Town of Southington, CT Town of Southington, CT Pavement Management Study Pavement Management Study Presented by: Vanasse Hangen Brustlin, Inc. March 12, 2012
Transcript
Page 1: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Town of Southington, CTTown of Southington, CTPavement Management StudyPavement Management Study

Presented by: Vanasse Hangen Brustlin, Inc.March 12, 2012

Page 2: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Presentation OverviewPresentation OverviewTow

n

• Pavement Management Concepts

P t M t i S thi t of Southin

• Pavement Management in SouthingtonCurrent Conditions & BacklogB d t A l i

ngton -Pa

Budget Analysis

• Recommendations avement MM

anagemeent

Page 3: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsTow

n

What is Pavement Management?What is Pavement Management?

of Southin

• The practice of planning for pavement maintenance and rehabilitation with the goal of  ngton -

Pa

maximizing the value and life of a pavement network. avem

ent MOtherwise known as Managem

e

Otherwise known as“Getting the Biggest Bang for Your Buck”

ent

Page 4: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management Conceptsg pTow

n

The ProcessThe Process

of Southin

• Pavement Section Inventory• Pavement distress identification and quantification

ngton -Pa

(Visual Inspection Only)

• Pavement Condition Index (PCI) calculation on a 0 - 100 scaleD fi T O i d C

avement M

• Define Treatment Options and Costs• Test various Budget Scenarios• Develop list of candidate projects

Managem

e

• Develop list of candidate projects• Apply engineering and local judgment to define annual road

program ent

p g

Page 5: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management Conceptsg pTow

n

Pavement Deterioration CurvePavement Deterioration Curve

of Southinngton -Pa

$1 for renovation here

avement M

Will cost $18 – $23 Here M

anagemeent

Page 6: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsPavement Management ConceptsTow

n

No Immediate MaintenanceNo Immediate Maintenance (PCI (PCI 9933--100100))

of Southinngton -Paavem

ent MManagem

e

Mount Vernon Road

entMount Vernon Road

Page 7: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsPavement Management ConceptsTow

n

Routine Maintenance Condition (PCI Routine Maintenance Condition (PCI 8866--9922))

of Southinngton -Paavem

ent MManagem

eSaddlebrook Path ent

Treatment options – Crack sealing, patching

Page 8: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsPavement Management ConceptsTow

n

Preventive Maintenance Condition (PCI Preventive Maintenance Condition (PCI 7755--8855))

of Southinngton -Paavem

ent MManagem

eWestbrook Road ent

Treatment options – Crack sealing, surface seal, thin overlay

Page 9: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsPavement Management ConceptsTow

n

Structural Improvement Condition (PCI Structural Improvement Condition (PCI 5757--7474))

of Southinngton -Paavem

ent MManagem

eSun Valley Drive ent

Treatment options – Overlay or Mill & Overlayy

Page 10: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management ConceptsPavement Management ConceptsTow

n

Base Rehabilitation Condition (PCI Base Rehabilitation Condition (PCI 00--5656))

of Southinngton -Paavem

ent MManagem

eSchool Street ent

Treatment options – Reclamation, Reconstruction

Page 11: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southington

A d d I dA d d I d

g gTow

n

100

No Immediate Maintenance

Average Roadway Pavement Condition Index = 76Average Roadway Pavement Condition Index = 76

of Southin

80

90Routine Maintenance

Preventive Maintenance

ndex

76 ngton -Pa60

70

Structural Improvement 

ndition In 76

avement M

50 Base Rehabilitation

ment  Con

Managem

e

30

40

Pavem

ent

20

Age, years

Page 12: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southingtong gTow

n

Roadway Pavement Condition Index DistributionRoadway Pavement Condition Index Distribution30 of Southin

25

ngton -Pa15

20

way

Mile

s

avement M

10Road

w

Managem

e0

5

ent0-40 41-45 46-50 51-55 56-60 61-65 66-70 71-75 76-80 81-85 86-90 91-95 96-100

Pavement Condition Index

Page 13: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Current Condition 

Town

GIS Map

of Southinngton -Paavem

ent MManagem

eent

Page 14: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southington

Current Roadway Pavement BacklogCurrent Roadway Pavement Backlog

g gTow

n

Current Roadway Pavement BacklogCurrent Roadway Pavement Backlog

Pavement Treatment Band Miles Cost of Southin

Do Nothing 33.1 $0

Routine Maintenance 26 8 $430 000 ngton -Pa

Routine Maintenance 26.8 $430,000

Preventative Maintenance 50.7 $5,280,000 avement M

Mill & Overlay 69.8 $23,690,000

Base Rehabilitation 22 4 $17 040 000

Managem

e

Base Rehabilitation 22.4 $17,040,000

Pavement totals: 202.8 $46,440,000 ent

Page 15: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southingtong gTow

n

Current Roadway Pavement Backlog SummaryCurrent Roadway Pavement Backlog Summary

of Southin

COST MILES

ngton -Paavem

ent MManagem

eent

Page 16: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southingtong gTow

n Current Funding ‐ $1 0 M/yr for 10 years

Funding ScenariosFunding Scenarios

of Southin

Current Funding ‐ $1.0 M/yr for 10 years(PCI decreases to 54)

