TOWARD TOKYO 2020: PROCUREMENT, ACCREDITATION AND CERTIFICATION PRESENTATION TO THE JAPANESE ACCREDITATION BOARD 11 TH AUGUST 2015 Dr Mervyn Jones Sustainable Global Resources United Kingdom
Transcript
Page 1: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

TOWARD TOKYO 2020: PROCUREMENT, ACCREDITATION AND CERTIFICATION

PRESENTATION TO THE JAPANESE ACCREDITATION BOARD11TH AUGUST 2015

Dr Mervyn JonesSustainable Global ResourcesUnited Kingdom

Page 2: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

CONTENTS

Introduction to sustainable events

Experiences from London 2012

Experiences with Rio2016

Recommendations to Tokyo for 2020

SUSTAINABLE GLOBAL RESOURCES LTD 2

Page 3: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

EVENTS DELIVERY PROCESS

Initiation PlanningImplement-

ationDelivery Closure

Development Phase (1)• define

purpose• prioritise

goals• set objectives

Development Phase (2)• identify event

requirements• know your waste• set targets

Pre-Production Phase• contract

specifications• define funding• time, cost,

quality• co-ordinate

event elements

ProductionPhase• deliver event• communicate• manage

exceptions• monitor and

review progress

Post Production Phase• take down• measure and

evaluate• report and share

IS020121 activities map onto all stages.

pre-event in-event post-event

waste prevention waste management

SUSTAINABLE GLOBAL RESOURCES LTD 3

Page 4: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

EVENT AND MATERIALSWhat:

Construction

Temporary

materials & overlay

Marketing &

collateral

Catering &

packaging

Other e.g. hazardous

Who:

Workforce

Spectators

Participants

Admin & media

Where:

Front of house

Back of house

(behind the

scenes)

Outside

controlled areas

Why:

cost savings,

potential

income,

corporate social

responsibility

legal obligations

SUSTAINABLE GLOBAL RESOURCES LTD 4

Page 5: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

LONDON 2012Background & experience

Page 6: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

DECISION MAKING PROCESS

SUSTAINABLE GLOBAL RESOURCES LTD 6

Potential impact

Important

Control

Influence

Beyond scope

yes

no

no

no

FeasibilityPre-

productionDelivery Evaluation Legacy

Evaluation criteria

Supply chain

standards

Page 7: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SD PRINCIPLES & PRIORITIES

SUSTAINABLE GLOBAL RESOURCES LTD 7

Principles Implication

Transparency • How much and how frequently to share

with stakeholders?

Integrity • What level of formal market analysis, risk

assessment?

• How will suppliers be managed?

Stewardship • What is scope and reduction of

environmental footprint?

Inclusivity • Who are interested parties and how will

they be engaged?

• How will their needs be addressed?

Page 8: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

CHALLENGES

LOCOG developed its own guidance for temporarydesign and materials as none was previously available.

The approach included:

Establishing a design and procurement working group.

Developing guidance and updating technical specifications, which led to sustainable design being achieved in the temporary market.

Working with suppliers to design more efficient products and reviewing materials

SUSTAINABLE GLOBAL RESOURCES LTD 8

‘Challenges in sustainable design helped define approach to procuring and managing suppliers’

Page 10: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

INTEGRATING SUSTAINABILITYFour key aims for integrating sustainable development management into the procurement process:

1. Minimising negative impacts of products and/or services

e.g. impacts on health, air quality, generation of hazardous waste, social impacts due to alcohol and other drugs

2. Minimising demand for resources

e.g. by using resource-efficient products such as energy efficient appliances, fuel-efficient vehicles and products incorporating recycled content

3. Minimising the negative impacts of the supply chain itself, in particular the social aspects

e.g. by giving preference to local suppliers and “sheltered workshops” - where the workforce includes a proportion of those with disabilities - and organisations that meet minimum ethical, human rights and employment standards, including equal opportunities

4. Ensuring that fair contract terms are applied and respected.

SUSTAINABLE GLOBAL RESOURCES LTD 10

Page 11: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

L2012 PROCUREMENT POLICY

Step one

Registering – online

Step two

Qualifying - registered companies applications and evaluation against pre-determined criteria in line with SD principles

Step three

Submitting a tender - tenders shortlisted or selected from frameworks.

