+ All Categories
Home > Technology > Top 10 Business Reasons for ALM

Top 10 Business Reasons for ALM

Date post: 20-Aug-2015
Category:
Upload: imaginet
View: 529 times
Download: 0 times
Share this document with a friend
Popular Tags:
45
Top 10 Business Benefits of Application Lifecycle Management (ALM) Imaginet Resources Corp. www.imaginet.com
Transcript

Top 10 Business Benefits of Application Lifecycle Management (ALM)

Imaginet Resources Corp.www.imaginet.com

Agenda

ALM and the Business

Application Lifecycle and ALM

ALM RevisitedConclusion

Is ALM the same as SDLC?

What is a “Software Development Lifecycle?”But an application lives before an after the development efforts…And what about the term “cycle”?

Require-ments Design Code Test Deploy

Ideas Projects

Operate Retire

(A Whiteboard View)

And the Cycle Continues

The Modern Application Lifecycle

References:- http://en.wikipedia.org/wiki/Application_lifecycle_management- http://www.gartner.com/technology/reprints.do?id=1-1ASCXON&ct=120606&st=sb- http://www.microsoft.com/global/applicationplatform/en/us/RenderingAssets/Whitepapers/What%20is%20Application%20Lifecycle%20Management.pdf- http://www.sdtimes.com/blog/post/2009/08/12/ALM-A-Bastardized-Term.aspx

And What is Application Lifecycle Management?

The application life cycle management (ALM) tool market

is focused on the planning and governance activities of

the software development life cycle (SDLC). Traditionally,

this has been the combination of software change and

configuration management (SCCM), requirements management and quality management. [Gartner]

Application Lifecycle Management

(ALM) is a continuous process of

managing the life of an application

through governance, development

and maintenance. ALM is the

marriage of business management

to software engineering made

possible by tools that facilitate and

integrate requirements

management, architecture, coding,

testing, tracking, and release

management. [Wikipedia]…an application’s lifecycle

includes the entire time during

which an organization is spending

money on this asset, from the

initial idea to the end of the

application’s life.

[Chappell & Associates]

…to mange an entire

development project on a

unified basis, from requirements formation

all the way to sending

that thing out the door…

[Jeff Feinman, SD Times]

Agenda

ALM and the Business

Application Lifecycle and ALM

ALM RevisitedConclusion

10. Provides an Enterprise View

• What:– Provides a consistent and meaningful view of

development project work and status

• Why:– Provide decision makers with:

• A current view of development project investments• A consistent view between disparate teams and projects• Information supporting future investment decisions

• How:– Standard processes and terminology– Automatic collection of metrics– Consolidated metrics repository

9. Enhances Team Satisfaction

• What:– Improves satisfaction of development team

with their role in the organization.

• Why:– Improved morale reduces turnover and associated costs– Happy employees are more productive– Motivated employees are more likely to make their own

investments in an organization

• How:– Make teams part of the business and visa versa– Empower development teams to make a difference– Invest in tools and processes that acknowledge team value

8. Reduces Risk

• What:– Provides the information needed to identify,

understand, track and mitigate development risks

• Why:– Minimize unexpected ‘surprises’– Reduce costly mistakes– Improves release consistency and quality

• How:– Monitor project status from all angles– Identify trends– Proactively manage risks– Adopt iterative development practices

7. Improves Resource Utilization

• What:– Allows more efficient workflow for team members

(Less time ‘thrashing’ and more time delivering)– Supports better usage of development systems

(e.g., development and test environments)

• Why:– Increases business value delivered without increasing costs

• How:– Adopt a continuous improvement mindset– Visualize your workflow and monitor work in progress– Use modern best practices and tools to improve efficiency– Use virtualization to improve dev/test system utilization

6. Reduces Delivery Cycle Time

• What:– Decrease the time it takes for the team to deliver

an application release

• Why:– Increase the flow of business value– Improve the potential for stakeholder feedback

• How:– Adopt agile practices to emphasize a continuous flow of value– Reduce churn from misunderstood requirements– Use tools to automate mundane delivery processes

5. Minimizes Downtime

• What:– Reduce the Mean Time To Repair (MTTR) for

feedback reported from a production environment

• Why:– Down time is costly!– Dissatisfied users

• How:– Close the gap between development and operations– Capture meaningful diagnostic data in production– Use tools to streamline communications

4. Increases Responsiveness

• What:– Improve the ability for the team to respond to

requests– Streamline communications at all levels of the

application lifecycle

• Why:– Drive delivery of business value based on current needs– Reduce MTTR for defects

• How:– Maintain a consistent backlog with meaningful priorities– Use processes and tools to improve communications with

stakeholders and operations– Ensure teams have committed stakeholder involvement

3. Improves Efficiency

• What:– Reduce the time, effort and cost associated with

processes that do not add value

• Why:– Reducing waste has the side effects of improving

• How:– Model current workflow practices – Visualize work in progress and determine limits– Invest in ongoing process improvement– Adopt modern best practices and tools

2. Reduces Development Costs

• What:– Spend less money to achieve equivalent

or better results

• Why:– Improve profitability– Free up resources to address additional business needs

• How:– Adopt ALM tools and practices to

• …improve efficiency, quality, responsiveness and resource utilization and

• …reduce cycle time and risk.