ngton -Pa

Maintain PCI ‐ $4.5 M/yr for 10 years(PCI remains at 76)

avement M

(PCI remains at 76)

I PCI $ M/ f 10

Managem

e

Improve PCI ‐ $5.5 M/yr for 10 years(PCI increases to 81) ent

Page 17: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southington

Future Roadway Pavement Condition ComparisonFuture Roadway Pavement Condition Comparison

g g

Future Roadway Pavement Condition ComparisonFuture Roadway Pavement Condition Comparison

88

92

76

81

76

80

84

Inde

x

76

64

68

72

Con

ditio

n

5452

56

60

Pave

men

t C

Current Funding

40

44

48

52P

Maintain PCI

Improve PCI40

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Page 18: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southingtong gTow

n

Annual Maintenance Cost ComparisonAnnual Maintenance Cost Comparison

of Southin

Annual Road Budget                               Annual Auto Maintenance $$$$1 000 000 $125

ngton -Pa

$1,000,000                                                                  $125‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ =      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Total Value of Road Network                             Value of a New Car avem

ent M

o a a ue o oa Ne o a ue o a Ne Ca$160,000,000                                                             $20,000

Managem

eent

Page 19: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southington

C t C i f 2 R d R i P tiC t C i f 2 R d R i P ti

g gTow

n

Cost Comparison of 2 Roadway Repair PracticesCost Comparison of 2 Roadway Repair Practices(Example below of a typical street)

100

of Southin85

90

95

ndex ngton -

Pa

70

75

80

nditi

on In

avement M60

65

70

emen

t Co

Managem

e45

50

55

Pave

Capital Repair Only Approach = $99/ sq yd over 40 years

Maintenance Based Approach = $67/ sq yd over 40 years ent

402012 2016 2020 2024 2028 2032 2036 2040 2044 2048 2052

Maintenance Based Approach $67/ sq yd over 40 years

Page 20: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Pavement Management in Southington

C t C i f 2 R d R i P tiC t C i f 2 R d R i P ti

g gTow

n 100

Cost Comparison of 2 Roadway Repair PracticesCost Comparison of 2 Roadway Repair Practices(Example below of a typical street)

of Southin85

90

95

ndex ngton -

Pa

70

75

80

nditi

on In

avement M60

65

70

emen

t Co

Managem

e45

50

55

Pave

Capital Repair Only Approach = $99/ sq yd over 40 years

Maintenance Based Approach = $67/ sq yd over 40 years ent

402012 2016 2020 2024 2028 2032 2036 2040 2044 2048 2052

Maintenance Based Approach $67/ sq yd over 40 years

* Costs in today’s dollars

Page 21: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Annual Road Program DevelopmentAnnual Road Program Development

Determine effecti e f nding le els

Town

Determine effective funding levels

System recommends roads of highest benefit to the Town based on: of Southin

based on:

High Traffic Volume Lower Repair Cost ngton -

Pa

Lower Repair Cost Longer Repair Life Expectancy Poorer Road Conditions

avement M

The system allocates annual budget to high benefit roads and analyzes the effect on overall town wide conditions. M

anageme

Engineering judgment is used to adjust the program to reflect coordination with other projects, neighborhood programs,

bili ti ffi i i t

entmobilization efficiencies, etc.

Page 22: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

RecommendationsRecommendationsTow

n

Identify pavement condition goals

Budget adequate funds to achieve those goals of Southin

Budget adequate funds to achieve those goals

Use the Right Tool at the Right Time in the Right Place

ngton -Pa

Implement full spectrum of pavement treatments

C ti t i t i d t d t t d t

avement M

Continue to maintain updated pavement management data

Continue to utilize pavement management system to help plan Managem

e

optimal road program

ent

Page 23: Town of Southington, CT Pavement Management Study · Continue to utilize pavement management system to help plan anagem e optimal road program nt. Town of Southington, CT Pavement

Town of Southington, CTTown of Southington, CTPavement Management StudyPavement Management Study

Questions and AnswersQuestions and Answers

Presented by: Vanasse Hangen Brustlin, Inc.March 12, 2012March 12, 2012