SUSTAINABLE GLOBAL RESOURCES LTD 11

Contract Award

Step 3

Step 2

Step 1

Page 12: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

L2012 PROCUREMENT

SUSTAINABLE GLOBAL RESOURCES LTD 12

Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement, equal-opportunity, diversity, environmental and sustainability policies of LOCOG (including the Ethical Trading Initiative Base Code, the Code on Conflict of Interests and the Code on Gifts and Gratuities) that are notified by LOCOG to the Supplier from time to time or published on LOCOG’s website from time to time.

Example of sustainability clauses in a direct supplier contract 3.12 The Supplier shall comply with such practices, procedures and guidelines reasonably required by LOCOG, and shall procure that its Connected Persons do the same. In particular, the Supplier shall conduct its activities pursuant to this Agreement with regard to applicable environmental laws and equal opportunity laws and any equal opportunity, diversity, environmental and sustainability policies of LOCOG as advised to it by LOCOG from time to time (including the Sustainable Sourcing Code), and shall procure that its Connected Persons do the same. The Supplier shall use best endeavours to ensure that the Goods do not go to landfill following the Games.

Page 13: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SUSTAINABLE GLOBAL RESOURCES LTD 13

SUPPLY CHAIN ENGAGEMENT

Page 14: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

14

SUSTAINABLE SOURCING QUESTIONS

What will happen to it

afterwards?

Where does it come from?

Who made it?

What is it made of?

What is it wrapped in?

SUSTAINABLE GLOBAL RESOURCES LTD

Page 15: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

FOOD VISION

SUSTAINABLE GLOBAL RESOURCES LTD 15

Five main themes:

Food safety and hygiene

Choice and balance – including a diverse, high quality, value for money and accessible range of food and beverage catering for all dietary and cultural requirements.

Food sourcing and supply chain

Environmental management

Skills and education - not simply short-term initiatives but rather kick-start the legacy of London 2012 by seeking to develop the catering and hospitality industry as a whole.

Benchmark standardAll food must achieve this standard or a demonstrable

equivalent and comply with the LOCOG Sustainable Sourcing

Code

Aspirational standardsAs many of these standards should be achieved, or a

demonstrable equivalent where food is available and

affordable

E.g. Plant-based produce (fruit, vegetables, salads, cereals)

• Red Tractor Assured, UK Grade 1 or 2 (where Grade 2

relates only to appearance). Where available, British,

seasonal and of high quality, fit for purpose and free from

damage or spoilage.

• Where products are not available from the UK, and not

available under the Red Tractor Assurance Scheme, they

will need to be fully traceable.

• Bananas, tea, coffee and sugar to be Fairtrade.

• LEAF Marque certified

• Organic

• Products that are ethically traded/sourced (including

Fairtrade certified and/or Rainforest Alliance certified)

• GLOBALGAP certified or comparable standard

Page 16: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SUSTAINABILITY EXAMPLES

Demolition – 98% or 445,000 tonnes material reused or recycled 20,000 lorry movements avoided 2 million cu metres soil excavated, ca 80% reused (Atkins)

Concrete – substitution with GG Blast Slag and PFA; London Aquatics

Centre (London Concrete) recycled content levels of 22% (170,000 tonnes) Reduced concrete design saved 65,000cu metres, 120,000

tonnes aggregate and 20 tonnes CO2eq.

