ample sun screens and shade• Roof design inspired by nearby buildings
Summary of Community Ideas
• Sheet metal roofs• Discourage graffiti• Open-air design• Cost effective to maintain• ADA accessible
Inspirations
Inspirations
Typical Transit Station
Site Plan
Preliminary Station Design
Preliminary Station Design
Preliminary Station Design
Preliminary Station Design
Preliminary Station Design
Breakout Sessions
Breakout Summaries
Next Steps
Pearl Ridge Elementary
School Cafeteria
December 2, 2009
6:30 to 9 p.m.