$

1. Maximizes Stakeholder Satisfaction

• What:– Understand and anticipate business needs– Deliver what is needed on time and within budget

• Why:– Satisfied stakeholders indicate that application development

is successfully supporting the business

• How:– Consistent and frequent feedback from stakeholder(s)– Correct course as needed to ensure application meets needs– Embrace application quality– Foster open and transparent communications with the

business

Agenda

ALM and the Business

Application Lifecycle and ALM

ALM RevisitedConclusion

References:- http://en.wikipedia.org/wiki/Application_lifecycle_management- http://www.gartner.com/technology/reprints.do?id=1-1ASCXON&ct=120606&st=sb- http://www.microsoft.com/global/applicationplatform/en/us/RenderingAssets/Whitepapers/What%20is%20Application%20Lifecycle%20Management.pdf- http://www.sdtimes.com/blog/post/2009/08/12/ALM-A-Bastardized-Term.aspx

ALM is Enabled by…

Application Lifecycle Management

(ALM) is a continuous process of

managing the life of an application

through governance, development

and maintenance. ALM is the

marriage of business management

to software engineering made

possible by tools that facilitate and

integrate requirements

management, architecture, coding,

testing, tracking, and release

management. [Wikipedia]…an application’s lifecycle

includes the entire time during

which an organization is spending

money on this asset, from the

initial idea to the end of the

application’s life.

[Chappell & Associates]

…to mange an entire

development project on a

unified basis, from requirements formation

all the way to sending

that thing out the door…

[Jeff Feinman, SD Times]

The application life cycle management (ALM) tool market

is focused on the planning and governance activities of

the software development life cycle (SDLC). Traditionally,

this has been the combination of software change and

configuration management (SCCM), requirements management and quality management. [Gartner]

PracticesAnd Tool

Microsoft’s ALM Solution

http://www.gartner.com/technology/reprints.do?id=1-1ASCXON&ct=120606&st=sb

Business Value and ALM Practices and Tools

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

Business Value and ALM Practices and Tools

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Provides an Enterprise View

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Enhances Team Satisfaction

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Reduces Risk

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Improves Resource Utilization

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Reduces Delivery Cycle Time

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboard

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Minimizes Downtime

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Increases Responsiveness

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Improves Efficiency

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Reduces Development Costs

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

ALM Maximizes Stakeholder Satisfaction

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

$

Maximizes Stakeholder Satisfaction

Reduces Development Costs

Improves Efficiency

Increases Responsiveness

Minimizes Downtime

Reduces Delivery Cycle Time

Improves Resource Utilization

Reduces Risk

Enhances Team Satisfaction

Provides an Enterprise View

• Common vocabulary• Consolidated &

Consistent Information• Backlog Management• Storyboarding• Team Mindset• Requirements feedback• Iterative Development• Agile Planning• Automated Builds

• Capacity Management• Integrated Team• Quality Mindset• Requirements driven• Transparency• Stakeholder Feedback• Daily meetings• Current information• Quality Assurance• Rich communications

• Test Environment Management

• Performance Testing• Automated Deployment• Automated Testing• Continuous Delivery• Continuous Feedback• Continuous

Improvement• Dev/Ops Coordination

Team Foundation Server• Backlog Management• Capacity Management• Kanban Board• Agile Taskboard• Integrated Reporting• Work Item Tracking• Team Foundation Build• Alerts• Dashboards

PowerPoint Storyboarding

Visual Studio 2012• Integrated ALM• Architecture tools• My Work• Suspend/Resume• Unit Testing• Fakes• Coded UI Testing• Load Testing• Code Metrics• Code Clone Analysis• IntelliTrace

Microsoft Test Manager• Requirements Suites• Manual Testing• Exploratory Testing• Rich Defect Tracking• Lab Management• Test Impact Analysis

Feedback Client

System Center 2012

ALM Practices and Tools

Agenda

ALM and the Business

Application Lifecycle and ALM

ALM RevisitedConclusion

Summary

• ALM includes the tools and practices required to proactively manage an application’s lifecycle

• ALM can help at the business level in many ways, including:– Maximizes Stakeholder Satisfaction– Reduces Development Costs– Improves Efficiency– Increases Responsiveness– Minimizes Downtime– Reduces Delivery Cycle Time– Improves Resource Utilization– Reduces Risk– Enhances Team Satisfaction– Provides and Enterprise View

• Microsoft provides best-in-breed tools to help your business enjoy the benefits of ALM

Questions?

Want to know more...?

Imaginet’s New Visual Studio 2012 Website!

http://visualstudio.imaginet.com

Visit Imaginet’s new Visual Studio 2012 website, your one-stop hub for all your Visual Studio 2012 needs!

For attendees of today’s session that fill out the survey

FREE Imaginet On DemandWeb Training Subscription Offer

Complete our Post-Webcast survey, and receive 1 free Imaginet On Demand web training subscription, good for 1 person for 1 month!! The survey will be emailed to you immediately after this webcast is over.