Catering – Food Vision (e.g. Aramark)

Waste collection and separation – improved efficiencies(Sita, Hampden MRF)

Recycling communications plan – legacy of extra 24,000 tonnes domestic recycling

SUSTAINABLE GLOBAL RESOURCES LTD 16

Page 17: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

CARBON MANAGEMENT

London 2012 estimated footprint was 3.3MtCO2e

emissions ‘owned’ by LOCOG and the ODA made up 66% (2.3 MtCO2e) were reduced to 2.19 MtCO2e (57%) against reference footprint through initial prevention measures Energy – energy conservation policy &action plan

implemented at all venues

Overlay - Furniture, fixtures and fittings e.g. hiring items rather than purchasing them

Ceremonies – Olympic Torch Relay

SUSTAINABLE GLOBAL RESOURCES LTD 17

Page 18: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

EMBODIED CARBON

Portable buildings

SUSTAINABLE GLOBAL RESOURCES LTD 18

Roads & pavement

Tented structures

Temporary electrical

Seating

Fencing, drainage & fitout

Page 19: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

CARBON COMPENSATIONLondon 2012’s carbon compensation strategy encompassed the following five areas:

Transfer of knowledge and best practice

Reuse of assets and infrastructure e.g. donations to local communities

Local energy efficiency and retrofit projects e.g. on-Park photovoltaics, wind turbines and CHP

Behaviour change campaigns e.g. recycle now

Partner carbon offset initiatives e.g. BP Target Neutral

SUSTAINABLE GLOBAL RESOURCES LTD 19

Page 20: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

LEGACY CASE STUDY

Glasgow 2014 Commonwealth Games

2 year cycle for 71 nations

1st CG to achieve ISO20121

Exceeded 80% Games recycling

Compostable packaging (EN13432) addressed food and plastic/paper contamination

furniture and fittings from L2012 Athletes village

SUSTAINABLE GLOBAL RESOURCES LTD 20

“Suppliers and subcontractors shall support the OC in adopting Zero Waste principles”

“Use of primary, secondary and tertiary packaging should be minimised and made from materials that can be reused, recycled, or recovered by commonly available methods”

Page 21: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

RIO 2016Background & experience

Page 22: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

RIO2016 SUSTAINABILITY MISSION

To deliver excellent Games, with memorable celebrations, that will enhance the global image of Brazil and promote sustainable social and urban transformations through sport, contributing to the growth of the Olympic and Paralympic Movements.

Strategic objective Theme

1. Planet: Reducedenvironmental footprint

1.1 Transport and logistics1.2 Sustainable design and construction1.3 Environmental conservation/clean-up1.4 Waste management

2. People: Games for all 2.1 Involvement and awareness2.2 Universal access2.3 Diversity and inclusion

3. Prosperity: Responsible andtransparent management

3.1 Sustainable supply chain3.2 Management and reporting

Source: Sustainability Management Plan, March 2013

Encouraging the adoption of the ISO 20121 sustainability standard for events, which was launched in June 2012 and seeking its own certification.

SUSTAINABLE GLOBAL RESOURCES LTD 22

Page 23: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SPECIFIC EXAMPLES• Temporary venues and overlay - benchmarks will be a legacy

for Brazil’s events sector

• Permanent venues built by the municipal government - LEED

certified & energy economy seal from Brazil’s National

Electrical Energy Conservation Programme (PROCEL).

• Construction projects subject to Brazil’s National Environmental

Council (CONAMA) and the Environmental Institute of the

State of Rio de Janeiro (INEA), construction code and zoning

laws of the city of Rio de Janeiro, as well as the rules of the

Brazilian Association of Technical Standards (ABNT) and the

National Institute of Metrology (INMETRO).

• International conventions, such as the Montreal Protocol, Basel

Convention, Stockholm Convention and the Convention on

Biological Diversity respected.

• Alignment with cultural diversity as part of the services to the

athletes, when relevant, e.g. food & religion.

SUSTAINABLE GLOBAL RESOURCES LTD 23

Page 24: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SUPPLY CHAIN SUSTAINABILITY

The Rio2016 sustainable supply chain is structured into five stages:

1. Establishment of the requirements

2. Development and training of suppliers and licensees

3. Contracting

4. Management/monitoring of the contracts for compliance of

suppliers and licensees

5. Dissolution/or final disposal of products

Brazil is already strong in sustainable public procurement, e.g. DECREE

7.746, (2012), establishes criteria, practices and guidelines for the

promotion of national sustainable development in contracts signed

by the direct federal administration, authorities, foundations and

dependent state companies.

SUSTAINABLE GLOBAL RESOURCES LTD 24

Page 25: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

SUPPLY CHAIN SUSTAINABILITY

Rio2016 encourages all its specialised, events sector suppliers to

obtain ISO 20121 - Sustainability in Event Management certification.

For other suppliers, including small and medium-sized enterprises,

Rio2016 encourages submission of the following certifications:

• ISO 9001 - Quality Management

• ISO 14001 - Environmental Management

• NBR 16001 or SA 8000 and/or proof of adoption of ISO 26000

guidelines - Social Responsibility Management

• OHSAS 18001 - Health and Safety Management

Rio2016 considers possession of the certifications mentioned above as

a competitive advantage and this will be reflected in the evaluation

process.

Further analyses of critical categories will define which of the

certifications will be mandatory.

SUSTAINABLE GLOBAL RESOURCES LTD 25

Page 26: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

RIO2016: TRAINING

Resource efficiency

Food waste reduction & management

Waste management

Sustainable Procurement

SUSTAINABLE GLOBAL RESOURCES LTD 26

Page 27: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

TOKYO 2020

Recommendations

Source: © IOC/Richard Juilliart

Page 28: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

ISO20121 SUSTAINABLE EVENTS

ISO 20121 requires you to:

Identify your issues in relation to your event management operations

Outline your commitments to sustainability in the form of a sustainability policy

Develop SMART objectives and targets in relation to sustainability

Train your staff on sustainability

Engage your suppliers on sustainability

Develop a sustainability communications plan

Monitor and measure your success

Audit and review your documentation

SUSTAINABLE GLOBAL RESOURCES LTD 28

Page 29: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

MATURITY MATRIX

Consider developing and implementing a matrix to measure and stimulate TOCOG organismal development

Measure sustainable development on scale ranging from minimum involvement to full development

Measure against adopted principles

SUSTAINABLE GLOBAL RESOURCES LTD 29

Page 30: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

MATERIALITY

SUSTAINABLE GLOBAL RESOURCES LTD 30

Select from appropriate approaches, tools and techniques

to assess and manage sustainable procurement. These

include the following:

a) weighting/scoring systems: quantitative/qualitative as

applied to the KPIs;

b) life cycle assessment and whole life costing: impacts

based on a “cradle-to-cradle” approach;

c) the environmental purchasing hierarchy: “rethink,

eliminate, reduce, re-use, recycle, dispose”;

d) supplier code of conduct: standards for specific industry

sectors/areas defined by the industry and their

appropriate performance levels;

e) best value - enables sustainable development, including

quality management, to be taken into account when

service delivery options are being considered.

Page 31: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

USING ISO20121 IN PROCUREMENT

SUSTAINABLE GLOBAL RESOURCES LTD 31

a)define the scope of sustainable procurement;

b)state the desired performance level;

c)define the approach/criteria for assessing suppliers during tender

evaluation;

d)assess consistency and alignment of performance requirements

for suppliers with the organisation's expectations for itself.

KPIsTargets

Issues Objectives

Tokyo 2020 Games

Page 32: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

LEGACY

Infrastructure – redevelopment of Stratford, recycling etc.

Processes – ISO20121, sourcing, food vision etc

Data – knowledge base

Tools – RMP tool

Cascade effect – embedding sustainability in supply chain

Healthier lifestyles – more participation in sport

Leadership & inspiration

SUSTAINABLE GLOBAL RESOURCES LTD 32

Page 33: TOWARD TOKYO 2020 · Contract Award Step 3 Step 2 Step 1. L2012 PROCUREMENT SUSTAINABLE GLOBAL RESOURCES LTD 12 Sustainable Sourcing Code: 6.3 The Supplier shall comply with any procurement,

ARIGATŌ THANK YOU

[email protected]

SUSTAINABLE GLOBAL RESOURCES LTD

?QUESTIONS?

ありがとう

持続可能な世界的資力


Recommended