What is Imaginet On Demand? Imaginet is proud to announce our newest web-based training program called Imaginet On Demand, your source for the best Application Lifecycle Management (ALM) training on the internet. Imaginet On Demand is a subscription-based training program centric to the Visual Studio ALM tools, including Visual Studio, Team Foundation Server (TFS), Microsoft Test Manager, and Microsoft Visual Studio Lab Management. Learn the new tools of Visual Studio at your pace, from wherever you want. It's that simple!

Imaginet’s New Blog Keeps You In The Know

http://blog.imaginet.com

Stay up to speed on the latest news from Imaginet, Microsoft, Visual Studio, and the entire software development world.

Upcoming Class – Tester Training with VS 2012

This four-day instructor-led course provides students with the knowledge and skills to use the latest testing tools provided by Visual Studio 2012 to support a variety of different testing needs (manual and automated).

Date: March 11-15, 2013Location: Dallas (Irving, TX)Price: $2375/student

Registration link will be included in our follow-up email later today!

Testers Training Using Visual Studio 2012 ALM Tools

(4 Days Class)

Need Help with YOUR Application Lifecycle Management?

• Assess the current state of maturity of software development at your company

• Develop a plan and roadmap for improving software development practices

• At the completion of the ALM Workshop, your organization will have a better understanding of not only where you are today, but the steps you can take to improve your software development, management, configuration, and quality practices to meet your goals.

Imaginet’s ALM Assessment & Envisioning Workshop

Interested? Just email us at [email protected].

Top Gun Academy Training Classes

• Other Imaginet Training Classes– ALM

• Microsoft Visual Studio & TFS 2012 – Skills Upgrade (2 days)• Overview Training with Microsoft Visual Studio 2012 ALM Tools (4 days)• Overview Training with Microsoft Visual Studio 2010 ALM Tools (4 days)• Testers Training with Microsoft Visual Studio 2012 ALM Tools (4 days)• Testers Training with Microsoft Visual Studio 2010 ALM Tools (4 days)• Developers Training with Microsoft Visual Studio 2012 ALM Tools (4 days)• Developers Training with Microsoft Visual Studio 2010 ALM Tools (4 days)• Imaginet On Demand Online Web Training

– Scrum/Kanban• Professional Scrum Foundations (PSF) (2 days)• Professional Scrum Master (PSM) (2 days)• Professional Scrum Developer (PSD) (5 days)• Professional Scrum Master (PSM) Using Microsoft ALM (3 days)• Accredited Core Kanban Using Microsoft ALM (3 days)

To register or for more information, please visit our website here: http://www.imaginet.com/ or contact us: [email protected]

More Webcasts on ALM / TFS / Visual Studio 2012

• Operations Management in the Application Lifecycle• January 31 (1:00-2:30pm CT)

• How Microsoft's ALM Tools Can Improve Your Bottom Line• February 4 (1:00-2:00pm CT)

• Upgrading to TFS 2012: What You Need to Know!• February 7 (1:00-2:30pm CT)• February 21 (1:00-2:30pm CT)

Upcoming ALM Workshops & Webcasts:

• Getting Started With Coded UI testing: Building Your First Automated Test• February 14 (1:00-2:30pm CT)• February 28 (1:00-2:30pm CT)

• Lean, Kanban, and TFS • March 7 (1:00-2:30pm CT)• March 21 (1:00-2:30pm CT)

• Using Lean and Kanban to Revolutionize Your Organization• March 11 (1:00-2:00pm CT)

• The newest of the new with Visual Studio and TFS 2012• March 14 (1:00-2:30pm CT)• March 28 (1:00-2:30pm CT)

Email us at:[email protected]

ALM Planning & Implementation ServicesALM Planning • ALM Assessment & Envisioning Workshops

(3 or 5 days)• VS & TFS Migration Planning Workshop (5

days)• TFS Deployment Planning* (5 days)• Visual SourceSafe to TFS Migration

Planning* (3 Days)• Visual Studio Quality Tools Deployment

Planning* (5 days)

Upgrade• TFS 2010 Adoption Quick Start (5 or 10

days)• TFS 2012 Adoption Quick Start (5 or 10

days)• TFS 2010 Upgrade Quick Start (10 days)• TFS 2012 Upgrade Quick Start (10 days)

Remote Support• Remote Support for TFS & Visual Studio

Lab• Visual Studio Lab Management Quick Start

(10 days)

Testing• Manual Testing with Test Manager Quick

Start (5 days)• Visual Studio Testing Tools Quick Start (10

days)• Visual Studio Automated Testing Quick Start

(5 days)• Visual Studio Load Testing Quick Start (5 or

10 Days)

Builds• Automated Build & Release Management

Quick Start (5 days)• Automated Build Center of Excellence (CoE)

Database• Visual Studio Database Tools Quick Start (10

days)

Integrations• Team Foundation Server (TFS) & Project

Server Integration Quick Start (10 days)• TFS & Quality Center Integration/Migration

Quick Start (10 days)

For questions or more information,please contact us at:

[email protected] or (972)607-4830

http://www.imaginet.com


Recommended